HomeMy WebLinkAbout1999-Final (Bldg & HVAC) CITY OF OSHKOSH CORRECTION NOTICE:
CONTRACTOR: 1 t•• Time Insp. Called In
Date
ADDRESS: 1 D ■6. 1----NA Time Insp. Needed
Requested By
Of
Phone #
Project to be Inspected KIN Comm
Means of Access
BUILDING: PLUMBING: ELECTRIC: HVAC: EROSION CONTROL: PROPERTY MAINT.:
Footing Rough Rough Rough Tracking Setback Park.
Foundation Test On Service Furnace Silt Fence Unlicensed Veh.
Rough Underfloor Amps Ph A/C Stone Access Garbage
Insulation Sewer/Water Temp Perm Fireplace E.C. Bales Dilapidated bid's,
Bsmt. Floor / Reinsp. UG OH Reinsp. Reinsp. fences, etc.
Reinsp. ✓/ Final Reinsp. Final ,m Final Ext. Maint.
Final Other Final Other Other Other
Other Other
ITEM# CODE INSPECTION RESULTS
t —r 0` -T Z?4h`�• ' �` `r.S� — 71) ` r1 IZ.. T Akc C 1S tJ�Z.k 9S
Z :�woc .T Z� 30.e. ►RS .2 '�\ �Q � L�: SL
Lc.,,.- w( 1� t, 41Q___ ,I.t. ti.. ,-_,wm.0,x , .---:.
( .�� "C` l Cf L `Sb r c __.rl
(A `rov 'c?0( c__. t,.:) / 1.t. ' u r i—rri ( s
t) 1 ittiZ -- LA...) I . I ,X`,,I p t_S ` ?-.OX
_- tC. . /1S' i M..k 6(j/¢6-L__ — CZ ---` 4.1/4..I 11 .r. CA( 9...
,y b a < t S\ `- rt 1 i Ktj•• - QU til CJk j
- r . P Ae5.. -‘1. (1 . `— rtl .. LM ZL
F1 ` c.Mcet,s -r - i - z) TF{ ` ..ate v3 l `Tl• l _.
,.k::. .. t o_if &' - rk.A + A.I . -P 0 S
• C L./ n�� s`rt
-1 4- -4 - vs;> 0 A ,'5 ; /0 yt- P
i'' ■Jt f\tu r w(»- '111. b t CO c KA
VIOLATIONS MUST BE CORRECTED AND APPROVED WITHIN 30 DAYS UNLESS NOTED BELOW
CALL FOR INSPECTIONS BEFORE CONCEALMENT AND /OR OCCUPANCY!!
COMPLIANCE DATE: 0 .-- -' O U c,
Action Taken: of Approved/ Inspection Report left on site
Not Approved/ Inspection Report given to
(Li Si gned
k j
L (� I�; a -
Inspection Services Division Date Of Inspection Phone Number
CITY OF OSHKOSH CORRECTION NOTICE: CO
CONTRACTOR: LATFA -�' Time Insp. Called In
, ` Date
ADDRESS: 2..}04..1 p '�
?, c . L . Time Insp. Needed
Requested By
Of
Phone # A �
Project to be Inspected i Com /Res
Means of Access
BUILDING: PLUMBING: ELECTRIC: HVAC: EROSION CONTROL: PROPERTY MAINT.:
Footing Rough Rough Rough Tracking Setback Park.
Foundation Test On Service Furnace Silt Fence Unlicensed Veh.
Rough Underfloor Amps Ph A/C Stone Access Garbage
Insulation Sewer/Water Temp Perm Fireplace E.C. Bales Dilapidated bld's,
Bsmt. Floor Reinsp. UG OH Reinsp. Reinsp. fences, etc.
Reinsp. / Final Reinsp. Final -' Final Ext. Maint.
Final ✓ Other Final Other Other Other
Other Other
ITEM# CODE INSPECTION RESULTS
f h. , '■. F Z '` L bl. A_K—+ ),
1
VIOLATIONS MUST BE CORRECTED AND APPROVED WITHIN 30 DAYS UNLESS NOTED BELOW
CALL FOR INSPECTIONS BEFORE CONCEALMENT AND /OR OCCUPANCY!! l
COMPLIANCE DATE Z Lk-'0, 4
Action Taken: ❑ Not Approved/ Inspection Report left on site
❑ Not Approved/ Inspection Report given to
Signed 62 -'k'`- 1 1 I q --
Inspection Services Division Date Of Inspection Phone Number