HomeMy WebLinkAbout11-22JANUARY 25, 2011 11 -22 RESOLUTION (CARRIED 7 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVAL OF CHANGE ORDER NO. 1 FOR PUBLIC WORKS CONTRACT NO. 09 -19 WITH FAITH TECHNOLOGIES FOR WASTEWATER TREATMENT PLANT PUMPING & METER STATIONS SCADA UPGRADES ( +$45,179.80) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: FAITH TECHNOLIGIES, INC. 2662 American Drive Appleton, WI 54914 Net Increase to contract: +$45,179.80 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 551 - 1910 - 1799 -00000 Sewer Utility — Construction Work in Progress ( 0 OfH 1H ON THE WATER MEMORANDUM TO: FROM DATE: RE: Honorable Mayor and Members of the Common Council Stephan M. Brand, Utilities Superintendent January 19, 2011 Change Order No. 1 for Contract No. 09 -19 - Wastewater Treatment Plant Pumping & Meter Stations SCADA (Supervisory Control and Data Acquisition) Upgrades BACKGROUND Change Order No. 1 for Contract 09 -19 is scheduled for consideration by the Common Council at their January 25, 2011 meeting. This project includes upgrades to the wastewater system liftstation telemetry technology from a telephone dial 'up system to radio communications, related software upgrades, and replacement of control panels at various locations. The contract was originally awarded to Faith Technologies of Appleton in October of 2009. ANALYSIS This change order includes additional work to upgrade programmable logic controllers at five sites to a newer version than that specified in the plans, provide light poles for antenna mounting at locations to fit neighborhood esthetics, and relocating an antenna installation at the Broad Street liftstation to Court Tower to eliminate construction of a individual tower. A deduct is also included for elimination of the tower at Broad Street and elimination of a second tower at the Blackwolf Sanitary District flow monitoring station. These changes were reviewed by our project consultant Matthew Merten from Strand Associates Inc. and found to be reasonable based on his experience with similar work. FISCAL IMPACT The project low bid of $1,031,810.00 included a $100,000.00 contingency allowance. Change order No. 1 will utilize $45,179.80 of the contingency fund for these revisions. Because of this contingency allowance, the revisions do not change the current contract price that was previously approved by the Council. RECOMMENDATIONS I recommend approval of the Change Order No. 1 to Contact No. 09 -19 in the amount of $45,179.80 to Faith Technologies. Respectfully Submitted, Approved: S� tip, W. &&- -61 bb GP f-7-�4�' Stephan M. Brand Mark Rohloff Utilities Superintendent City Manager STRAND ASSOCIATES, INC.- E N G I N E E R S 910 West Wingra Drive Madison, WI 53715 December 10, 2010 Phone: 608- 251 -4843 Fax: 608- 251 -8655 Office Locations CHANGE ORDER NO. 1 Madison, WI Joliet, IL PROJECT: Lift Stations and Flow Stations SCADA Upgrade Louisville, KY Lexington, KY OWNER: City of Oshkosh Mobile, AL Columbus, IN CONTRACT: 09 -19 Columbus, OH CONTRACTOR: Faith Technologies, Inc. Indianapolis, IN Milwaukee, WI Cincinnati, OH Phoenix, AZ Description of Change www.strand.com la Replace existing Allen Bradley Micrologix ADD 1500 PLCs at five lift stations with Allen Bradley Micrologix 1400 PLCs. Includes the cost for PLC programming at Broad Street Lift Station for Ethernet communication between RTU -5 and four wet weather pumps. lb Provide Ethernet cables between RTU -5 and ADD the four wet weather pumps at Broad Street Lift Station. le Provide a 200 -amp, 480 -volt, 3 -phase generator ADD receptacle at County Y Lift Station, two relay sockets for future MiniCAS units at Hickory, Washburn, Prairie Court, and County Y lift stations, 8- channel Ethernet switch in RTU -5 at Broad Street Lift Station, and an analog repeater module for each radar level transmitter at 28th Street, Murdock, Northside, Snell Road, Punhoqua, Washburn, Prairie Court, and Sawyer Creek Lift Stations. ld Provide pole- mounted light fixture at 28th DEDUCT Street Lift Station and light pole and fixture at Waukau Lift Station. Replace radios with telephone modems in the RTU panels at Black Wolf, Sunset, and Island View Floe Stations. Includes not providing the light poles at Sunset and Island View Flow Stations, not installing the new RTU panels at Sunset and Island View Flow Stations, and not providing the 100 -foot antenna towers at Black Wolf Flow Station and Broad Street Lift Station. $28,108.50 $ 1,243.25 $ 8,341.20 ($11,931.52) City of Oshkosh -Faith Technologies, Inc. Contract 09 -19, Change Order No. 1 STRAND Page 2 ASS OCIATES. INC' ENGINEERS December 10,2010 le Provide additional cables for SCADA ADD $ 1,281.53 computers and monitors in the Control Room at the WWTP. if Provide a repeater panel and associated ADD $15,395.47 antennas at Court Tower and install an antenna at Broad Street Lift Station. 1 g Provide conduit between the electrical service ADD $ 2,741.37 mounting station and the lift station hatch at Fountain Avenue Lift Station. TOTAL VALUE OF THIS CHANGE ORDER: ADD $45,179.80 Contract Price Adjustment Original Contract Price including the Contract Contingency $991,145.00 Allowance Contract Contingency Allowance for Changes $100,000.00 Total Value of this Change Order $ 45,179.80 Current Contingency. Allowance Balance including this $ 54,820.20 Change Order Adjustment in Contract Price this Change Order $ 0.00 Contract Completion Date Adjustment Original Contract Completion Date October 29, 2010 Contract Completion Date Adjustments due to previous 0 Days Change Orders Contract Completion Date Adjustments due to this 94 Days Change Order Current Contract Completion Dates including all January 31, 2011 Change Orders MJM:dIh1S:WA_D \1300 -- 1399 \1382 \044 \Wrd \Construction Services'RFPs & Change Orders \Change Order No. 1_12- 8- 10.doex i STRAND City of Oshkosh -Faith Technologies, Inc. Contract 09 -19, Change Order No. 1 Page 3 December 10, 2010 This document shall become a supplement to the Contract and all provisions will apply hereto. RECOMMENDED ENGINEER— Strand Associates, Inc. 12/ to /l O Date APPROVED CONTRACTOR -1~ aith Technologies, Inc. RECOMMENDED BY OWNER Date -0 -lo OWNER — Director of Public Works, City of Oshkosh APPROVED BY OWNER Date OWNER —Mark A. Rohloff, City Manager, City of Oshkosh Date OWNER — Pamela R. Ubrig, City Clerk, City of Oshkosh Date I certify that provision_ has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under this Change Order. OWNER —Peggy Steeno, Director of Finance, City of Date Oshkosh APPROVED AS TO FORM OWNER —Lynn Lorenson, City Attorney, City of Oshkosh Date MJM:dIh1S:\MAD11 3 00- -1 3 9 9\1 382 \0441Wrd1Constniction Services\RFPs & Change Orders,Change Order No. 1_12- 8- 10.docx