HomeMy WebLinkAboutBuilding #Q3-79-0905 City of Oshkosh '
Division of Inspection Servic
215 Church Av e J L'A
PO Box 11 4j 78
Oshkosh WI 54903 - 11301,
OfHI^ www.ci.oshkosh.wi.us
ON THE WATER I�
September 13, 2005
Don Frost
MSI General Corp
PO Box 7
Oconomowoc, WI 53066
The Copps Corp
P.O. Box 473
Milwaukee, WI 53201
Site: Plan Number: Q3 -79 -0905
Guaranty Bank
1200 S Koeller St
Oshkosh WI 54902
For:
Description: Tenant space alterations
Object Type: Building only
Class of Construction: IIB - 392 Sq Ft.; Sprinklered
Occupancy: B: Business / Office
The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes and
Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner, as defined in Chapter
101.01(10), Wisconsin Statutes, is responsible for compliance with all code requirements
Key Item(s) / Conditions:
• IBC 901.2 Fire protection systems shall be installed, repaired, operated and maintained in accordance with
this code and the international fire code. (Construction of new walls may require the addition and or
relocation of sprinkler heads to maintain required coverage, and not obstruct spray patterns of fire
sprinklers)
• IFC 901.4 Fire protection systems shall be maintained in accordance with the original installation
standards for that system. Required fire protection systems shall be extended, altered, or augmented as
necessary to maintain and continue protection whenever the building is altered, remodeled or added to.
Alterations to fire protection systems shall be done in accordance with applicable standards. Submit plans
for fire sprinkler modifications.
• IBC 906.1 / IFC 906.3 The maximum travel distance allowed to a fire extinguisher is 75 feet.
• Comm 6130(3) This review does not include lighting. Comm 63.0001 Prior to installation, lighting
plans and calculations shall be prepared in compliance with the code. The plans shall be available upon
request.
• Comm 6130(3) / IMC 507.2 This plan review does not include heating, ventilation, or air
conditioning. HVAC plans are required to be submitted and approved prior to installation of HVAC
equipment
ii0briann'2005 Comm Plan Reti•iews\Qt 79 -0905 1200 S KoelieF SI I3kig Oniy.doc
Page 1 of 2
• Comm 61.31(4) Revisions to approved plans. All proposed revisions and modifications which involve
rules under this code and which are made to construction documents that have previously been granted
approval by the department or its authorized representative, shall be submitted to the office that granted the
approval. All revisions and modifications to plans shall be approved in writing by the department or its
authorized representative prior to the work involved in the revision or modification being carried out. A
revision or modification to a plan, drawing or specification shall be signed and sealed in accordance with
Comm 61.31(1).
SUBMIT:
• Comm 61.50 (4) Supervision. Prior to the initial occupancy of an alteration the supervising professional
shall file a compliance statement form SBD -9720 with this office.
A copy of the approved plans, specifications, and this letter shall be on -site during construction. All permits are required to
be obtained prior to commencement of work.
In granting this approval the City of Oshkosh Inspection Services Department reserves the right to require changes or
additions should conditions arise making them necessary for code compliance. As per state stats 101.12(2), nothing in this
review shall relieve the designer of the responsibility for designing a safe building, structure, or component.
Inquiries concerning this correspondence may be made to me at the number listed below or the address on this letterhead.
Respe
oe
Building Systems Consultant
(920) 236 -5051 Monday — Friday 7:30 A.M. to 8:30 A.M and 12:30 A.M to 1:30 P.M.
bnoe @ci.oshkosh.wi.us
cc: Property file
Fee Required $ 320.00
Fee Received $ 320.00
Balance Due $ 0.00
II' Imam-1 Comm Man ReviewslQ.3- 79 -04Q5 1200 S Koeller St Bldg Only .doc
Page 2 of 2