HomeMy WebLinkAbout0142530-Plumbing (toilet) le CITY OF OSHKOSH No 142530
OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 1355 W 18TH AVE Owner DAVID L/DONNA M BREHMER
Create Date 08/11/2010
Contractor SOPER PLUMBING Category 413 - Res - Interior (Replacement Fixtures) Plan
Bathtub Clothes Wshr Classrm Sink Surgeons Sink Roof Drain
Shower Lndry Tray Exam Sink Sterilizer Deduct Meters
Whirlpool Soda Disp Wtr Sewer Mtrs
P Sump Pump F Prep Sink RPZ Valve Coffee Maker Wtr Usage Mtrs
Lavatory San Sump /Pump Flr/Wst Sink Bidet
Toilet Site Drain Misc.
1 Water Softner Hand Sink Urinal Wait. St. Fixtures
Kit Sink Standp Rec Lab Sink
Beer Tap Ice Chest
Disposal Gar Drain Plaster Sink Dip Well
P Comm Ice Maker
Dishwasher Local Waste Sculry Sink Drink Ftn
Floor Drain Int Grease Trap
Bar Sink Sery Sink Wash Ftn Ext Grease Trap
Hose Bibb Breakrm Sink Shamp Sink Catch Basin
Water Heater Eye Wash Statn
Use /Nature CONDO / REPLACE TOILET FOR LOWE'S * *debit acct
of Work
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcel Id #
1307301600
Valuation $350.00 Plan Approval $0.00 Permit Fees
( $25.00 El Permit Voided
Issued By CJ 1—
Date 08/11/2010
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Agent/Owner
Address 2225 BURNWOOD DR OSHKOSH WI 54902 - 9003 Telephone Number 426 -2151
To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.