HomeMy WebLinkAboutPlumbing #G5-784 CITY OF
• WISCONSIN
I �:Y �i �Illill 1,
July 27, 1984
Lampert, Lee & Associates
10968 Highway 54 East
Wisconsin Rapids, Wisconsin 54494 /WOO S / C ffi?'
Re: Site plan, plumbing plan approval. Cofis 6. I
Id. # G5 -784
Gentlemen:
Examination of the plumbing plans and specifications for the abovementioned
project has been completed.
In accord with Chapter 145, Wisconsin Statutes, and Chapter H62 Wisconsin
Administrative Code, the plumbing plans and specifications are approved
contingent upon compliance with the stipulations noted below:
1. All cleanouts shall be frost protected. Cleanouts in traffic areas
shall be protected with buffalo box and sleeve.
2. Hydralic drainage design is assumed to drain area as per Engineer's
design.
3. All sewer shall be installed according to Wisconsin Plumbing Code.
The architect, professional engineer, registered designer, owner or plumbing
contractor shall keep, at the construction site, one set of plans bearing
the stamp of approval.
In the event installation of this plumbing system has not commenced within
two years from this date, this approval shall become void. A new application
accompanied by full examination fee shall be filed and an updated approval
received before work may commence.
In granting this approval, the City of Oshkosh or its representative does
not hold itself liable for any defects in plans or specification, plan
omissions, examination oversight, construction or any damage that may result
in or after installation and reserves the right to order changes or additions
should conditions arise making this necessary.
It shall be necessary for installing plumber to obtain a plumbing permit from
the City of Oshkosh before proceeding with actual installation of this
plumbing system or any of its parts.
Sincerely,
MARVIN HIGLEY
Plumbing Inspector
CITY HALL • 215 CHURCH AVENUE • P. O. BOX 1130 • OSHKOSH, WISCONSIN 54902