HomeMy WebLinkAbout0141774-Building CITY OF OSHKOSH No 141774
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 1015 BAY SHORE DR Owner WILLIAM M HOLICKY Create Date 06/28/2010
Designer Contractor DEL TRITT CONSTRUCTION LLC
Category 140 - Interior Remodeling Plan
Type • Building Q Sign 0 Canopy 0 Fence Q Raze
1
Zoning Class of Const:
Size
Unfinished /Basement Sq. Ft. Rooms Height Ft. ❑ Projection
Finished /Living Sq. Ft. Bedrooms Stories Canopies
Garage Sq. Ft. Baths Signs
Foundation 0 Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use /Nature SFR/ Interior Remodeling* Gutting laundry room paneling walls and recovering with drywall, replacing interior doors. No structural work.
of Work OK to issue JZ
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $5,500.00 Plan Approval $0.00 Permit Fee Paid $60.00 Park Dedication $0.00
Issued By:*
Date 06/29/2010 Final/O.P. 00/00/0000
❑ Permit Voided Parcel Id # 0805920000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a art
p y, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant
9 p to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
I have read a erstand the afore mentioned information.
Signature (�
Date n
� �7 — /0
Agent/Owner
Address 6228 COUNTY RD N PICKETT WI 54964 - 0000 Telephone Number 589 -4209
To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
performed within y
continue if the inspection is not
P two business days from the time the project is ready.