HomeMy WebLinkAbout11-04JANUARY 11, 2011
11 -04 RESOLUTION
(CARRIED 7 -0 LOST LAID OVER WITHDRAWN )
PURPOSE: ACCEPT STORM SEWER EASEMENTS AT VARIOUS
LOCATIONS BETWEEN KOELLER STREET & TIPLER SCHOOL
STORMWATER DETENTION BASIN
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
PLAN COMMISSION RECOMMENDATION: Approved
BE IT RESOLVED by the Common Council of the City of Oshkosh that the City
hereby accepts storm sewer easements, both temporary and permanent, at the
following locations and at other locations as may be necessary between South Koeller
Street and the Tipler School Stormwater Detention Basin, per the attached, and the
proper City officials are hereby authorized and directed to execute any and all
documents necessary for purposes of same.
A) Landmark Limited Partnership III, 300 South Koeller Street
B) Donald Olson, 251 South Westfield Street
C) Greg Roberts, 255 South Westfield Street
D) Xiong/Tong Yang /Mai Vang Pao; 240/250 South Westfield Street
OYHKOlH
ON THE WATER
TO: Honorable Mayor and Members of the Common Council
FROM: Darryn Buric '
Director of Planning Services
DATE: January 6, 2011
RE: Accept Storm Sewer Easements at Various Locations between Koeller Street and Tipler
School Stormwater Detention Basin (Plan Commission Recommends Approval)
BACKGROUND
The Department of Public Works is requesting acceptance of multiple storm sewer easements,
temporary and permanent, located between the 300 Block of South Koeller Street and the Tipler
School Area Stormwater Detention Basin (TDB) running around the south and east sides of Landmark
Plaza, along the north side of 251/255 South Westfield Street, and along the north side of 240/250
South Westfield Street. This area is located within the Campbell Creek Watershed and was
recommended to be reconstructed in combination with upsizing the storm sewer within the Watershed
Study. Currently, the existing drainage system is a combination of underground pipes and open
ditches.
ANALYSIS
The proposed series of easements will allow for the construction of a system with increased capacity
and provide area necessary for maintenance and construction access. The visible area above /adjacent
to the planned box culvert installation on the Landmark Plaza property will be a stone riprap lined
channel, which will serve as an overflow channel to allow additional stormwater capacity as overflow,
when needed. The area over and adjacent to the residential developments will be restored to existing
grass or driveway. The Department of Public Works will work with the property owners to have
appropriate easement documents signed and recorded at the Winnebago County Register of Deeds.
FISCAL IMPACT
No land use fiscal impacts are anticipated.
RECOMMENDATION
The Plan Commission approved of this request at its January 4, 2011 meeting.
Approved,
City Manager
ITEM: ACCEPT STORM SEWER EASEMENTS AT VARIOUS LOCATIONS ON
PROPERTY LOCATED BETWEEN KOELLER STREET AND THE TIPLER
SCHOOL AREA STORMWATER DETENTION BASIN
GENERAL INFORMATION
Petitioner City of Oshkosh Department of Public Works
Owner: Landmark Limited Partnership III — 300 S Koeller St
Donald Olson — 251 S Westfield St
Greg Roberts — 255 S Westfield St
Xiong /Tong Yang /Mai Vang Pao — 240/250 S Westfield St
Action Requested:
The Department of Public Works is requesting acceptance of multiple storm sewer easements
running between South Koeller Street right -of -way east to the Tipler School Area Stormwater
Detention Basin (TDB) located over property at 300 South Koeller Street, 251/255 South Westfield
Street and 240/250 South Westfield Street.
Applicable Ordinance Provisions: N/A
Property Location and Type /Analysis:
The Department of Public Works is requesting the acceptance of multiple storm sewer easements,
temporary and permanent, located between the 300 Block of South Koeller Street and the Tipler
School Area Stormwater Detention Basin (TDB) running around the south and east sides of
Landmark Plaza, along the north side of 251/255 South Westfield Street, and along the north side of
240/250 South Westfield Street. This area is located within the Campbell Creek watershed and was
recommended to be reconstructed in combination with upsizing the storm sewer within the
Watershed Study. Currently, the existing drainage system is a combination of underground pipes
and open ditches.
The proposed series of easements will allow for the construction of a system with increased
capacity and provide area necessary for maintenance and construction access. The visible area
above /adjacent to the planned box culvert installation on the Landmark Plaza property will be a
stone riprap lined channel, which will serve as an overflow channel to allow additional stormwater
capacity as overflow, when needed. The area over and adjacent to the residential developments will
be restored to existing grass or driveway.
The Department of Public Works will work with the property owners to have appropriate easement
documents signed and recorded at the Winnebago County Register of Deeds.
RECOMMENDATION /CONDITIONS
Staff recommends approval of the acceptance of the proposed storm sewer easements as requested.
The Plan Commission approved of the acceptance of the storm sewer easements as requested. The
following is the Plan Commission's discussion on this item.
Mr. Buck presented the item and reviewed the site and surrounding area as well as the site plan for
the proposed easements.
Mr. Thorns asked where the area of the stone riprap lined channel would be located.
Steve Gohde, Assistant Director of Public Works, responded that the channel would be located just
east of Koeller Street and would continue on the south side of the drive entrance of Landmark Plaza
and would then wrap around to the north. He further stated that he does not anticipate water to be
present in the channel very frequently.
Mr. Thorns also questioned if there was a drainage ditch there currently, why rip rap and stone was
being used rather than natural covering, and who would be responsible to maintain this area.
Mr. Gohde replied that there is currently a drainage ditch in this location however it is very old and
that natural materials were not being used as they would not be suitable covering over the box
culvert. He further stated that storm damage would be the responsibility of the City to maintain
however mowing would be the responsibility of the property owners.
Motion by Borsuk to approve the consent agenda as requested.
Seconded by Vajgrt. Motion carried 8 -0.
( 0
OLH
ON THE WATER
MEMORANDUM
TO: Members of the Plan Commission
FROM: Steven M. Gohde, Assistant Director of Public Works 5 1 ''15
DATE: December 27, 2010
RE: Accept Easements
The Department of Public Works is seeking the acceptance of easements located between Koeller Street and
the Tipler School Area Stormwater Detention Basin (TDB) around Landmark Plaza and near the TDB. This
area is in the Campbell Creek watershed. The watershed study performed by Strand Associates of Madison
recommended the construction of the TDB in combination with upsizing the storm sewer between Koeller
Street and the TDB. Currently, the existing drainage system is a combination of pipes and open ditches in
narrow easements. The existing stormwater drainage way makes four 90 degree turns. The 90 degree turns
reduce the capacity of the stormwater drainage system.
The proposed stormwater drainage system is concrete box culvert, varying in size from 3' by 6' to 4' by 6'. The
proposed easements allow for the construction of 45 degree angles to help increase the capacity of the system.
Additional area is also included to allow maintenance and construction vehicles access to the drainage system.
The area above /adjacent to the concrete box culvert through the Landmark Plaza area will be a riprap lined
channel. This will serve as an overflow channel to allow for additional stormwater capacity /storage in the event
it is needed. The area adjacent to the residential developments will be restored to grass or driveway
depending on current use.
The acceptance of these easements will allow the new storm sewer pipe to be constructed without any 90
degree bends and provide adequate space for maintenance /construction vehicles to construct and access the
system in the future.
2A
HAsteveng\PC memo3 \easements.doc
' 704
Egg
mm
r 00 K,
�
i
�
�
-------------------------------------------------------------- ---------------------------------------------- ------- --------- ------------------------------------ ------- --- ------------
�
IF
Egg
mm
r 00 K,
�
i
�
�
-------------------------------------------------------------- ---------------------------------------------- ------- --------- ------------------------------------ ------- --- ------------
�
R3
PeINTE
16.15 P � 1195
P
1515W Z
,BtS IX
El
0
O
Z 1150
WITZEL AVE.
30 16]0 1613 56] 1550
tn5 ,]6, ti�5 ti3, t 1] I 1705
,pp,
1825 T IBt9 i � � p � ER
El
,61] ,6t 1605
16TH
j
0
rr�
SRL,
LL 11
C_ C -2PD
R
B
$
�p1et
OB1enUon
gasn
)-2 >�
a
Accept Various
E sements
_
�
s.
.,.as
t 3
U) a3,
°
z o 0
M o J C -2 R _� �Q� LP
O w
w
� Ir 0
_
BI
S i
$ �
cn
U Li
a
'Q:
1752 =_.�
E� A
W.
cn C6
m% nsi
R
5T
I_l
El
tn5. 1753
4 1]55 ❑ � � u)
,M1 ms
� n
°
n. nsa
R
W.
t
6
Mtt
DISCLAIMER Accept Easements
This map is neit er a legally recorded map nor
a survey nd it is not intended to be used as one. Various L oc at ions
Y
City of Oshkosh Wisconsin
Community Development
This drawing is a compilation of records, data Temporary &Permanent
and information located in various city, county
and state offices and other sources affecting S. Koeller/Westfield Area
N
the area shown and it is to be used for reference
purposes only. The City of Oshkosh is not re- Tipler Deten Basin
12/27/2010
sponsible for any inaccuracies herein contained.
If discrepencies are found, please contact the
1 � = 300 1
4
City of Oshkosh.
Created by - D
0
f
n
or,
itw:rr
DISCLAIMER
This map is neither a legally recorded map nor
a survey and it is not intended to be used as one.
This drawing is a compilation of records, data
and information located in various city, county
and state offices and other sources affecting
the area shown and it is to be used for reference
purposes only. The City of Oshkosh is not re-
sponsible for any inaccuracies herein contained.
If discrepencies are found, please contact the
City of Oshkosh.
Accept Easements
Various Locations City of Oshkosh Wisconsin
Community Development
Temporary & Permanent N
S. Koeller/Westfield Area
Tipler Detension Basin 12/27/2010
1 " = 200' S
Created by - D