Loading...
HomeMy WebLinkAbout0121491-Building #114 CITY OF OSHKOSH No 121491 OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 2734 SHOREWOOD DR Owner SHARON L VELIE Create Date 09/11/2006 Designer Contractor OWNER Category 140 - Interior Remodeling Plan Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished /Basement Sq. Ft. Rooms Height Ft. ❑ Projection Finished /Living Sq. Ft. Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use /Nature SFR/ Remodeling Interior* to include adding a new full bathroom and replacing kitchen cabinets and countertops. The decking for the of Work floor will also be replaced due to deterioration. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $15,000.00 Plan Approval $0.00 Permit Fee Paid $118.00 Park Dedication $0.00 Issued By: Date 09/11/2006 Final /O.P. 00 /00 /0000 ❑ Permit Voided Parcel Id # 1518612700 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature ,C f V p �. Date 9AVO Agent/Owner Address 2734 SHOREWOOD DR OSHKOSH WI 54901 - 1654 Telephone Number To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. • _ � r y E st All CID p b ( a l%�