Loading...
HomeMy WebLinkAboutPlumbing #F3-22-492P May 5, 1992 Sommerville Assoc. 2020 Riverside Dr. Green Bay, WI 54301 RE: Shopko Oshkosh Remodel 1300 Koeller St F3- 22 -492P Gentlemen: Examination of the plumbing plans and specifications for the above mentioned project has been completed. In accord with Chapter 145, Wisconsin Statutes, and ILHR 81 through 85, Wisconsin Administrative Code, the plumbing plans and specifications are approved contingent upon compliance with the stipulations noted below: 1. ILHR 82.35 Branches. The architect, professional engineer, registered designer, owner or plumbing contractor shall keep, at the construction site, one set of plans bearing the stamp of the approval. In the event installation of this plumbing system has not com- menced within two years from this date, this approval shall become void. A new application accompanied by full examination fee shall be filed and an updated approval received before work may commence. In granting this approval, the City of Oshkosh or its representa- tive does not hold itself liable for any defects in plans or specification, plan ommissions, examination oversight, contruc- tion or any damage that may result in or after installation and reserves the right to order changes or additions should condi- tions arise making this necessary. It shall be necessary for the installing plumber to obtain a plumbing permit from the City of Oshkosh before proceeding with actual installation of this plumbing system or any of its parts. Sincerely, WALTER CALLIES Plumbing Inspector