Loading...
HomeMy WebLinkAbout10-323OCTOBER 12, 2010 10 -323 RESOLUTION (CARRIED 6 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 10 -15 TO J. F. AHERN CO. FOR WASTEWATER TREATMENT PLANT AND VARIOUS PUMP STATION IMPROVEMENT PROJECTS ($999,000.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has heretofore advertised for bids for Wastewater Treatment Plant and various Pump Station improvement projects; and WHEREAS, upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: J. F. AHERN CO. 855 Morris St. Fond du Lac, WI 54935 Total Bid: $999,000.00 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 551 - 1910 - 1799 -00000 -- Sewer Utility Construction Work in Progress Bids Received: 10:00 AM STRAND ASSOCIATES, INC. 10/5/2010 910 West Wingra Drive Madison, Wisconsin 53715 CONSOLIDATED TREATMENT PLANT AND PUMPING STATION IMPROVEMENTS CONTRACT 10 -15 CITY OF OSHKOSH, WISCONSIN BID TABULATION SUMMARY Bidder Bid Bond Supervisory and or Addenda Lump Sum System Address Guarantee Acknowledged Bid Supplier J. F. Ahern Co. 5% N/A $999,000.00 Wunderlich- 855 Morris Street Malec Fond du Lac, WI 54935 Oudenhoven Construction, Inc. 5% N/A $1,028,400.00 Wunderlich- 2300 Tower Drive Malec Kaukauna, WI 54130 Miron Construction Co., Inc. 5% N/A $1,099,250.00 Wunderlich- 1471 McMahon Drive Malec Neenah, WI 54956 Reviewed by: JSR;cal\R;\MAD1 Documents \SpeGflcatlons\Archlve\2010 \Oshkosh, W1\10- 15.1382.043AIA(14) Bid Tabs \0shkosh.10- 15.bt1.docx ( 0 OHKOH ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Stephan M. Brand, Utilities Superintendent DATE: October 6, 2010 RE: Wastewater Treatment Plant and Pumping "Station Improvement Projects Contract 10 -15 BACKGROUND This project includes equipment replacement and property improvements at the Wastewater Treatment Plant and various pumping stations as identified in the 2010 Capital Improvement Plan. Pumping station improvements include a back up generator replacement at the North Pumping Station, valve vault upgrades at Hickory Lane, and screening compactors at the Broad Street and South Main Street pumping stations. Wastewater Treatment Plant work includes replacement of aeration tank weir gates, concrete - expansion joint repairs in process tanks, and upgrades to the effluent water reuse filter system. Strand Associates Inc. (Strand) is the engineering consultant on this project and was awarded the design, bidding, and construction inspection services for this work in March of this year. The construction estimate for this project is $1,245,000.00. ANALYSIS Bids were open on October 5, 2010 with three contractors bidding on the project. The low bid is J. F. Ahern Company of Fond du Lac WI in the amount of $999,000.00. Strand has reviewed the bid and contractor documentation. Based on this information and their previous experience in working with this contractor, Strand recommends award to J. F. Ahern. FISCAL IMPACT This project is included in the 2010 Capital Improvement Program under the Property Improvements and Equipment Replacement Sections with funding through the Wastewater Utility. The total bid price of $999,000.00 is $246,000.00 under the construction estimate for this project. RECOMMENDATIONS recommend award to J.F. Ahern Company of Fond du Lac in the amount of $999,000 for this project. Respectfully Submitted, � A ct "t � o tk-/ Stephan M. Brand Utilities Superintendent Approved: .'�• City Manager