HomeMy WebLinkAboutPlumbing #F3-22-492P May 5, 1992
Sommerville Assoc.
2020 Riverside Dr.
Green Bay, WI 54301
RE: Shopko Oshkosh Remodel
1300 Koeller St
F3- 22 -492P
Gentlemen:
Examination of the plumbing plans and specifications for the
above mentioned project has been completed.
In accord with Chapter 145, Wisconsin Statutes, and ILHR 81
through 85, Wisconsin Administrative Code, the plumbing plans and
specifications are approved contingent upon compliance with the
stipulations noted below:
1. ILHR 82.35 Branches.
The architect, professional engineer, registered designer, owner
or plumbing contractor shall keep, at the construction site, one
set of plans bearing the stamp of the approval.
In the event installation of this plumbing system has not com-
menced within two years from this date, this approval shall
become void. A new application accompanied by full examination
fee shall be filed and an updated approval received before work
may commence.
In granting this approval, the City of Oshkosh or its representa-
tive does not hold itself liable for any defects in plans or
specification, plan ommissions, examination oversight, contruc-
tion or any damage that may result in or after installation and
reserves the right to order changes or additions should condi-
tions arise making this necessary.
It shall be necessary for the installing plumber to obtain a
plumbing permit from the City of Oshkosh before proceeding with
actual installation of this plumbing system or any of its parts.
Sincerely,
WALTER CALLIES
Plumbing Inspector