Loading...
HomeMy WebLinkAbout0142050-Building CITY OF OSHKOSH No 142050 OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 515 ANNEX AVE Owner Create Date 07/15/2010 Designer Contractor BRU NICK BUILDERS Category 111 - Single Family Addition Plan Type • Building 0 Sign 0 Canopy 0 Fence O Raze Zoning Class of Const: Size Unfinished /Basement Sq. Ft. Rooms Height Ft. ❑ Projection Finished /Living Sq. Ft. Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use /Nature SFR/ 11' x11' addition* off the rear of the house. All work shall comply with applicable codes. of Work HVAC Contractor THOMPSON HEATING AND COOLING SER\ Plumbing Contractor Electric Contractor SECKAR ELECTRIC CO INC Fees: Valuation $25,000.00 Plan Approval $50.00 Permit Fee Paid $163.00 Park Dedication $0.00 Issued By: (1�7 Date 07/15/2010 Final /O.P. 00 /00 /0000 �' / ❑ Permit Voided Parcel Id # 1208340000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. I have read and unde tan • e afo ntion - • r formation. Signature / % �� %% Date )X 7 1 S (d Agent/Owner Address 1335 WINNEBAGO AVE OSHKOSH WI 54901 - 5334 Telephone Number (920) 426 -4359 To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.