Loading...
HomeMy WebLinkAbout10-233JULY 27, 2010 10 -233 RESOLUTION (CARRIED 7 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE 2010 PROGRAM FOR NEW SIDEWALK ON NORTH MAIN STREET, VENTURE DRIVE AND WEST 9TH AVENUE INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh as follows: That sidewalks be constructed according to the established grade pursuant to Section 66.0907 of the Wisconsin Statutes, and the ordinances of the City of Oshkosh on the following locations: North Main Street (Fernau Avenue to Snell Road, East Side) Venture Drive (North Side) West 9th Avenue (Oakwood Road to Quail Run Drive, North Side) ( 0 Of HKO H ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, P.E. Assistant Director of Public Works DATE: July 22, 2010 RE: 2010 Program for Construction of New Sidewalk on Various Streets BACKGROUND Per State Statutes, the Common Council is required to pass a resolution which approves the locations desired for the installation of new pubic sidewalk. The past emphasis for those installations are curb /gutter streets which are designated as arterials or collectors because of higher vehicular traffic volumes. ANALYSIS The 2010 program continues on North Main Street (Fernau Avenue to Snell Road) per the direction of the Common Council. Other locations include a section of W 9 th Avenue (North side from Oakwood Road to Quail Run Drive) and Venture Drive (North side from W. South Park Avenue to west end). I have attached a copy of a letter sent to abutting property owners for reference. Residents have been notified that Common Council action will occur on July 27, 2010. FISCAL IMPACT These locations were approved as part of the 2010 Capital Improvement Program. Property owners are charged for 100% of the construction expense abutting their land and the City pays for handicap ramp installations at intersections. RECOMMENDATIONS I recommend approval of the resolution. Respectfully Submitted, Approved: i/ `/ zJ4 mot. Steven M. Gohde, P.E. Mark A. Rohloff Assistant Director of Public Works City Manager I:1Engineering110 -06 Concrete Sidewalk\ Project_ Information \CorrespondenceWemo\2010 Progam for Constr of New Sidewalks.doc CITY HALL 215 Church Avenue P.O. Box 1130 Oshkosh, Wisconsin 54903 -1130 City of Oshkosh o� June 14, 2010 To Property Owners on: North Main Street (Fernau Avenue to Snell Road, East Side) 9" Avenue (Oakwood Road to Quail Run Drive, North Side) Venture Drive (North Side) Z On 4ujy-- 1-3—,2414�, the City of Oshkosh Common Council will consider installation of sidewalks along the frontage of your property. This informational letter is being sent to all affected properties prior to the Common Council adopting a resolution ordering the completion of this construction. If this resolution is approved, another notice will be sent which gives you 20 days to install the sidewalk with a licensed contractor of your choice. Most property owners ignore this notice and they let the city's contractor install the sidewalk. There is no penalty if you choose to let the city build the sidewalk and you only pay for the sidewalk constructed along the frontage of your property. The July 13 meeting will be held at 6:00 p.m. in the Council Chambers on the 4 floor of City Hall. You may appear and voice your opinion on the proposed installation of sidewalk at the Common Council meeting. If you have questions about the proposed sidewalk construction, please call Assi$tant Director of Public Works, Steve . Gohde, or Civil Engineer Supervisor, Pete Gulbronson, at the Engineering Division Office at (920) 236 -5065. Sincerely, David C. Patek Director of Public Works DCP /clm cc: Mark A. Rohloff, City Manager .z t�: