Loading...
HomeMy WebLinkAbout0141160-BuildingEXISTING • �1 1 m CL o� o EI. �I LAST DESIGN ns- us -ses4 A �- NEW DOXW 00 a* DOWN ---� SBRVICBS 924- 5854445 KRUG RESIDENCE - FAMILY ROOM ADDITION 1150 LAAGER LANE OSHKOSH, WI w M b DATE 249 -1a O JISLOWN FOAM OVER VAPOR i S AM ER s • _ r _ OM VAPOR 400 FAMILY J&Q!2M r C dp ♦ �t t� H s y _♦ r r � • - r -ter • r r ar r TO BE DETRMM. TOP OF FOWATM NAM AT SAME ELEYAWN AS EX*ffM Q C 0 "T O Li LU W LU � J W LO r CA V W CA Every effort has been made in preparing these plan: aid checking them for accuracy but the contractor must check a[i .drninsians and structural details and 0 CA 1/4 2 11 011 VI6" WOOD STRUCTURAL PANEL SHEATHING -ONE SIDE. BLOCK ALL EDGES AND NAIL WITH 8d NAILS AT A "OG ON PANEL EDGES AND 12"OC ON INTERMEDIATE SUPPORTS GYPSUM WALL BOARD TYPI XTERIOR 0 0 TAI WITH CONTIb STEgUCTRUAL PANEL SN VI6" WOOD STRUCTURAL PANEL SHEATHING -ONE SIDE. BLOCK ALL EDGES AND NAIL WITH 8d NAILS AT A "OG ON PANEL EDGES AND 12"OC ON INTERMEDIATE SUPPORTS GYPSUM WALL BOARD TYPI XTERIOR COI&ffR 15R AC ING TAI WITH CONTIb STEgUCTRUAL PANEL SN T14IN z O S O O O w GO. O L NOTES HOLES LARGER THEN Y IN DIAMETER WILL NOT DE ALLOWED IN ANY WALL BRACED WALL PANELS BLOCKING AND BRIDGING AT PARALLEL FLOOR JOIST AND BOX SILL SHALL BE SAME DEPT14 AS FLOOR JOIST 6 V OC W14ERE JOIST ARE PERPENDICULAR TO BRACED WALL. LINE$, BLOCKING SHALL BE PROVIDED TO PERMIT WTENING OF WALL PLATED TO BLOCKWz W 16d MAILS AT 16 "oc CONTINUOUS SWEATHM P ER COMM 2125j)(0) r � LL J Ljj Q L.1 IrA, an q w in y o w CO2 z 0. .� 00 Every effort has been made in preparing these plain and Checking theme for accuracy but the contractor must check all dirninsions and structure detals and be resaonsble for the 'sr e. : 1 / 4" = l'O" a TOP OF POURED FOUNDATION WALL AT SAME ELEVATION AS EXISTING e AUMIN M FASCIA OVER WOW &S FASCIA PERF AUIM SOFFIT WOO ENGINEERED 6I680RS TRUSSES 12 3 FIBEREALASS SHWALES FELT UNDERLAYMENT Irt OW SNEATHNiICs ` 50 GYPSUM BLOWN FOAM - ` , - - OVER VAPOR DIR FCC BATS , " . " BARRIER ' INSULATION BEE SPEMCS) Vr GYP" OVER VAPOR B . 3/4" Trs SNEAMING , a a N V8" I -JOIST CRAWL SP&4Gi VAPOR BARRIER OVER STONE FU GTiQN THRU FAMILY RQQM ?xi STUBS * * OC R-19 Ids iN6t"TION SIDWs TO MATCH EXISTING i E SIZE AID I'aETAL 1 • • 1 Fiii -mamar it iiii i i i i i<i t In i i i i — — i — i i i — — i i i i i no —Owl 1 t 1 . 1 1 t 1 t � t 1 4' UMOGE Ir DOWN t t i t OYPICAU i 1 t i f 1 t , f ' 1 Q j t � t 1 1 t 1 f t 1 1 , 1 1 = 1 1 1 1 1 t 1 # 1 t 1 # 1 � 1 1 e AUMIN M FASCIA OVER WOW &S FASCIA PERF AUIM SOFFIT WOO ENGINEERED 6I680RS TRUSSES 12 3 FIBEREALASS SHWALES FELT UNDERLAYMENT Irt OW SNEATHNiICs ` 50 GYPSUM BLOWN FOAM - ` , - - OVER VAPOR DIR FCC BATS , " . " BARRIER ' INSULATION BEE SPEMCS) Vr GYP" OVER VAPOR B . 3/4" Trs SNEAMING , a a N V8" I -JOIST CRAWL SP&4Gi VAPOR BARRIER OVER STONE FU GTiQN THRU FAMILY RQQM ?xi STUBS * * OC R-19 Ids iN6t"TION SIDWs TO MATCH EXISTING i IM 32^ 1 t t 1 1 f CM ACCESS HOLE INTO EXI6TM WALL LOCATION AND SIZE TO BE DETRMINED. `1 N. p ZXi 4 2X4 TREATED SILL OVER SN L VAL • V ANCHOR BOLTS IO "x48" POURED CONC WALL W/ 4'xlr DROPPED LEDGE ON N r ROD 8t6E"110N 18'x8' POURED COIL FOOT�s � N 7I�B' I�OISt IbITNfA TED T CONC MAM TOI® OF FOIS1DATION MALL AT SAME MYAMOH AS EXISITNCA Every effort has been made in preparng #am p and aCkirg them for accura=U he contractor must check aN tiiminslons and detais and w 1� M l �r Q C> 7_ ..rte Q � Q Q LL. LLJ -� V LiJ W C:) L.J 0 Lo Nc a N as y 0 H y Q � H� CA N 1/4" =1'0 E SIZE AID I'aETAL - - -- —ap i4ft — oft ^i— i-- si— i.--- ii— Y— • • • . i i i i i<i t In i i i i — — i — i i i — — i i i i i no —Owl 1 1 t t t t i i 1 i 1 1 ' 1 1 1 1 / t • 1 1 = IM 32^ 1 t t 1 1 f CM ACCESS HOLE INTO EXI6TM WALL LOCATION AND SIZE TO BE DETRMINED. `1 N. p ZXi 4 2X4 TREATED SILL OVER SN L VAL • V ANCHOR BOLTS IO "x48" POURED CONC WALL W/ 4'xlr DROPPED LEDGE ON N r ROD 8t6E"110N 18'x8' POURED COIL FOOT�s � N 7I�B' I�OISt IbITNfA TED T CONC MAM TOI® OF FOIS1DATION MALL AT SAME MYAMOH AS EXISITNCA Every effort has been made in preparng #am p and aCkirg them for accura=U he contractor must check aN tiiminslons and detais and w 1� M l �r Q C> 7_ ..rte Q � Q Q LL. LLJ -� V LiJ W C:) L.J 0 Lo Nc a N as y 0 H y Q � H� CA N 1/4" =1'0