Loading...
HomeMy WebLinkAbout0120943-Plumbing (water heater) CITY OF OSHKOSH No 120943 OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 2317 MINERVA ST Owner LINDA R PETERS /ETHEL R ROST LIFE ESTATI Create Date 08/02/2006 Contractor MERTEN PLUMBING Category 411 - Residential -Water Heaters Plan Bathtub Shower Water Softner Wait. St. Shamp Sink Coffee Maker Whirlpool Floor Drain Local Waste Ice Chest Fir/Wst Sink Int Grease Trap Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Toilet Disposal Bidet Sculry Sink Wash Ftn RPZ Valve Res. Sink Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Water Heater 1 Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Roof Drain Ejector /Grind Drink Ftn Sery Sink Soda Disp Misc. Fixtures Use /Nature SFR / INSTALL GAS WATER HEATER *check #9551 of Work Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcel Id # 1214600000 Valuation $170.0 Plan Approval $0.00 Permit Fees $25.00 ❑ Permit Voided Issued By 5n1) Lk, Date 08/07/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent /Owner Address 1076 COZY LN OSHKOSH WI 54901 - 0000 Telephone Number 231 -6795 To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.