HomeMy WebLinkAbout0143289-Plumbing CITY OF OSHKOSH No 143289
OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 233 FULTON AVE Owner DAVID UDONNA L RUCKER Create Date 09/21/2010
Contractor DRUCKS PLUMBING Category 410 - Residential- Interior Plan
Bathtub Clothes Wshr Classrm Sink Surgeons Sink Roof Drain Deduct Meters
Shower Lndry Tray Exam Sink Sterilizer Soda Disp Wtr Sewer Mtrs
Whirlpool Sump Pump F Prep Sink RPZ Valve Coffee Maker Wtr Usage Mtrs
Lavatory San Sump /Pump Flr/Wst Sink Bidet Site Drain Misc.
Toilet Water Softner Hand Sink Urinal Wait. St. Fixtures
Kit Sink 1 Standp Rec Lab Sink Beer Tap Ice Chest
Disposal Gar Drain Plaster Sink Dip Well Comm Ice Maker
Dishwasher 1 Local Waste Scully Sink Drink Ftn Int Grease Trap
Floor Drain Bar Sink Sery Sink Wash Ftn Ext Grease Trap
Hose Bibb Breakrm Sink Shamp Sink Catch Basin Eye Wash Statn
Water Heater
Use /Nature Kitchen remodel to include new cabinets, counter top. All walls opened shall be properly draft stopped and insulated
of Work where required.
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcel Id #
1000240000
Valuation $3,000.00 Plan Approval $0.00 Permit Fees $25.00 ❑ Permit Voided
Issued By
Date 09/23/2010
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) d to re an necessary approvals before starting such activity.
Signature Date r- -27 -/ �
Agent/Owner
Address PO BOX 355 MENASHA WI 54952 - 0000 Telephone Number 426 -2654
To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.