Loading...
HomeMy WebLinkAboutHVAC Compliance Statement - 09/16/2010 SEP -16 -10 10:46 AM CONDON TOTAL CO T 9207485034 P.01 • ' • "ktkCn . • UILDINGS, HVAC, COMPLIANCE - 72 STATEMENT SB� 9 0 Th s form Is required to be submitted by the supervising professional (architect, engineer, HVAC designer or electrical designer) observing construction of projects within buildings with total areas 50,000 cubic feet o greater and bleachers (Comm 61.40). Failure to submit this form may result in penalties as specified In Comm 61.23 and/or local ordinances. This form ,bust be submitted prior to the plan approval expiration date or another submittal may be required. General Instructions: Prior to the initial occupancy of new buildings or additions and the final occupancy of altered existing buildings, submit this completed and signed form to: • The municipal building Inspection office refer to the pion approval letter for fgency address) • Safety arid Buildings, 10541N Ranch Roa5 Hayward, WI. 54843 Note: If the review was done by the municipality, the compliance statement goes only to the municipal building Inspector. A copy Is not needed by Safety & Buildings. • ' Personal Information you provide may be used for secondary purposes [Privacy Law, s. 15.04 (1)(m)]. 1. PROJECT INFORMATION; Please fill in the following with Information from your plan approval letter. Transaction ID Number Lsi -:309 -084 Project Name ,�h` nt�. tl Site Number �+, - Site locatioh (number & street) t Cr) U- MAls.) �"- a ' •6 • : 1t,City ❑ Village ❑ Town of te.k4r) County of Q 1 tru.)tkr %Up • 2. PURPOSE OF THIS STATEMENT; (Check Box A, B, C, or D to Indicate purpose and crmplete any other applicable boxes and information. Attach additional pages If necessary.) Check those which apply: ❑ Building Object ID # ❑ HVAC Object ID #' . 0 Lighting Object ID # • ❑ Partial Completion ' • Description of Portion Completed . A) Statement of Substantial Compliance � • : to the beat of my knowledge, belief, and based on onslte observation, construction of the foll win building nd/or HVAC Remo applicable to this protect have been completed in substantial compliance with the apprcived plans and specifications. CU BUILDINO/LIGHTING ITEMS • f, Structural system Including submittal and erection of all building components 10. Exterior Ilghtl $ g & control requirements • (trusses, precast, metal building, etc.) 11. Interior Ilghtln� & control requirements 2. Fke protection systems (sprinklers, alarms, smoke detectors) designed, Installed, 12, All conditions of lighting plan approval i and tested (Including forward flow on back flow devices) by appropriately and applicable varI ncea registered professionals 3. Shaft and stairway enclosure • 4. 'Exits Including exit and directional lights • • 5. Fire - resistive construction, enclosure of hazards, lire walls, labeled doors, class likl.IVAC ITEMS ; of construction, fire stopped penetrations 6. Sanitation system (toilets, sinks, drinking facilities) 1. HVAC system I luding final teat • 7. ,Banter -free Including Comm 18 elevators and tlfta 2. All conditions HVAC plan approval and O. • Energy envelope requirements applicable varl noes A 3. All conditions of building plan approval and applicable variances 11 4 The following Items are not In compliance and must be addressed: "'1 • 8) ❑ Statement of Noncompliance • Due f0 the following listed violations, this protect le not ready for occupancy: C) G ; Supervising Professional Withdrawn From Project (Uee A or B above to Indicate project status as of this date.) • D) O , Project Abandoned 3. SUPERVISING PROFESSIONAL IGNATURE FOR: \ 0 Building 1 HVAC 0 Lighting MO,— W aRITIte Dat i Name (please print or type) (� N-414610 ( Phgns numb•r`l at Customer ID $ & 1 7O Signature 1 �►� `� ,..—� . SBD•9720 (R.07/2008) • SBD.9720 (R.0212004) Received Time Sep. 16. 2010 11:34AM No. 2853