Loading...
HomeMy WebLinkAbout10-322OCTOBER 12, 2010 10 -322 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVAL OF CHANGE ORDER NO. 2 FOR PUBLIC WORKS CONTRACT NO. 10 -05 WITH CARL BOWERS & SONS CONSTRUCTION CO. FOR VARIOUS PAVING & UTILITY PROJECTS — SOUTH SIDE PAVING ( +$23,799.79) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: CARL BOWERS & SONS CONSTRUCTION COMPANY N1844 Maloney Road Kaukauna, WI 54130 Net increase to contract: +$23,799.79 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 317 - 0410 - 7480 -03302 -- Special Assessments Fund - Sewer Acct. No. 317 - 0410 - 7480 -03303 -- Special Assessments Fund - Water Acct. No. 317 - 0410 - 7480 -03305 -- Special Assessments Fund - Storm Water Acct. No. 541 - 1810 - 1799 -00000 -- Water Utility Construction Work in Progress Acct. No. 551 - 1910 - 1799 -00000 -- Sewer Utility Construction Work in Progress Acct. No. 561 - 2010 - 1799 -00000 -- Storm Water Utility Construction Work in Progress CHANGE ORDER # 2 DATED: September 23, 2010 TO: Carl Bowers & Sons Construction Company N1844 Maloney Road Kaukauna, WI 54130 Your present contract with the City of Oshkosh, Contract No and changed as follows: NET INCREASE TO: SECTION I -CONCRETE PAVING NET INCREASE TO: SECTION II - STORM SEWER NET INCREASE TO: SECTION III -SANITARY SEWER NET INCREASE TO: SECTION IV -WATER MAIN NET INCREASE TO CONTRACT: Recommended: Director of Public Works M 10 -05 , is hereby amended $0.00 $8,181.72 $10,838.07 $4,780.00 $23,799.79 CITY OF OSHKOSH City Manager City Clerk Approved and accepted: Ij tontractor certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT: 10 - 05 CHANGE ORDER # 2 SECTION II - STORM SEWER ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION II 235 Additional labor, materials, INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER and replace 24" storm QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 235 Additional labor, materials, INCREASE IN DECREASE IN ITEM and equipment to remove UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER and replace 24" storm QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE sewer from junction chamber to existing manhole due to poor condition of existing pipe in the W. 6th Ave. and Hrs 1.00 2.00 1.00 $1,030.00 $1,030.00 Dakota St. intersection. Also installed new Type 3 inlet and installed 8" PVC from existing manhole to inlet and from inlet to existing yard drain, per Lump Invoice SCI 0043 Sum 0.00 1.00 1.00 $6,111.00 1 $6,111.00 236 Furnish & install steel plates on two storm manholes due to shallow depth, per Invoice SCI 0044 Each 0.00 2.00 2.00 $1,035.36 $2,070.72 ADDITIONAL WORK: C.O. # 2 (ITEMS 235 -236) - SUB -TOTAL $8,181.72 $0.00 NET INCREASE TO: SECTION II $8,181.72 SECTION III - SANITARY SEWER 320 Additional labor, materials, INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER drop manhole whose QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 320 Additional labor, materials, and equipment to install a drop manhole whose alignment did not match existing sanitary sewer main both vertically and horizontally, per Invoice SCI 0037 Hrs 1.00 2.00 1.00 $1,030.00 $1,030.00 SECTION III - (BID ITEM 320) - SUB -TOTAL $1,030.00 $0.00 Page 1 of 3 CONTRACT: 10 - 05 CHANGE ORDER # 2 ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION III 321 Additional labor, materials, INCREASE IN DECREASE IN ITEM and equipment to excavate CONTRACT INSTALLED NET NET COST PER NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT excessive ground water at PRICE PRICE 321 Additional labor, materials, and equipment to excavate and investigate for excessive ground water at #641 W. 8th Ave. Work included excavation, plugging abandoned sanitary sewer in terrace, installing bentanite dam with slurry backfill due to lateral location in existing driveway, per Invoice SCI Lump 0044 Sum 0.00 1.00 1.00 $3,279.42 $3,279.42 322 Additional labor, materials, and equipment to repair sanitary sewer lateral located at 611 W. 8th Ave., that bored through by WPS Gas Company, per Hietpas Invoice dated 6/15/10 Lump Sum 0.00 1.00 1.00 $405.00 $405.00 323 Additional labor, equipment, and materials to install new wye and cap existing wye due to televising reports being 10 feet off at the following addresses: 742, 682, 676, 672, 662, and 648 W. 8th Ave, per Hietpas Invoices Lump dated 6/15/10 Sum 0.00 1.00 1.00 $5,783.65 $5,783.65 324 Additional labor, materials, and equipment to repair sanitary sewer lateral located at 630 W. 8th Ave., that bored through by WPS Gas Company, per Hietpas Invoices dated 6/15/10 Lump Sum 0.00 1.00 1.00 $340.00 $340.00 ADDITIONAL WORK: C. O. # 2 - (ITEMS 321 -324) - SUB -TOTAL $9,808.07 $0.00 NET INCREASE TO: SECTION III $10,838.07 Page 2 of 3 CONTRACT: 10 - 05 CHANGE ORDER # 2 SECTION IV - WATER MAIN ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION IV 447 Furnish & install 8" plug, I DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER Furnish & install 6" plug, QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 447 Furnish & install 8" plug, complete asspecified Each 0.00 1.00 1.00 $175.00 $175.00 448 Furnish & install 6" plug, complete a specified Each 0.00 1.00 1.00 $210.00 $210.00 449 Furnish & install 6" 11 -1/4 Degree Bend, complete as , specified Each 0.00 1.00 1.00 $215.00 $215.00 450 Furnish & install 1 -1/2" copper water services, Linear complete asspecified Feet 0.00 22.50 22.50 $48.00 $1,080.00 451 Furnish & install 1 -1/2" corporations and stop boxes, complete as specified Each 0.00 2.00 2.00 $350.00 $700.00 452 Furnish & install 6" X 12" offset, complete as specified Each 0.00 1.00 1.00 $375.00 $375.00 453 Furnish & install 10" sleeve, complete as specified Each 0.00 1.00 1.00 $350.00 $350.00 454 Additional labor, materials, and equipment to excavate and investigate the potential leak of the 16" watermain Dakota Street, per Invoice SCI 0045 Lump Sum 0.00 1.00 1.00 $1,675.00 $1,675.00 ADDITIONAL WORK: C.O. # 2 (ITEMS 447 -454) - SUB -TOTAL $4,780.00 $0.00 NET INCREASE TO: SECTION IV $4,780.00 NET INCREASE TO SECTIONS I, 11, III, IV $23,799.79 NET DECREASE TO SECTIONS I, II, III, IV $0.00 NET INCREASE TO CONTRACT: $23,799.79 Page 3 of 3 4 Of HKO H ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works DATE: October 6, 2010 RE: Change Order #2 for Public Works Contract No. 10 -05; for Carl Bowers & Sons Construction Co. for Concrete Paving — South Side Paving /Utilities ( +$23,799.79) BACKGROUND Change Order #2 for Contract 10 -05 is scheduled for consideration by the Common Council at the October 12, 2010 meeting. The contract was originally awarded to Carl Bowers & Sons Construction Co. Inc. in March of 2010. This change order is for additional work required to complete the contract. ANALYSIS Following is a summary of the significant additional work items performed for each section of the CIP. -Storm Sewer — Additional work to replace deteriorated manholes and pipes at 6th Ave and Dakota St. This work was not included with the bid because 6th Ave is scheduled for reconstruction in 2012. - Sanitary Sewer — Additional work to excavate and place bentanite backfill to prevent ground water from saturating 641 W. 8 Ave. foundation and additional work to locate and install sanitary laterals. -Water Main — Additional work to investigate a potential water main leak and additional items /work needed to complete the water main work FISCAL IMPACT Contract Section Change Order Amount CIP Budget Amount New Contract Total Concrete Paving $1,696,000 $1,070,422.25 Storm Sewer $8,181.72 $841,800 $1,415,947.72 Sanitary Sewer $10,838.07 $845,000 $664,248.07 Water Main $4,780.00 $1,255,000 $801,305.00 Total $23,799.79 $4,637,800 $3,951,923.04 Adequate funds are available in the relating sections of the 2010 Capital Improvement Budget. Adequate funding is available is the Storm Sewer section from other projects. RECOMMENDATIONS I recommend approval of the Change Order #2 to Contact No. 10 -05 in the amount of $23,799.79 Bowers & Sons Construction Co. Inc. Respectfully Submitted, Approved: Steven M. Gohde Asst. Director of Public Works City Manager 1:\Engineering \10 -05 Concrete Paving - SOUTH\ Project_ Information \Correspondence\Memo \CO #2 10 -05 exp.doc