HomeMy WebLinkAbout2010-Plumbing (toilet) g ) CITY OF OSHKOSH No 143521
OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 1219 WITZEL AVE Owner RICHARD E BRICKHAM Create Date 10/08/2010
Contractor SOPER PLUMBING Category 413 - Res - Interior (Replacement Fixtures) Plan
Bathtub Clothes Wshr Classrm Sink Surgeons Sink Roof Drain Deduct Meters
Shower Lndry Tray Exam Sink Sterilizer Soda Disp Wtr Sewer Mtrs
Whirlpool Sump Pump F Prep Sink RPZ Valve Coffee Maker Wtr Usage Mtrs
Lavatory San Sump/Pump Flr/Wst Sink Bidet Site Drain Misc.
Toilet 1 Water Softner Hand Sink Urinal Wait. St. Fixtures
Kit Sink Standp Rec Lab Sink Beer Tap Ice Chest
Disposal Gar Drain Plaster Sink Dip Well Comm Ice Maker
Dishwasher Local Waste Sculry Sink Drink Ftn Int Grease Trap
Floor Drain Bar Sink Sery Sink Wash Ftn Ext Grease Trap
Hose Bibb Breakrm Sink Shamp Sink Catch Basin Eye Wash Statn
Water Heater
Use /Nature SFR / Replace toilet for Lowe's. **debit acct
of Work
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcel Id #
0607850000
Valuation $325.00 Plan Approval $0.00 Permit Fees
$25.00 Permit Voided
Issued By Date 10/08/2010
In the p= rformance of this work, I agree to perform all work pursuant to rules governing the described construction.
While t e City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
describ =d in this permit application within an easement, the City strongly urges the permit applicant to contact the
easeme t holder(s) and to secure any necessary approvals before starting such activity.
Signatu Date
Agent/Owner
Addres 2225 BURNWOOD DR OSHKOSH WI 54902 - 9003 Telephone Number 426 -2151
To sc edule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of
Inspe •tion (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Numb r. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
contin e if the inspection is not performed within two business days from the time the project is ready.