HomeMy WebLinkAboutPlumbing A6-582 (05/20/1982) •
CITY
OF
OSHKOSH
•
May 20, 1982
David C. Frank
4660 Sandy Beach Rd.
Oshkosh, WI 54901
RE: Plumbing Plan Approval for
La Sure's Cake Cusine, 1570 Ripon Lane
Plan ID #A6 -582
Gentlemen:
Examination of the plumbing plans and specifications for the abovementioned
project has been completed.
In accord with Chapter 145, Wisconsin Statutes, and Chapter H62, Wisconsin
Administrative Code, the plumbing plans and specifications are approved
contingent upon compliance with the stipulation noted below:
1) Plumbing Plan is in reasonable compliance with state and local
plumbing regulations.
The architect, professional engineer, registered designer, owner or plumbing
contractor shall keep, at the construction site, one set of plans bearing the
stamp of approval.
In the event installation of this plumbing system has not commenced within
two years from this date, this approval shall become void. A new application
accompanied by full examination fee shall be filed and an updated approval
received before work may commence.
In granting this approval, the City of Oshkosh or its representative does not
hold itself liable for any defects in plans or specification, plan omissions,
examination oversight, construction or any damage that may result in or after
installation and reserves the right to order changes or additions should
conditions arise making this necessary.
It shall be necessary for installing plumber to obtain a plumbing permit from
the City Of Oshkosh before proceeding with actual installation of this plumbing
system or any of its parts.
Sincerely,
MARVIN HIGLEY
Plumbing Supervisor
MH:mr •
P. O. BOX 1130 • OSHKOSH, WISCONSIN 54902