Loading...
HomeMy WebLinkAboutErosion Control - 03/17/2004 CITY OF OSHKOSH EROSION CONTROL OFFICIAL VIOLATION NOTICE PROJECT ADDRESS 2.41 S1.oce_ esertte t r CONTRACTOR Fox CAS fi'rvc CONTRACTOR MAILING ADDRESS/FAX # 2 3 S' 8700 DATE/ • VIOLATIONS CORRECTION - REQUIRED DATE/TIME TIME COMPLIANCE VIOLATION REQUIRED NOTED X COMM 21.125(lxa) INSTALL V ' 04 EROSION CONTROL X MAINTAIN 3/23/041 PERIMETER MEASURES . jL OTHER E4ervl eh() s ( ivew4y s ides open a 5l.or4 dfsiaue. 7:00 AM COMM 21.125(3Xa) TRENCHED IN AT LEAST 4" SILT FENCE NOT INSTALLED BACKFILLED & COMPACTED PROPERLY STAKES WRONG SIDE COMM 21.125(lxc) INSTALL ROCK/GRAVEL TRACKING MAINTAIN PAD 2 " -3" stone, minimum 6" base (NOTE: '/," stone is NOT adequate!) COMM 21.125(1Xd) STREET /CURB & GUTTER CLEAN -UP SEDIMENT CLEAN -UP SIDEWALK (S) ADJOINING PROPERTY ACTION: Please correct the above violations within the time frames noted. Failure to contact this office to verify compliance prior to the deadline will result in citations issued for each violation noted above. THIS NOTICE IS REQUIRED TO BE SIGNED, DATED, AND MAILED OR FAXED TO OUR OFFICE WHEN THE CORRECTIONS HAVE BEEN MADE. Fax # 920 - 236 -5084 Mailing Address: City of Oshkosh P.O. Box 1130 Oshkosh, WI 54903 - 1130 Per COMM 21.125 Erosion control measures are required to be installed within 24 hours of beginning excavation. It is the responsibility of the contractor to regularly inspect and maintain any required erosion control measures. Sediment tracked on to the street shall be cleaned up by the end of that day. I hereby certify that the violations at the above address have been corrected. CONTRACTOR SIGNATURE I DATE FOR OFFICE USE ONLY: I NOTICE MAJLED/FAXED DATE/TIME INSPECTOR 34e44 e:/e