Loading...
HomeMy WebLinkAbout10-242AUGUST 10, 2010 10 -242 RESOLUTION (CARRIED 6 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVAL OF CHANGE ORDER NO. 1 FOR PUBLIC WORKS CONTRACT 09 -18 WITH NORTHEAST ASPHALT INC. FOR ASPHALT PAVING & UNDERGROUND WORK (-$31,356.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: NORTHEAST ASPHALT INC. W6380 Design Drive Greenville, WI 54952 Net Decrease to contract: (- $31,356.00) PURPOSE: See attached Change Order. CHANGE ORDER # 1 DATED: June 23, 2010 TO: Northeast Ashpalt Inc W6380 Design Drive Greenville, WI 54952 Your present contract with the City of Oshkosh, Contract No. and changed as follows: NET DECREASE TO: SECTION I -ASPHALT PAVING NET DECREASE TO: SECTION II - STORM SEWER NET DECREASE TO: SECTION III - SANITARY SEWER NET DECREASE TO CONTRACT: Recommended: Director of Public Works 09 -18 , is hereby amended ($26,374.15) ($1,059.85) ($3,922.00) ($31,356.00) CITY OF OSHKOSH BY: City Manager City Clerk App a and accepted: Contractor 7� I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT: 09 -18 CHANGE ORDER # 1 SECTION I - ASPHALT PAVING 100. Sidewalk and driveway INCREASE IN DECREASE IN ITEM removal, complete as Square CONTRACT INSTALLED NET NET COST PER DESCRIPTION UNIT 1,745 2,099.00 354.00 $1.48 CONTRACT CONTRACT NUMBER Excavation, complete as Cubic QUANTITIES QUANTITIES INCREASE DECREASE UNIT specified Yards 1,230 694.00 - 536.00 $15.26 PRICE PRICE 100. Sidewalk and driveway removal, complete as Square specified Feet 1,745 2,099.00 354.00 $1.48 $523.92 101. Excavation, complete as Cubic specified Yards 1,230 694.00 - 536.00 $15.26 ($8,179.36 102. Asphalt pavement milling, Square complete asspecified Yards 9,600 9,600.00 $2.35 103. Asphaltic concrete pavement, lower layer, complete asspecified Tons 1,430 1,612.00 182.00 $62.00 $11,284.00 104. Asphaltic concrete pavement, upper layer, complete asspecified Tons 1 1,220 1,109.00 - 111.00 1 $62.00 ($6,882.00) 105. 3 ' /1 ' asphaltic concrete driveway, complete as Square s ecified Feet 1,950 1,454.00 - 496.00 $4.75 $2,356.00 106. Asphalt pavement repair, Square , complete asspecified Yards 60 83.00 23.00 $35.00 $805.00 107. Tack or prime coat, complete asspecified Gallon 330 300.00 -30.00 $3.00 ($90.00 108. 4" concrete sidewalk, Square complete asspecified Feet 1,000 1,192.00 192.00 $3.50 $672.00 109. 6" concrete sidewalk & driveway, complete as Square specified Feet 385 332.00 -53.00 $3.75 ($198.75 110. 6" H.E.S. concrete sidewalk & driveway, Square complete asspecified Feet 320 562.00 242.00 $4.77 $1,154.34 111. Furnish and install crushed stone base course, complete as specified Tons 2,100 1,058.00 - 1,042.00 $13.50 $14,067.00) 112. One foot (1') gravel shoulder, complete as Linear specified Feet 6,700 6,844.00 144.00 $1.00 $144.00 113. Sawing, complete as Linear specified Feet 1,390 1,279.00 - 111.00 $1.30 ($144.30 114. Adjust manholes and inlets, complete as specified Each 30 6.00 -24.00 $415.00 $9,960.00) 115. Remove trees and stumps, complete as specified Inch Diameter 1 65 88.00 23.00 1 $40.00 $920.00 116. Furnish and install trees, . Complete asspecified Each 3 3.00 $500.00 117. Preparation of foundation for asphalt paving on Congress Avenue, complete asspecified Lump Sum 1 1.00 $1,990.00 118. Preparation of foundation for asphalt paving on Stoney Beach Road, com lete asspecified Lump Sum 1 1.00 $3,000.00 Page 1 of 4 CONTRACT: 09 -18 CHANGE ORDER # 1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 119. Preparation of foundation PRICE PRICE for asphalt paving on Stoney Beach Lane, complete asspecified Lump Sum 1 1.00 $3,075.00 120. Preparation of foundation for asphalt paving on Stoney Beach Street, complete asspecified Lump Sum 1 1.00 $3,100.00 121. Preparation of foundation for asphalt paving on public alley south of Oshkosh Avenue (N. Eagle St. to Punhoqua St.), complete as specified Lump Sum 1 1.00 $3,050.00 122. Preparation of foundation for asphalt paving on public alley north of Algoma Blvd., complete as specified Lump Sum 1 1.00 $1,975.00 123. Preparation of foundation for asphalt paving on W. 25th Avenue cul -de -sac, complete asspecified Lump Suml 1 1.00 $2,500.00 124. Preparation of foundation for asphalt paving on Progress Drive, complete asspecified Lump Sum 1 1.00 $2,300.00 125. Terrace work on Stoney Beach Road, complete as , specified Lump Sum 1 1.00 $8,600.00 126. Terrace work on Stoney Beach Lane, complete as specified Lump Sum 1 1.00 $4,800.00 127. Terrace work on Stoney Beach Street, complete as s ecified Lump Sum 1 1.00 $6,700.00 128. Terrace work on public alley south of Oshkosh Avenue (N. Eagle St. to Punhoqua St.), complete asspecified Lump Sum 1 1.00 $2,900.00 129. Terrace work on W. 25th Avenue cul -de -sac, complete ass ecified Lump Sum 1 1.00 $1,500.00 SECTION I - (BID ITEMS 100 -129) - SUB - TOTALS $15,503.26 ($41,877.41) NET DECREASE TO: SECTION 1 ($26,374.15) SECTION II - STORM SEWER ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE Page 2 of 4 CONTRACT: 09 -18 CHANGE ORDER # 1 ITEM Furnish and install 8" CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT complete as specified Linear PRICE PRICE 200. Furnish and install 12" Feet 15 7.50 -7.50 $200.00 ($1,500.00) 301. storm sewer, complete as Linear specified Feet 85 85.40 0.40 $18.00 $7.20 201. Furnish and install 15" Linear storm sewer, complete as Linear 40 18.00 -22.00 $100.00 ($2,200.00) 302. specified Feet 270 264.90 -5.10 $21.50 ($109.65) 202. Furnish and install std. type 1 inlet (30" inside diameter Lump Sum 1 1.00 $1,100.00 303. with 18" sump) without casting, complete as . specified Each 5 5.00 $800.00 203. Rebuild with base std. storm manhole (V inside diameter) in one location without casting, complete Vertical asspecified Feet 3.3 3.40 0.10 $540.00 $54.00 204. Furnish and install 6" storm lateral, complete as Linear specified Feet 90 66.50 -23.50 $14.40 ($338.40) 205. Furnish and install storm lateral marker balls, complete asspecified Each 11 6.00 -5.00 $25.00 $125.00) 206. Remove 6" storm sewer, Linear complete asspecified Feet 310 186.00 - 124.00 $2.00 $248.00) 207. Abandon inlets or manholes, complete as specified Each 2 2.00 $280.00 208. Furnish, install, and maintain Type "D" inlet protection, complete as , specified Each 25 22.00 -3.00 $100.00 $300.00 SECTION II - (BID ITEMS 200 - 208) - SUB - TOTALS $61.20 ($1,121.05) NET DECREASE TO: SECTION II ($1,059.85) SECTION III - SANITARY SEWER ITEM Furnish and install 8" CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT complete as specified Linear PRICE PRICE 300. Furnish and install 8" sanitary sewer spot repair, complete as specified Linear Feet 15 7.50 -7.50 $200.00 ($1,500.00) 301. Furnish and install 10" sanitary sewer spot repair, complete as specified Linear Feet 40 18.00 -22.00 $100.00 ($2,200.00) 302. Remove and replace 8" sanitary sewer drop, complete asspecified Lump Sum 1 1.00 $1,100.00 303. Furnish and install 8" x 4" factory wyes or tees, complete asspecified Each 2 2.00 $130.00 Page 3 of 4 CONTRACT: 09 -18 CHANGE ORDER # 1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 304. Furnish and install 10" x 6" factory wyes or tees, — complete asspecified Each 4 4.00 $190.00 305. Furnish and install 4'76" sanitary lateral relay, Linear complete asspecified Feet 25 17.60 -7.40 $30.00 ($222.00) 306. Furnish and install sanitary lateral marker balls, complete as specified Each 6 6.00 $15.00 307. Furnish and install connections of new sanitary main to existing main (various locations and sizes), complete as specified Each 9 9.00 $200.00 SECTION III - (BID ITEMS 300 - 307) - SUB - TOTALS NET DECREASE TO: SECTION III $0.00 ($3,922.00) ($3,922.00) NET INCREASE TO SECTIONS I, II, III $15,564.46 NET DECREASE TO SECTIONS I, 11, III ($46,920.46) NET DECREASE TO CONTRACT: ($31,356.00) Page 4 of 4 ( 0 O HKO H ON THE WATER MEMORANDUM TO: FROM: DATE: RE: Honorable Mayor and Members of the Common Council Steven M. Gohde, Assistant Director of Public Works August 5, 2010 Change Order #1 for Public Works Contract No. 09 -18 / Northeast Asphalt Inc./ Asphalt Paving and Underground Work (- $31,356.00) BACKGROUND Change Order #1 for Contract 09 -18 is scheduled for consideration by the Common Council at the August 10, 2010 meeting. The contract was originally awarded to Northeast Asphalt Inc., of Greenville, WI in September of 2009. ANALYSIS This change order adjusts the estimated bid quantities to the actual quantities installed during the construction. Reductions in the paving section were due to not needing as much stone base as estimated. Reductions in the storm sewer and sanitary sewer section were due to reduced quantities of items needed to match field conditions. FISCAL IMPACT Funding for the project is in the 2009 Capital Improvement Program Budgets. The original contract amount was $356,060.05. The change order amounts are - $26,374.15 for Paving, - $1,059.85 for Storm Sewer, and - $3,922.00 for Sanitary Sewer. RECOMMENDATIONS recommend approval of the Change Order # 1 to Contact No. 19 -18 in the amount of - $31,356.00 to Northeast Asphalt Inc. Respectfully Submitted, Steven M. Gohde Asst. Director of Public Works Approved: City Manager 1:\Engineering109 -18 Asphalt Paving\ Project_ Information \Correspondence\Memo\CO #I exp.doc