HomeMy WebLinkAbout2003-Plumbing C5-55-0903-P City of Oshkosh
Inspection Services
215 Church Ave., PO Box 1130
Oshkosh, WI 54902-1130
O.f HKQf H (920) 236 -5049 (920) 236 -5106 FAX
ON THE WATER
October 7, 2003
Four Way Construction
P Box 133
Berlin, WI 54923 -0133
Lawrence Zangl Enterprises, Private Mains and Laterals
Ref: Plumbing Plan Approval: 1750 Robin Lane, Oshkosh, WI
Plan ID# C5 -55- 0903 -P
Dear Sirs,
Examination of the plumbing plans and specifications for this project has been completed. In
accord with Chapter 145, Wisconsin Statute, and COMM 81 through 85, Wisconsin
Administrative Code, the plumbing plans and specifications are approved contingent upon
compliance with the stipulation(s) noted below.
1. The approval will be for development of private sewer and water mains serving
three multifamily buildings and their respective service laterals in addendum.
In the event installation of this plumbing system has not commenced within two years from this
date, this approval shall become void. A new application accompanied by full examination
fees shall be filed and an updated approval received before work may commence.
In granting this approval, the City of Oshkosh or its representative does not hold itself liable for
any defects in plans or specifications, plan omissions, examination oversight, construction or
any damage that may result in or after installation. The City of Oshkosh reserves the right to
order changes or additions should conditions arise making this necessary.
It shall be necessary for the installing plumber to obtain a plumbing permit from the City of
Oshkosh before proceeding with actual installation of this plumbing system or any of its parts.
Respectfully,
Richard Wood,
Plumbing Inspector
t r EAST CENTRAL WISCONSIN REGIONAL PLANNING COMMISSION
-F
Ib'j-
W: �� i / 132 Main Street Menasha Wisconsin 54952 -3100 (920) 751-4770 Fax (920) 751 -4771
1 'to Website: www.eastcentralrpc.org Email: staff @easicentrslrpc.or
- 8
µ
,, ',$
An Economic Development District and Metropolitan Planning Organization
Serving the East Central Wisconsin Region for over 30 years
September 30, 2003
Dan Kalupa
Four -Way Construction of Wisconsin, Inc.
P.O. Box 133
Berlin, WI 54923
Dear Mr. Kalupa: East Central Review No 2003 -274
Subject: East Central Comments — Sanitary Sewer Lateral Proposal
The East Central Wisconsin Regional Planning Commission, in accordance with Wisconsin
Administrative Code COMM. 82, s.82.20(4)(c), has reviewed the proposed sanitary sewer lateral for
the apartment development located on 1750 Robin Avenue, City of Oshkosh, Winnebago County.
East Central has determined the proposed development is within the Oshkosh Sewer Service
Area. This project is also consistent with the Sewer Service Areawide Water Quality Management
Plan elements.
A copy of this letter should be enclosed with the project plans sent to the Wisconsin Department of
Commerce and other appropriate review agencies for their review. If you have any questions, please
contact East Central.
Sincerely,
f .44/ / /14#41
Harlan P. Kiesow
Executive Director
HPK\jwh
Member Counties Calumet Menominee Outagamie Shawano Waupaca Waushara Winnebago