Loading...
HomeMy WebLinkAboutPlumbing #M3-78-1090-P } Nov. 7, 1990 Schroeder & Holt Architects 212 W. Wisconsin Ave. Milwaukee, WI 53203 RE :Plumbing Plan Approval for 340 S. Koeiler St. Oshkosh Cinema #M3- 78 -1090P Gentlemen: Examination of the plumbing plans and specifications for the above mentioned project has been completed. In accord with Chapter 145, Wisconsin Statute, and ILHR 81 through 85, Wisconsin Administrative Code, the plumbing plans and specifications are approved contingent upon compliance with the stipulation noted below: 1. Flow controls where required by manufacturer shall be installed. ILHR 82.34 2. Locations Grease interceptor shall be aooessible for service, maintenance, repair and inspection. ILHR 82.34 The architect, professional engineer, registered designer, owner or plumbing contractor shall keep, at the construction site, one set of plans bearing the stamp of approval. In the event installation of this plumbing system has not commenoed within two years from this date, this approval shall become void. A new application accompanied by full examination fee shall be filed and an updated approval received before work may commence. In granting this approval, the City of Oshkosh or its representative does not hold itself liable for any defects in plans or specification, plan omissions, examination oversight, cons or any damage that may result in or after installation and reserves the right to order changes or additions should conditions arise making this necessary. It shall be necessary for installing plumber to obtain a plumbing permit from the City of Oshkosh before proceeding with actual installation of this plumbing system or any of its parts. Sincerely, WALTER CALLIES Plumbing Inspector WC : mr