Loading...
HomeMy WebLinkAboutFinal Reinspect (Bldg & HVAC) - 03/15/1999 CITY OF OSHKOSH CORRECTION NOTICE: CONTRACTOR: ..,\1bW Cass Time Insp. Called In Date ?-,---,8---q? ADDRESS: IAD �L C GR,1 E Time Insp. Needed AS A r4) Requested By 0 11 4 -1 13S — Of Phone # Project to be Inspected 'c r — BCNSPJZ Com 1: Means of Access e, P BUILDING: PLUMBING: ELECTRIC: HVAC: EROSION CONTROL: PROPERTY MAINT.: Footing Rough Rough Rough Tracking Setback Park. Foundation Test On Service Furnace Silt Fence Unlicensed Veh. Rough Underfloor Amps Ph A/C Stone Access Garbage Insulation Sewer/Water Temp Perm Fireplace E.C. Bales. Dilapidated bld's, Bsmt. Floor Reinsp. UG OH Reinsp. t/ Reinsp. fences, etc. Reinsp. t• Final Reinsp. Final t• Final Ext. Maint. Final r✓ Other Final Other Other Other Other Other ITEM# CODE INSPECTION RESULTS f'IANOPr...- VI nX r 6 4 AM lec Nor - Fiti trrEl I 1N MA•tr AHi GA) star Rra psp 0 1J FE 7)0 — RG- 6_00RtO To 8e ti• PRIn1Z 715 - OF Bc.c. A1UCY Caen r /Cd4-TZ f) o 0C6c,PA 14-1-604.70 VIOLATIONS MUST BE CORRECTED AND APPROVED WITHIN 30 DAYS UNLESS NOTED BELOW CALL FOR INSPECTIONS BEFORE CONCEALMENT AND /OR OCCUPANCY!! COMPLIANCE DATE: Action Taken: of proved/ Inspection Report left on site ❑ Not Approved/ Inspection Report given to Signed ,- f,�'9'7 " j Inspection Services Division Date Of Inspection Phone Number