HomeMy WebLinkAboutBuilding & HVAC #84-07-0269-B r r;*/ ik
J State of Wisconsin Department of Industry, Labor and Human Relations
r
• October 11, 1984 SAFETY & BUILDINGS DIVISION
201 E. Washington Avenue
rue No. E -17581 P.O. Box 7969
Madison, Wisconsin 53707
Walter J. Okray
Ellis Stone Construction Company
P. O. Box 356
Stevens Point, WI 54481
Dear Mr. Okrays
Grocery Store
The Copps Corporation, Owner
• 1801 West 4th Avenue
Oshkosh, Winnebago County
Plan Number 84 -07- 0269 -B
Volutes 1,191,960 Cubic Peet
Peter C. Joseph, Supervising Professional
A.0
TUB 64.34 The duct construction requirements of this section apply to
anything inside the duct es well as the outside, therefore if combustible
materials are looated in the duet, they shall be isolated or Dowered with an
approved noncombustible material. Tf the material within the duct tunnel does
not comply with the oode, then the tunnel marmot be used as a ventilation air
duct and an alternate return ',etas must be utilised. Note: this is not
considered a plenum as cowered in TZAR 64.41.
Sincerely,
Rick Olson
Staff Engineer
(Tel. 608 -266 -9291)
RO,T00307
cos R -3 Covi11, phone 715- 346 -3493, Friday
Ashkaeh Building Inspector
The Copps Corporation
2828 Wayne Street
Stevens Point, WI 54481
DI LHR -SB D -5850