July 3, 1991
HCM Architecture
805 M. Main St.
Oshkosh, WI 54901
Dear Mr. Hansche:
Re: 141 N. Sawyer
Office Addition
File #I7-73-6918
Plan Approval for the aforementioned project has been withheld.
'�
Plan Approval for the referenced project is withheld pending the
receipt of additional information and/or revised plans. If the
additional information and/or plans are not received within 2
months the plans will be stamped "Not Approved" and returned.
Approval is withheld because of the following violations.
ILHR 52.02(2) Fire Department access to the basement shall be
)
provided.
ILHR 52.04(6)(b) Handicap accessability shall be provided
throughout the first floor.
ILHR 54.14 Unless electric or direct vent/sealed combustion
equipment is used, the mechanical rooms, new and existing, shall
be minimum 2 hour rated rooms.
ILHR 51.049 Any projections through rated walls and ceilings
shall be properly protected.
ILHR 63.12 Submit Thermal Performance Calculations for the addi-
tion.
ILHR 50.12 Submit Precast Concrete plans and calculations prior
} to placement of the precast flooring.
| |
Sincerely,
ALLYN DANNHOFF
Chief Building Inspector
AD:mr