Loading...
HomeMy WebLinkAbout0143389-Plumbing VOID VOID VOID eD CITY OF OSHKOSH No 143389 OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD V 0 1 D ON THE WATER Job Address 616 OHIO ST Owner GARRY H DECKER Create Date 09/30/2010 Contractor C SWEETING PLUMBING LLC Category 446 - Commercial -Water Heaters Plan Bathtub Clothes Wshr Classrm Sink Surgeons Sink Roof Drain Deduct Meters Shower Lndry Tray Exam Sink Sterilizer Soda Disp Wtr Sewer Mtrs Whirlpool Sump Pump F Prep Sink RPZ Valve Coffee Maker Wtr Usage Mtrs 1 Lavatory San Sump /Pump Flr/Wst Sink Bidet Site Drain Misc. Toilet Water Softner Hand Sink Urinal Wait. St. Fixtures Kit Sink Standp Rec -_ Lab Sink Beer Tap Ice Chest Disposal Gar Drain Plaster Sink Dip Well Comm Ice Maker Dishwasher Local Waste Sculry Sink Drink Ftn Int Grease Trap Floor Drain Bar Sink Sery Sink Wash Ftn Ext Grease Trap Hose Bibb Breakrm Sink Shamp Sink Catch Basin Eye Wash Statn Water Heater 1 Use /Nature COMM / Add a water meter and replace gas water heater. **debit acct of Work Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcel Id # 0600650000 Valuation $950.00 Plan Approval $0.00 Permit Fees $25.00 Elj Permit Voided] REVISED VALUE Issued By Date 09/30/2010 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1583 COUNTRY MEADOW CT OSHKOSH WI 54904 - 9316 Telephone Number 920 - 410 -4017 To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.