Loading...
HomeMy WebLinkAbout0121032-Plumbing (bathroom) e CITY OF OSHKOSH No 121032 OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 1943 MICHIGAN ST Owner ROBERT S /STACEY E REESE Create Date 08/11/2006 Contractor OWNER Category 410 - Residential- Interior Plan Bathtub Shower Water Softner Wait. St. Shamp Sink Coffee Maker Whirlpool Floor Drain Local Waste Ice Chest Flr/Wst Sink Int Grease Trap Lavatory 1 Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Toilet 1 Disposal Bidet Sculry Sink Wash Ftn RPZ Valve Res. Sink Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Roof Drain Ejector /Grind Drink Ftn Sery Sink Soda Disp Misc. Fixtures Use /Nature SFR/ Fixtures for 1st floor half bath. of Work Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcel Id # 1409610100 Valuation $1,200.00 Plan Approval $0.00 Permit Fees $25.00 ❑ Permit Voided Issued By Li(), Date 08/11/2006 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to sere any necessary approvals before starting such activity. Signature ,d /j .1,,,,,, f - .S D at ( LA Agent/Owner Address 1 3 MICHIGAN ST OSHKOSH WI 54902 - 6836 Telephone Number To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.