Loading...
HomeMy WebLinkAbout0100374-BuildingOSHKOSH ON THE WATER Job Address Designer Category Type 3337 LOUISE CT 110 - New Single Family CITY OF OSHKOSH No 0100374 BUILDING PERMIT -APPLICATION AND RECORD Create Date 03/07/2003 Owner HARLOLD SALZER Contractor SALZER SIDING Plan E1-022-0303R Building O Sign (~ Canopy O Fence O Raze Zoning R-1 Class of Const: 8 Size Irrg Unfinished/Basement 1415 Sq. Ft. Rooms 6 Height 16 Ft. [] Projection j Finished/Living 1415 Sq. Ft. Bedrooms 3 Stories 1 Canopies 0 Garage 648 Sq. Ft. Baths 2 Signs 0 Foundation O Poured Concrete (~) Floating Slab (~) Pier (~) Other (~ Concrete Block (~ Post (~ Treated Wood OccupanoyPermi, ~,~,'~-,,~ FloodPlain /~¢ Height Permit ~.* j~,,Cc,'.~J Park Dedication ..'~.~J # Dwelling Units t # Structures ,~ O Use/Nature qSFR/Single family I story, 2 car attached garage. 12' x 16' Patio. Driveway shall be a maximum of 24' wide at the front property line. of Work HVAC Contractor MCM AIR INC Plumbing Contractor WELLNITZ PLUMBING Electric COntractor SECKAR ELECTRIC Fees: Valuation $77.000.00 Plan Approval $75.00 Permit Fee Paid $311.00 Park Dedication $0.00 Issued By: ~ Date 03/25/2003 Final/O.P. 00/00/0000 [] Permit Voided In the performance of this work I agree to perform all work pu.r~suantc~to"~Jes governing the described construction. Address PO BOX 825 OSHKOS~ WI 54903 - 0825 Telephone Number (920) 231-5025 OSHKOSH ON THE WATER GRADE STAKE FORM Name HARLOLD SALZER Address 3337 LOUISE CT Lot 13 Block Subdivision Assessors Plat #1 Zone Street Number Lot Dimensions Building Grade Elevation Stakes Set At Site 03/11/2003 Set By D.W.G. BK - 586, P - 64 Grade Stake Number 6909 Create Date 03~07~2003 Ward Sidewalk Existing Department of Public Works I, the undersigned, owner or agent of the above described property agree to have the grade established before excavation has commenced. ~,~~. ,/~/., ,~,....~.~/~ ~¢V~sconsln Department of industry, Labor and Human Relations Safety and Buildings Division P.O. Box 2509 Madison, WI 53701-2509 Wisconsin Statues 101.63, 101.73 [] Constr Owner's Name HARLOLD SALZER Contractor: L~J Con[] Elec'E~ HVAC b_J Plbg ;ALZER SIDING ContractOr: ~ Con L~ Bloc LJ HVAC[~J Plbg SECKAR ELECTRIC Contractor: b~ Con ~_~ ElecL~j HVAC E~ Plbg MCM AIR INC Contractor:L~ Con [] ElecE~ HVAC[~ Plbg WELLNITZ PLUMBING WISCONSIN UNIFORM IApplication No. BUILDING PERMIT 1 0100374 APPLICATION Parcel No. [] HVAC [] Elec [] Plbg [] Erosion [] Other: Lic/Cert # 7351 Lic/Cert # 689404 Mailing Address PO BOX 825 Oshkosh WI 54903 - 0000 Mailing Address PO BOX 825 OSHKOSH WI 54903 - 825 Mailing Address 5920 COURTNEY PLUMMER RD Telephone No. Telephone No. (920) 231-5025 WINNECONN[ WI 54986 - 0 Lic/Cert Cf Mailing Address 4264 6122 COUNTY ROAD M WINNECONNiW154986 -9780 Lic/Cert# Mailing Address 223819 4810 AMBERWOOD LN APPLETON WI 54915 -0 Sq. ft.I 1/4, 1/4,Section ,T N,R E(or)W I Subdivision Name / Lot No. Block No. Assessors Plat #I 13 Telephone No. (920) 582-4909 Telephone No. (920) 582-4402 Telephone No. (O)231-7390 Building Address 3337 LOUISE CT Permit No. Front Rear Left Right New [] Repair Single Family :[~ Alteration [] Raze Two Family Garage [] Addition [] Move [] Other (print): [] Other: [] Site Constructed Unfinished : [] Manufactured Basement 1415 Sq. ft. Living Area 1415 Sq. ft. 1-Story Garage 648 Sq. ft. [] 2-Story [] Other [] Plus Basement Entrance Panel Forced Air Furnace Fuel Size: 200am [] Radiant Baseboard or Panel Service: [] Heat Pump Space Htg Overhead [] Boiler Water Htg Underground [] Central Air Conditioning Dwelling unit will have 3 kilowatt or Other more installed electric space heating equip, Concrete Infiltration control option is: [] Full sealing Masonry Sewer of joints. [] Blower door test. [] Exterior Treated Wood [] Municipal air infiltration barrier. Other [] Septic Permit No. Envelope 24893 BTU/HR Infiltration 17320 BTU/HR [] Seasonal [] Permanent [] Other [] Municipal Utility [] Private On-Site Well $106,000.00 The applicant agrees to comply with all applicable codes, statues and ordinances and with the conditions of this permit, understands that the issuance of the permit creates no legal liability, express or implied, on the Department or munici/j~t~; and certifies that all the above information is accurate. APPLICANT'S SIGNATURE ¢.,¢¢~~~ .,~ ,~'.,~/'/..) DATE SIGNED A...C'I~,IA/ ~l~lnlTl~ld_~ This permit is issued ,~,sd:~nt toM'the fo~ll~win~.,914'ditions. Failure to comply may result in suspension or ..................... revocation of this permit or other penalty SEE "STANDARD CONDITIONS OF APPROVAL" SHEET [] Town [] Village [] City [] County L_~ State of: Municipality Number of Dwelling Location: CityOf Oshkosh 7 0 - 2 6 6 Plan Review $75.00 Construction HVAC Inspection [~ Electrical Wis. Permit Seal $30,00 [] Plumbing Other ;~ Erosion Total $105.00 ~ 2921 24 SBD-5823 (R. 07/92) Name JOHN ZARATE Date 3/19/03 Cert. No. 70330 57'-0' 150' 48'-0' -- 12' HOUSE GARAGE 27' 130' 25'-0' DRIVEWAY AND GRAVEL ACCESS DRIVE I 24' MAX ~ LOT LINE 3557 LOUISE CT. I .~ '$~' Project Address Permit # acknowledge that you have read Pan!ease r~ad the following information and si d agree to comPlY with theSe C0nditionSl 1. All habitable rooms must be located on the second fl°03 o~ below- ground level must be provided with egress windows in addition t9 the light and ventilation requirements. Basement windows are also Uired to h~)e' windOW W~l1 areas ih acc°rdance with ILHR 21~03~ spaces ~n 21.08. The door and frame assembly between the dwelling unit and an attached garage shall be labeled by an independent testing agency as haVing a minimUm fire'resistiVe rating of 20 mlnUtes. All d~ali j°intS are required-'to be taped/sealed tmleSS'thejoints are fitted so that the gap is no more than a dimes thickness (1/20inch) and baCked by ~solid wood or 'drYWall with the joints staggered. penetrations ~n exterior includes holes in the top and bottom plates, gaps around heating ducts; and holes in the 'return laces. are reqmred on every :detectors are reqUi3ed t° be hardwired and intercOnnected. tbs are req an access panel to motor. The access panel must removing the finish of the house. 6. All °renaming must be designed by the truss manufacturer, according to standards set by the ~ss Plate institute; °r Structural Calculations must be prOvided prior to the rough building inspection. 7. Truss plans must be submitted and approved prior to framing the roof. 8. plans including must provided 0h site at the rough building inSpection. In ~addition to the.tmss plans, microlam calculations must be provided on site at the rough building inspection for all microlams with point loads on them. must point loads. Floor trusses 10. The property owner and applicant is respon'siblb for compliance:wi~"IEHR-2l A25 (Erosion Control). When installing access drives, a minimum of 2"'3'"' diameter stone is required in addition to a minimum of 6" depth, 30'-50' length, and 14':20"Widthi~ ErOsion control measures must be maintained until the lawn is eStabli~hea'i' 11. All storm sewer inlets must be protected with approved erosion control devices. Tracking (i.e. sediment) must be removed from the stieet' atthe-end of e'adh'w~)i~l~dh~2"Repair any ' siltation or erosion damage to adjbinifig s~ace~-~afid-~fiih/ige~fi~lfi~fi~'~r75h:Fl~ .................................. development or disturbing activities. 12. The building placard must be posted on site at all times. OnCe the r0iigh framing'is up the placard must be posted on the patio door or on a kitchen WindOw]~ if~ihe plaided is not present at any inspection, stop work orders will be posted. Additional placards can be obtained throUgh our~department if the cards are misplaced. 13. All mechanicals must be roughed in prior to reqUesting the rOughbiiildiii~'iiiSp~ction. If .............. on the inspection the mechanicals are not roughed in, the inspection Will fail and a $100 re-inspection fee will be charged. 14. Attached is a copy of the final inspection checklist. At the final 'inSpection all items on this list must be completed to avoid the $100 re-inspection fee per in'specfi0n. 15. When requesting final inspections Please note that a minimum of 2 days notice is needed from the time the inspection is ready. Furniture is only allowed to be placed in the center of the garage floor and a minimum of a 3' pathway must be provided around the' Walls of the garage. At the final inspection no furniture or personal belongih~ are allowed in the house. Appliances such as the stove, refrigerator, washer, and dryer are not to beset in place due to the electrical inspector needing to look at the Power serving the apPliances. A 6' stepladder must be on site at the final inspection to provide access to the attiC. 16. The building placard must remain on the patio door or on a kitchen WindOw until occupancy is approved. Occupancy is not allowed prior to the placard having all of the final inspection approved stickers on the backside. Ifoccupanc~f~ 0'dens-prior to the inspections being approved daily citations will be issued with no further notice being given. 17. All site grading must be done in accordance with the approved drainage plan on file in the public works office, 3rd floor.