HomeMy WebLinkAbout0144272-Building CITY OF OSHKOSH No 144272
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 2737 HARRISON ST Owner OSHKOSH CORPORATION Create Date 11/19/2010
Designer Karrels Contractor R J ALBRIGHT INC.
Category 210 - Addition Industrial Plan 07- 3194 -1110
Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze
Zoning Class of Const: 2B Size 5625
Unfinished /Basement Sq. Ft. Rooms Height Ft. ❑ Projection
Finished /Living Sq. Ft. Bedrooms Stories 1 Canopies
Garage Sq. Ft. Baths Signs
Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Required Occupancy Fee $0.00 Flood Plain No Height Permit Not Required
Park Dedication Not Required # Dwelling Units 0 # Structures 0
Use /Nature Ind/ 50' x 112' Lean Too Addtion per State Approved Plans
of Work
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $124,000.00 Plan Approval $0.00 Permit Fee Paid $460.00 Park Dedication $0.00
Issued By: Date 12/03/2010 Final /O.P. 00 /00 /0000
❑ Permit Voided Parcel Id # 1519600000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkos has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit pplication wit in an e se ent, the City strongly urges the permit applicant to contact the easement
holder(s) and to secur any n cess appr al efore starting such activity.
have read and and tand of e m on d information.
Signature Date (Z. 3 �6
Agent/Owner
Address 5711 GREEN VALLEY RD OSHKOSH WI 54904 - 9700 Telephone Number 231 -8635
To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.