HomeMy WebLinkAbout10-385DECEMBER 14, 2010 10 -385 RESOLUTION
(CARRIED 7 -0 LOST LAID OVER WITHDRAWN )
PURPOSE: APPROVAL OF CHANGE ORDER NO. 2 FOR PUBLIC WORKS
CONTRACT 10 -06 WITH FISCHER -ULMAN CONSTRUCTION
FOR CONCRETE SIDEWALK- PAVEMENT REPAIRS (- 28,136.81)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the following
Change Order, a copy of which is attached, is hereby approved:
FISCHER -ULMAN CONSTRUCTION
1115 S. Theodore St.
Appleton, WI 54915
Net Decrease to contract: (- $28,136.81)
PURPOSE: See attached Change Order.
CHANGE ORDER # 2
DATED: December 1, 2010
TO: FISCHER -ULMAN CONSTRUCTION
1115 S. THEODORE STREET
APPLETON, WI 54915
Your present contract with the City of Oshkosh, Contract No.
and changed as follows:
NET DECREASE TO CONTRACT:
WA
Recommended:
Director of Public Works
10 -06 , is hereby amended
($28,136.81)
CITY OF OSHKOSH
City Manager
City Clerk
Approved and accepted: --
Co ractor
I certify that provision has been made to pay the liability that will accrue to the City of
Oshkosh, Wisconsin, under the within Change Order.
Comptroller
Approved as to form:
City Attorney
CONTRACT: 10 -06 CHANGE ORDER # 2
CONCRETE SIDEWALK (New and Reconstruction)
1
Sidewalk removal &
INCREASE IN
DECREASE IN
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
CONTRACT
CONTRACT
NUMBER
complete asspecified
Feet
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
1
Sidewalk removal &
driveway removal,
Square
complete asspecified
Feet
94,250.00
90,001.74
- 4,248.26
0.33
($1,401.93)
2
Concrete /asphalt sawing,
Linear
complete asspecified
Feet
4,750.00
5,528.21
778.21
2.00
1,556.42
3
Construct 4" thick concrete
sidewalk in various
locations in the City of
Oshkosh, complete as
Square
, specified
Feet
91,000.00
90,591.05
- 408.95
2.84
($1,161.42)
4
Construct 6" thick concrete
sidewalk in various
locations in the City of
Oshkosh, complete as
Square
specified
Feet
16,750.00
13,166.02
- 3,583.98
3.14
($11,253.70)
5
Construct 7" thick
crosswalk areas, complete
Square
asspecified
Feet
4,000.00
1,577.87
- 2,422.13
3.28
($7,944.59)
6
Provide and install metal
detectable warning plates,
complete as specified
Square
Feet
200.00
144.00
-56.00
28.00
($1,568.00)
7
Three (3 ") inch asphalt
replacement, complete as
Square
specified
Feet
2,250.00
1,324.05
- 925.95
3.70
($3,426.02)
8
Curb and gutter removal,
Linear
complete asspecified
Feet
425.00
21810
- 206.30
3.50
($722.05)
9
Construct 30" curb and
gutter, complete as
Linear
specified
Feet
425.00
233.70
- 191.30
16.80
($3,213.84)
10
Terrace restoration,
including seed, fertilizer,
and mulch, complete as
Square
specified
Yards
2,000.00
1,095.63
- 904.37
3.90
($3,527.04)
11
Furnish and install
pavement ties, complete as
specified
Each
150.00
65.00
-85.00
6.00
($510.00)
12
Construct 4" thick concrete
sidewalk in Water Dept.
repair locations as approx.
60 sites, complete as
Square
specified
Feet
2,500.00
735.41
- 1,764.59
4.13
($7,287.76)
13
Construct 6" thick concrete
sidewalk in Water Dept.
repair locations at approx.
20 sites, complete as
Square
specified
Feet
1,000.00
116.50
- 883.50
4.30
($3,799.05)
14
7" non - reinforced concrete
pavement removal and
replacement, including
sawing, pavement ties,
integral curb & grading,
terracing & traffic control,
Square
complete as specified
Yards
100.00
32.50
-67.50
39.00
($2,632.50)
Page 1 of 4
CONTRACT: 10 -06 CHANGE ORDER # 2
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
CONTRACT
DECREASE IN
CONTRACT
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
15
8" non - reinforced concrete
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
pavement removal and
replacement, including
sawing, pavement ties,
Square
integral curb & grading,
Yards
0.00
882.19
882.19
45.25
39,919.10
terrace & traffic control,
Square
complete as specified
Yards
1,750.00
439.16
- 1,310.84
39.20
($51,384.93)
16
8" special High Early
Strength, non - reinforced
concrete pavement
removal and replacement,
including sawing,
pavement ties, integral
curb and grading, terracing
and traffic control,
Square
complete as specified
Yards
150.00
0.00
- 150.00
46.50
($6,975.00)
17
Extra crushed stone base,
complete as specified
Tons
150.00
182.30
32.30
12.00
387.60
18
No. 4 epoxy- coated
reinforced rods, installed
Linear
as specified
Feet
300.00
92.00
- 208.00
1.50
($312.00)
19
Furnish, install, and
maintain Type "C" inlet
protection, complete as
specified
Each
5.00
0.00
-5.00
40.00
($200.00)
20
Furnish, install, and
maintain Type "D" inlet
protection, complete as
specified
Each
40.00
66.00
26.00
40.00
1,040.00
21
Construct 12" wide radius
curb head, complete as
Linear
specified
Feet
150.00
71.00
-79.00
3.50
($276.50)
22
Furnish, install, and
maintain erosion mat,
Square
complete asspecified
Yards
1 100.00
214.71
114.71
1.75
200.74
23
Profile sawcut concrete
Linear
curb, complete as specified
Feet
1 50.00
0.00
-50.00
40.00
($2,000.00)
SUB -TOTAL CONCRETE SIDEWALK (NEW & RECONSTRUCTION) 3,184.76 ($109,596.33)
CONCRETE SIDEWALK (New and Reconstruction)
Ann1T1(1MAI ITEM14
24
8 "/7 -bag non - reinforced
INCREASE IN
DECREASE IN
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
CONTRACT
CONTRACT
NUMBER
replacement, including
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
24
8 "/7 -bag non - reinforced
concrete removal &
replacement, including
sawing, pavement ties,
integral curb & grading,
terracing & traffic control,
Square
, complete asspecified
Yards
0.00
882.19
882.19
45.25
39,919.10
Page 2 of 4
CONTRACT: 10 -06 CHANGE ORDER # 2
ITEM
Sidewalk & driveway
CONTRACT
INSTALLED
NET
NET
COST PER
INCREASE IN
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
CONTRACT
CONTRACT
NUMBER
specified
Feet
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
25
8 "/8 -bag non - reinforced
concrete removal &
replacement, including
Square
sawing, pavement ties,
Yards
integral curb & grading,
terracing & traffic control,
Square
625.00
683.40
58.40
42.75
2,496.60
102
complete asspecified
Yards
0.00
528.73
528.73
46.04
24,342.73
26
Construct 8" thick concrete
Feet
48.00
74.90
26.90
4.00
107.60
103
sidewalk, complete as
Square
specified
Feet
0.00
1,937.60
1,937.60
4.19
8,118.54
27
Construct 8" thick concrete
15.00
14.10
-0.90
22.50
($20.25)
104
sidewalk, 9 -bag mix,
Square
complete as specified
Square
300.00
457.20
157.20
2.90
455.88
105
6" Concrete sidewalk &
Feet
0.00
220.00
220.00
6.85
1,507.00
28
Construct 4" thick concrete
Square
sidewalk, 8 -bag mix,
Feet
286.00
98.20
- 187.80
3.35
($629.13)
106
complete as specified
Linear
transition, with base,
Feet
0.00
157.52
157.52
5.72
901.01
ADDITIONAL ITEMS - CONCRETE SIDEWALK 74,788.38 $0.00
CHANGES TO CHANGE ORDER #1
ADDITIONAL WORK PER QUOTE FOR W. MURDOCK AVENUE PAVEMENT:
CONCRETE PAVING
100
Sidewalk & driveway
INCREASE IN
DECREASE 1N
ITEM
DESCRIPTION
UNIT
C/O #1
INSTALLED
NET
NET
COST PER
CONTRACT
CONTRACT
NUMBER
specified
Feet
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
100
Sidewalk & driveway
removal, complete as
Square
specified
Feet
585.00
554.20
-30.80
0.50
($15.40)
101
8" Concrete pavement
including integral curb,
pavement removal, sawcut,
Square
pavement ties, and
Yards
landscaping, complete as
specified
625.00
683.40
58.40
42.75
2,496.60
102
12" Radius curb head,
Linear
complete as specified
Feet
48.00
74.90
26.90
4.00
107.60
103
Standard 30" curb & gutter,
Linear
T' (tie -in), complete as
Feet
specified
15.00
14.10
-0.90
22.50
($20.25)
104
4" Concrete sidewalk,
Square
complete as specified
Feet
300.00
457.20
157.20
2.90
455.88
105
6" Concrete sidewalk &
driveway, complete as
Square
specified
Feet
286.00
98.20
- 187.80
3.35
($629.13)
106
3 1/2" Asphaltic concrete
transition, with base,
Square
complete as specified
Yards
105.00
107.20
2.20
41.40
91.08
107
Adjust manholes and inlets,
complete as specified
Each
4.001
8.001
4.001
1 250.001
1,000.00
Page 3 of 4
CONTRACT: 10 -06 CHANGE ORDER # 2
CHANGES TO CHANGE ORDER #1 - CONCRETE PAVING - SUB - TOTALS 4,151.16 ($664.78)
NET DECREASE TO CONTRACT 10 -06:
82,124.30 ($110,261.11)
(28,136.81)
Page 4 of 4
INCREASE IN
DECREASE IN
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
COST PER
CONTRACT
CONTRACT
NUMBER
QUANTITIES
QUANTITIES
INCREASE
DECREASE
UNIT
PRICE
PRICE
108
Provide and install metal
Square
detectable warning plates,
Feet
complete as specified
16.001
16.00
1
T 28.00
CHANGES TO CHANGE ORDER #1 - CONCRETE PAVING - SUB - TOTALS 4,151.16 ($664.78)
NET DECREASE TO CONTRACT 10 -06:
82,124.30 ($110,261.11)
(28,136.81)
Page 4 of 4
( 0
OHKOH
ON THE WATER
MEMORANDUM
TO:
FROM
DATE:
RE:
BACKGROUND
Honorable Mayor and Members of the Common Council
Steven M. Gohde, Assistant Director of Public Works
December 9, 2010
Change Order #2 for Public Works Contract No. 10 -06 for Fisher -Ulman Construction Inc. for
Concrete Sidewalk- Pavement Repairs (- $28,136.81)
Change Order #2 for Contract 10 -06 is scheduled for consideration by the Common Council at the December
14, 2010 meeting. The contract was originally awarded to Fisher -Ulman Construction Inc, of Appleton, WI in
April of 2010. This change order is for final quantities.
ANALYSIS
All work on the project has been completed and final quantities measured.
FISCAL IMPACT
Funding for the project is in the 2010 Capital Improvement Program Sidewalk Section and in the Water
Utility Operating Budget. Additional work was added by Change Order #1 and included funding from the
Concrete Pavement Section (Arterial and Collector Street Concrete Pavement Repairs) of the CIP.
Budget Section
Funding
New Contract Total
CIP - Sidewalk
$524,000.00
$378,954.22
Water Utility Operating
$105,400.00
$86,282.59
Concrete Pavement C.O. #1
$38,650.23
$38,650.23
Totals
$658,050.23
$503,887.04
RECOMMENDATIONS
I recommend approval of the Change Order #2 to Contact No. 10 -06 in the amount of - $28,136.81 to Fisher -
Ulman Construction Inc.
Respectfully Submitted,
l 71 �
Steven M. Gohde
Asst. Director of Public Works
Approved:
. CL
City Manager
IAEngineering \10 -06 Concrete Sidewalk\Project_ Information \Correspondence \Memo \CO #2 exp 10- 06.doc