HomeMy WebLinkAboutBuilding (....D CITY OF OSHKOSH No 0095080
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 450 W RIPPLE AVE Owner EVCO PLASTICS Create Date 05/29/2002
Designer Raasch Assoc Contractor MCCLOUD CONSTRUCTION, INC.
Category 209 - New Industrial Plan E8 -42 -0502
Type • Building O Sign O Canopy 0 Fence 0 Raze
Zoning M3 Class of Const: 6 Size 229x233 Appro
Unfinished /Basement 0 Sq. Ft. Rooms 0 Height 31 Ft. ❑ Projection
Finished /Living 67557 Sq. Ft. Bedrooms 0 Stories 1 Canopies 0
Garage 0 Sq. Ft. Baths 0 Signs 0
Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Required Flood Plain Height Permit Required
Park Dedication Not Required # Dwelling Units 0 # Structures 1
Use /Nature New 67,557 Factory. *Note: No work to continue above the foundation until Storm Drainage plans are completely approved and Planning
of Work Services has reviewed and approved the plans.
I _ I
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $1,200,000.00 Plan Approval $0.00 Permit Fee Paid $3,675.00 Park Dedication $0.00
Issued By: Date 06/13/2002 Final /O.P. 00 /00 /0000
❑ Permit Voided
In the perf of this work I agree perform all work pursuant to rules governing the described construction.
Signature
v Date
i,3 6e4
Agent/Owner
Address PO BOX 661 BROOKFIELD WI 53008 - 0661 Telephone Number 262 -784 -1804
ZONING /LAND USE COMPLIANCE CHECKLIST
JOB LOCATION: 4 - � � �• f? i p / , ' ZONING
PROPERTY OWNER/CONTRACTOR
CONSTRUCTION DATA: 3 New Construction Addition Alteration
TYPE OF CONSTRUCTION: (i.e. fence, pool, panting lot, sign, etc.)
r a.c...Vo7
COMPLIANCE CHECKLIST
DEFICIENT COMMENTS
Use 4 5, LpS ff W e d>n' t, us , Y\*rf-
Lot Width a� A S*
Lot Area ,+- " `" '` > > v'�S
Lot Area Per Family
Floodplain
Front Yard s `' wj turv$ -
Front Yard Side Street
Rear Yard -rc J$ : 'i - -
Side Yards
Building Area S� 5�^�65.
Parking Standards
Off -Street Loading Standards , : 60 ,
Vision Clearance _ I1_ � •
�
Transitional Yard Standards
— 77 Landscape Standards
Height L A 4 tJ ot. --
Conditions of Approval
Compliance with P.C. or • ( - )2--OZ
BZA Conditions of
Approval
Signage Standards
Drainage Plan
REVIEW AUTHORITY
As per Section 30 -5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or
designee, must approval all plans, except the following: (1) Alterations or interior work when the use is
conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc.,
when the use is confo - • when no change is proposed.
- tt- c1Z
A PPROVED X- DENIED
Plan Commission Action Required
Variance(s) Required
REVIEWED BY: Z A,/ t DATE: - -o2
375 City Center, Suite M
�� Oshkosh, WI 54901
i 0 I
, nc
• 920- 232 - 9786.920- 232 -4954 Fax
The • -z` atrial Development Corporation Email: chamco@chamco.org
June 4, 2002
Mr. Gary L. Schneider, Executive VP
Raasch Associates, Inc.
400 AMS Court
Green Bay, WI 54313
Dear Gary:
This letter is to confirm in writing the determination of the Site Plan Review Committee in
regard to the recently submitted plans for the new Evco Plastics facility to be constructed in our
Aviation Industrial Park here in Oshkosh, Wisconsin.
First, let me share with you the praise the Committee had for the design of the building. This
structure will be a tremendous addition to this park and our community.
The front, side, and rear yard setbacks all appear to comply with our covenants. We would like
to point out that with parcels adjacent to residential areas; the setback is a 50' requirement.
Obviously you are in compliance; however, we do suggest you indicate your understanding of
this setback requirement in the adjacent side yard area versus your notation of the standard 25'
requirement.
The truck turning radius also appears satisfactory. We do ask that this also be reviewed by the
City of Oshkosh's Engineering Department. In addition, we remind you of the fact that the City
needs to review the landscape plan, storm water plan, and review the plans for building code
compliance.
It appears there are no issues of height in reference to airport traffic and requirements. We do
suggest that the contractor, McCloud Construction, talk with Airport Director Duncan Henderson
prior to beginning construction and share with him the details of your plans. I am sure he will
appreciate this information and consideration.
There seems to adequate parking for your employees at both the present time and for future
expansion. This also is in compliance with our 2/3 ratio of parking stalls per employee on the
peak shift.
We would like to take this time to remind you of that portion of the covenants which insist that
all outdoor storage be fully screened at a minimum height of six feet.
To date, we have not seen any plans for signage. At what point you are ready to proceed with
these decisions and plans, please just give us a call. We will be happy to expedite the approval
necessary in this regard as signage does require our approval as well, prior to applying for the
necessary City permits.
Advancing the Industrial Development of Oshkosh Since 1960
I believe this covers all the necessary points in our approval process. Let me again state what a
thorough, well -done, package you presented to us. It sure made our process much easier, and I
am sure the City's as well!
Thank you for your communication and efficiency in providing us with the information we
needed. We wish you success in this project and the others coming your way. Please do not
hesitate to contact me whenever I can be of further assistance.
Again, it was a pleasure to work with you and Raasch Associates.
Sincer yours,
r �
Penny K. Vhilz
Economic Development Assistant
Cc: David Borsuk, Chamco Site Plan Review Committee Chairman
Dean Arganbright, Chamco President
Richard A. Wollangk, Oshkosh City Manager
+.Matt Tucker, Associate Planner, City of Oshkosh
Douglas C. Pearson, Chamco Executive Director
Dave A. Schultz, Vice President, McCloud Construction, Inc.
Dale M. Evans, President, Evco Plastics
Allyn Dannhoff, Chief Building Inspector, City of Oshkosh