Loading...
HomeMy WebLinkAbout0143518-Plumibng (abandon catch basin) (rD CITY OF OSHKOSH No 143518 OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 334 CITY CENTER Owner CITY CENTER ASSOCIATES LLC Create Date 10/08/2010 Contractor COATS, KEITH Category 445 - Commercial - Exterior Other Plan Bathtub Clothes Wshr Classrm Sink Surgeons Sink Roof Drain Deduct Meters Shower Lndry Tray Exam Sink Sterilizer Soda Disp Wtr Sewer Mtrs Whirlpool Sump Pump F Prep Sink RPZ Valve Coffee Maker Wtr Usage Mtrs Lavatory San Sump /Pump Flr/Wst Sink Bidet Site Drain Misc. Toilet Water Softner Hand Sink Urinal Wait. St. Fixtures Kit Sink Standp Rec Lab Sink Beer Tap Ice Chest Disposal Gar Drain Plaster Sink Dip Well Comm Ice Maker Dishwasher Local Waste Sculry Sink Drink Ftn Int Grease Trap Floor Drain Bar Sink Sery Sink Wash Ftn Ext Grease Trap Hose Bibb Breakrm Sink Shamp Sink Catch Basin 1 Eye Wash Statn Water Heater Use /Nature COMM / Abandon catch basin *for new parking lot. of Work Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcel Id # 0100600000 Valuation $600.00 Plan Approval $0.00 Permit Fees $25.00 ❑ Permit Voided Issued By (3167 Date 10/08/2010 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature / C Date - /' -,.4 , Agent/Owner Address 8424 SHIRLEY CT WINNECONNE WI 54986 - 9533 Telephone Number 920 -582 -3975 To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.