HomeMy WebLinkAbout10-232JULY 27, 2010 10 -232 RESOLUTION (CARRIED 7 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVAL OF CHANGE ORDER NO. 1 FOR PUBLIC WORKS CONTRACT NO. 10 -03 WITH ADVANCE CONSTRUCTION INC. FOR USH 41 CORRIDOR UTILITIES — COUNTY K (20TH AVENUE) ( +$45,351.86) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: ADVANCE CONSTRUCTION INC. 2141 WOODALE AVE. GREEN BAY, WI 54313 Net Increase to contract: $45,351.86 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 541 - 1810 - 1799 -00000 Water Utility Construction Work In Progress Acct. No. 551 - 1910 - 1799 -00000 Sewer Utility Construction Work In Progress CHANGE ORDER # 1 DATED: July 9, 2010 TO: Advance Construction Inc. 2141 Woodale Ave Green Bay WI 54313 Your present contract with the City of Oshkosh, Contract No and changed as follows: NET DECREASE TO: SECTION I - CONCRETE PAVING NET DECREASE TO: SECTION III - SANITARY SEWER NET INCREASE TO: SECTION IV - WATER MAIN NET INCREASE TO CONTRACT: Recommended: Director of Public Works BY: 10 -03 , is hereby amended ($7,949.00) ($236.00) $53,536.86 $45,351.86 CITY OF OSHKOSH City Manager City Clerk Approved and acce ted: 4 ontractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT: 10 -03 CHANGE ORDER # 1 SECTION I - CONCRETE PAVING ITEM Pavement removal, Square CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT 101 9" non - reinforced concrete PRICE PRICE 100 Pavement removal, Square CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER complete asspecified Yards 190 143.44 / NCREASE 46.56 $4.50 CONTRACT ($209.52 101 9" non - reinforced concrete PRICE PRICE pavement, including integral curb, 6" base material and grading, Square complete as specified Yards 190 143.44 -46.56 $71.00 ($3,305.76 102 3 1/2" asphaltic concrete driveway, complete as Square specified Yards 260 100.92 1 - 159.08 $30.00 ($4,772.40 103 Sawing, complete as Linear specified Feet 550 298.70 - 251.30 $2.00 ($502.60 104 Furnish and install pavement ties (epoxy coated), complete as specified Each 55 57.00 2.00 $7.00 $14.00 105 Adjust manholes and inlets, . complete as specified Each 1 2.00 1.00 $350.00 $350.00 106 Topsoil, seed, fertilizer and erosion mat, complete as Square specified Yards 1,075 1200.60 125.60 $3.80 $477.28 107 Furnish, install, maintain and remove inlet protection type D, as shown on the plans, complete as specified Each 2 2.00 $70.00 108 Furnish, install, maintain and remove tracking pads, as shown on the plans, complete as specified Each 1 1.00 $700.00 109 Furnish, install, maintain and remove silt fence, as shown on the plans, Linear complete asspecified Feet 600 600.00 $1.70 110 Furnish, install, maintain and remove traffic control. Lump complete asspecified Sum 1 1.00 $5,000.00 SECTION I - (BID ITEMS 100 -110) - SUB - TOTALS $841.28 ($8,790.28) NET DECREASE TO: SECTION 1 ($7,949.00) SECTION III - SANITARY SEWER ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER QUANTITIES QUANTITIES / NCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 300 Furnish and install 12" sanitary sewer (PVC Pipe), Linear complete as specified Feet 91 90.00 -1.00 $110.00 ($110.00 Page 1 of 3 CONTRACT: 10 -03 CHANGE ORDER # 1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COSTPER INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 301 Furnish and install std. PRICE PRICE sanitary manhole (4' inside Linear diameter), complete as Vertical 10 8.50 -1.50 $150.00 ($225.00 401 specified without casting Feet 10.5 9.87 -0.63 $200.00 1 ($126.00 302 Furnish and install connections of new sanitary main to existing Linear main, (various locations Feet 366 363.00 -3.00 $88.00 ($264.00 402 and sizes), complete as specified Each 1 1.00 $1,000.00 303 Abandon sanitary sewer on Koeller Street, complete as Lump specified Sum 1 1.00 $500.00 304 Remove existing sanitary Feet 1 230 240.00 10.00 $85.00 1 $850.00 403 sewer manhole, complete asspecified Each 1 1.00 $500.00 SECTION III - (BID ITEMS 300 - 304) - SUB - TOTALS $0.00 ($236.00) NET DECREASE TO: SECTION III ($236.00) SECTION IV - WATER MAIN ITEM Furnish and install 12" CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE !N NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES IN DECREASE I UNIT CONTRACT CONTRACT poly wrap, complete as PRICE PRICE 400 Furnish and install 12" ductile iron water main with poly wrap, complete as specified (fittings not Linear included ) Feet 10 8.50 -1.50 $150.00 ($225.00 401 Furnish and install 16" ductile iron water main with poly wrap, complete as specified (fittings not Linear included ) Feet 366 363.00 -3.00 $88.00 ($264.00 402 Furnish and install 16" ductile iron water main with poly wrap and snap -lok restrained joints, complete as specified (fittings not Linear included ) Feet 1 230 240.00 10.00 $85.00 1 $850.00 403 Jack and bore 30" steel casing pipe, complete as Linear specified Feet 230 230.00 $425.00 404 Furnish and install 16" x 12" reducers, complete as specified Each 2 2.00 $627.00 405 Furnish and install 16" - 45 degree bends, complete as specified Each 6 6.00 $870.00 406 Furnish and install 12" x 12" tapping sleeve and valve, complete as s ecified Each 2 2.00 $7,000.00 Page 2 of 3 CONTRACT: 10 -03 CHANGE ORDER # 1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT 105 +72, 32.0' Lt., PRICE PRICE 407 Abandon water main on CTH K (20TH Avenue), Lump complete asspecified Sum 1 1.00 $1,000.00 408 Furnish and install 12" Sum 0.00 1.00 1.00 $6,886.80 $6,886.80 411 caps, complete as specified Each 2 2.00 $400.00 409 Furnish and install 1" water services, complete as specified Each 2 2.00 $1,000.00 SECTION IV - (BID ITEMS 400 - 409) - SUB - TOTALS $850.00 ($489.00) ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION IV ITEM Furnish and install water CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE !N NUMBER DESCRIPTION UNIT QUANTITIES QUANTITIES INCREASE I DECREASE I UNIT CONTRACT CONTRACT 105 +72, 32.0' Lt., PRICE PRICE 410 Furnish and install water valve mahole at Station 105 +72, 32.0' Lt., approximately 26 feet deep, complete as specified, per Invoice dated Lump Mav 7 2010 Sum 0.00 1.00 1.00 $6,886.80 $6,886.80 411 Furnish and install, slurry fill for the abandoned watermain per Wisconsin D.O.T. request, complete as specified, per Invoice Lump date May 7 2010 Sum 0.00 1.00 1.00 $1,944.931 $1,944.93 412 Additional 4 -man crew hours required to remove boulders that were in conflict with the boring, per Invoice dated May 7, 2010 Hrs. 0.00 43.50 43.50 $493.50 $21,467.25 413 Additional 5 -man crew hours required to remove boulders that were in conflict with the boring, per Invoice dated May 7, 2010 Hrs. 0.00 41.50 41.50 $551.25 $22,876.88 ADDITIONAL WORK: C.O. # 1 (ITEMS 410 - 413) - SUB -TOTAL $53,175.86 $0.00 NET INCREASE TO: SECTION IV $53,536.86 NET INCREASE TO SECTIONS I, II, III, IV $54,867.14 NET DECREASE TO SECTIONS I, II, III, IV ($9,515.28) NET INCREASE TO CONTRACT: $45,351.86 Page 3 of 3 0 00-KO 00-KOf H ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works DATE: July 22, 2010 RE: Change Order #1 for Public Works Contract No. 10 -03; for Advance Construction Inc. — USH 41 Corridor Utilities ($45,351.86) BACKGROUND Change Order #1 for Contract 10 -03 is scheduled for consideration by the Common Council at the July 27, 2010 meeting. The contract was originally awarded Advance Construction Inc. in February of 2010. This change order balances all items to the actual installed quantities and adds additional work needed to complete the project. This project was not included in the 2010 CIP, but needed to be completed to allow the 20 Ave. overpass of USH 41 to be reconstructed. ANALYSIS Following is a summary of the significant additional work items performed for each section of the CIP. - Concrete Paving and Sanitary Sewer quantities were reduced to actual quantities installed. -Water Main included additional work required by the Wisconsin Department of Transportation and additional work to remove boulders encountered during boring under USH 41. FISCAL IMPACT Contract Section Change Order Amount New Contract Total Concrete Paving - $7,949.00 $26,976.00 Sanitary Sewer - $236.00 $13,874.00 Water Main $53,536.86 $228,818.86 Total $45,351.86 $269,668.86 Adequate funds are available in the relating sections of the 2010 Capital Improvement Budgets due to cost savings on other projects. The Wisconsin Department of Transportation will reimburse the City for 90% of the cost for the additional work. RECOMMENDATIONS I recommend approval of the Amended Change Order #1 to Contact No. 10 -03 in the amount of $45,351.86 to Advance Construction Inc. R Submitted, Approved: Steven M. Gohde Asst. Director of Public Works City Manager 1AEngineering \10 -03 USH 41 Corridor Utilities\ Project_ Information \Correspondence\Memo \CO #1 exp.doc