HomeMy WebLinkAbout10-305SEPTEMBER 28, 2010 10 -305 RESOLUTION (CARRIED 6 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVAL OF CHANGE ORDER NO. 1 FOR PUBLIC WORKS CONTRACT NO. 10 -08 WITH INTEGRITY GRADING AND EXCAVATION, INC. FOR KNAPP STREET QUARRIES LANDFILL GAS VENTING SYSTEM ( +$74,250.96) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: INTEGRITY GRADING AND EXCAVATING, INC. PO BOX 138 SCHOFIELD, WI 54476 Net increase to contract: +$74,250.96 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 323 - 0470 - 7216 -06018 -- Property Improvement - Quarry Park Methane Gas Venting Upgrade CHANGE ORDER # 1 DATED: September 10, 2010 TO; Integrity Grading and Excavating, Inc. PO Box 138 Schofield, WI 54476 Your present contract with the City of Oshkosh, Contract for Knapp Street Quarries Landfill Gas Venting System, City Contract 10 -08, is hereby amended and changed as follows: Description Add /(Deduct) Additional PVC liner and Geo Fabric 215 SY $ 3.99 $ 857.85 Additional qty of garbage Winnebago As of Sept. 9, 2010 2918.52 TON $ 3.78 $ 11,032.01 Cost for change in Haul route 4733.31 TON $ 1.18 $ 5,585.31 Additional cost move material that differs from bid site conditions 1575 CY $ 7.54 $ 11,875.50 Type B Inlet protection 1 LS $ 324.53 $ 324.53 Larger Condensate Knockout 1 LS $ 866.44 $ 866.44 Additional days for test pits 3 EA $ 1,750.00 $ 5,250.00 Dozer hours to level city topsoils 16.75 HRS $ 135.00 $ 2,261 .25 Cutting off Pipe Ballards near nursing home (Laborer with Saw) 1 HRS $ 82.00 $ 82.00 Sawcut Asphalt on west quarry 68 LF $ 2.00 $ 136.00 Remob Fence crew 1 LS $ 352.94 $ 352.94 Additonal Qty of Fence installed (West Quarry) 80 LF $ 12.98 $ 1,038.40 Additional mob for Erosion Control crew 1 EA $ 705.88 $ 705.88 Silt Fence beyond plan qty 585 LF $ 3.18 $ 1,860.30 Credit for silt fence not installed 85 LF $ (3.18) $ (270.30) Straw Bales 85 LF $ 9.98 $ 848.30 Remob for Utility Crew for Street Crossing 1 LS $ 6,000.00 $ 6,000.00 Additional Qty of Street crossing 20 LF $ 724.36 $ 14,487.20 Misc tools for plugs on passive vents, and to access vent vaults 1 LS $120.00 $ 120.00 Larger Access manhole for increased sized of Condensate KO 3 EA $414.12 $ 1,242.36 Additional Landscaping 1 $ 9,595.00 Subtotal: Change Order #1 Increase $ 74,250.96 Contract Total $574,000.39 Net Increase to Contract $648,251.35 City of Oshkosh By: Approved and accepted: Contractor OHKOH ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: David C. Patek, Director of Public Works DATE: September 24, 2010 RE: Change Order No. 1 for Public Works Contract No. 10 -08 /Integrity Grading & Excavating, Inc. /Knapp Street Quarries Landfill Gas Venting System ( +$74,250.96) BACKGROUND Change Order No. 1 for Contract No. 10 -08 is scheduled for consideration by the Common Council at the September 28, 2010, meeting. The contract was originally awarded to Integrity Grading & Excavating of Schofield, WI, in February of 2010. ANALYSIS This change order adjusts the estimated bid quantities to the actual quantities installed during the construction. This change order also addresses the adjustments required per the actual conditions found at the site. For example, the location for the edges of the existing quarry did not match the locations shown on historical documents. This change required the contractor to spend additional time to complete test pits ( +$5,250). Another changed condition related to the amount of soil that covered the former quarry areas. This greater cap thickness required the contractor to expend additional effort to stockpile dirt in the park ( +11,875.50) and additional effort to restore larger areas of the park property ( +9,595). Additionally, the garbage that was removed from the site was found to be mixed with a large amount of dirt. This soil increased the weight of the material that was hauled to the Winnebago County Landfill ( +11,032). Finally, delay with obtaining permission for access to adjoining properties required the contractor to remobilize a crew to complete the final vent pipe installation at Knapp Street ( +$6000). FISCAL IMPACT The construction funding ($1.0M) for the project is included in the Property Improvements Section of the 2010 Capital Improvement Program. The original bid award of $574,000.39 will be increased to $648,251.35. The landfill tipping fees (approximately $260,000) have been paid directly to Winnebago County. RECOMMENDATIONS recommend approval of the Change Order # 1 to Contact No. 10 -08 in the amount of $74,250.96 to Integrity Grading & Excavating, Inc. Respectfully Submitted, Approved: 1 � d C. P4 --k- David C. Patek Director of Public Works City Manager 1: \Engineering \10 -08 Landfill Gas Venting Systems\ Project_ Information \Correspondence\Memo \CO #1 exp for Council.doc