HomeMy WebLinkAbout2006-Building (cooler/freezer addition) CITY OF OSHKOSH No 122365
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 105 N SAWYER ST Owner DAUN BOCK LLC Create Date 11/01/2006
Designer Contractor MAGIC AIR INC
Category 204 - Addition Amusement, Social, Recreation Plan T8-57 -0606
Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze
Zoning Class of Const: Size
Unfinished /Basement Sq. Ft. Rooms Height Ft. ❑ Projection I
Finished /Living Sq. Ft. Bedrooms Stories Canopies
Garage Sq. Ft. Baths Signs
Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use /Nature Restaurant / Cooler /Freezer Addition to west end of building.
of Work
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $26,550.00 Plan Approval $0.00 Permit Fee Paid $169.00 Park Dedication $0.00
Issued By: 0,1/7- 71,0 Date 11/01/2006 Final /O.P. 00 /00 /0000
❑ Permit Voided I Parcel Id # 0607960000
In the performance of this e•rk I agr- : to perform all work pursuant to rules goveming the described construction.
While the City of Oshkos =s o a I ority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit a • • li . on , in an easement • - City strongly urges the permit applicant to contact the easement
holder(s) and to secure a 1 _ a•pr• - •efore starting such activity.
Signature ,,<
� �� ° �� Date � 1/ /
+
Age . -
Address 670 INDUSTRIAL DR OMRO WI 54963 - 0000 Telephone Number 920 - 685 -2332
To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.