HomeMy WebLinkAboutFinal Reinspect (Bldg & HVAC) - 03/15/1999 CITY OF OSHKOSH CORRECTION NOTICE:
CONTRACTOR: ..,\1bW Cass Time Insp. Called In
Date ?-,---,8---q?
ADDRESS: IAD �L C GR,1 E Time Insp. Needed AS A r4)
Requested By 0 11 4 -1 13S —
Of
Phone #
Project to be Inspected 'c r — BCNSPJZ Com 1:
Means of Access e, P
BUILDING: PLUMBING: ELECTRIC: HVAC: EROSION CONTROL: PROPERTY MAINT.:
Footing Rough Rough Rough Tracking Setback Park.
Foundation Test On Service Furnace Silt Fence Unlicensed Veh.
Rough Underfloor Amps Ph A/C Stone Access Garbage
Insulation Sewer/Water Temp Perm Fireplace E.C. Bales. Dilapidated bld's,
Bsmt. Floor Reinsp. UG OH Reinsp. t/ Reinsp. fences, etc.
Reinsp. t• Final Reinsp. Final t• Final Ext. Maint.
Final r✓ Other Final Other Other Other
Other Other
ITEM# CODE INSPECTION RESULTS
f'IANOPr...- VI nX r 6 4 AM lec Nor - Fiti trrEl I 1N MA•tr AHi
GA) star
Rra psp 0 1J FE 7)0 —
RG- 6_00RtO To 8e ti• PRIn1Z 715 -
OF Bc.c. A1UCY Caen r /Cd4-TZ
f) o 0C6c,PA 14-1-604.70
VIOLATIONS MUST BE CORRECTED AND APPROVED WITHIN 30 DAYS UNLESS NOTED BELOW
CALL FOR INSPECTIONS BEFORE CONCEALMENT AND /OR OCCUPANCY!!
COMPLIANCE DATE:
Action Taken: of proved/ Inspection Report left on site
❑ Not Approved/ Inspection Report given to
Signed ,- f,�'9'7 " j
Inspection Services Division Date Of Inspection Phone Number