HomeMy WebLinkAbout0067415-Plumbing (water heater) (2) (D CITY OF OSHKOSH No 67415
OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 2001 2045 EVANS ST Owner JAMES H ZUCKER Create Date 10/28/1998
Contractor WATTERS PLUMBING Category 440 - Industrial- Interior Plan
Bathtub 0 Clothes Wshr 0 Classrm Sink 0 Surgeons Sink 0 Roof Drain 0 Deduct Meters 0
Shower 0 Lndry Tray 0 Exam Sink 0 Sterilizer 0 Soda Disp 0 Wtr Sewer Mtrs 0
Whirlpool 0 Sump Pump 0 F Prep Sink 0 RPZ Valve 0 Coffee Maker 0 Wtr Usage Mtrs 0
Lavatory 0 San Sump /Pump 0 Flr/Wst Sink 0 Bidet 0 Site Drain 0 Misc. 0
Toilet 0 Water Softner 0 Hand Sink 0 Urinal 0 Wait. St. 0 Fixtures
Kit Sink 0 Standp Rec 0 Lab Sink 0 Beer Tap 0 Ice Chest 0
Disposal 0 Gar Drain 0 Plaster Sink 0 Dip Well 0 Comm Ice Maker 0
Dishwasher 0 Local Waste 0 Sculry Sink 0 Drink Ftn 0 Int Grease Trap 0
Floor Drain 0 Bar Sink 0 Sery Sink 0 Wash Ftn 0 Ext Grease Trap 0
Hose Bibb Breakrm Sink 0 Shamp Sink 0 Catch Basin 0 Eye Wash Statn 0
Water Heater 1
Use /Nature REPLACE WTR HTR AT 2059 EVANS ST (HOWARD DEVL)
of Work
Size Material Type # Conn. Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
0 Parcel Id #
0 1519420000
Valuation $1,500.00 Plan Approval $0.00 Permit Fees
$10.00 ❑ Permit Voided
Issued By
Date 11/23/1998
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 1303 MIDWAY RD MENASHA WI 54952 - 0000 Telephone Number 800 -801- 8125,733 -81
To schedule inspections please call the Inspection Request Tine at 236 -5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.