Loading...
HomeMy WebLinkAbout10-157MAY 11, 2010 10 -157 RESOLUTION (CARRIED 7 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVAL OF CHANGE ORDER NO. 4 FOR PUBLIC WORKS CONTRACT NO. 08 -05 WITH MIRON CONSTRUCTION, INC., FOR WATER FILTRATION PLANT MODIFICATIONS AND DEMOLITION PROJECT ($25,002.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: MIRON CONSTRUCTION CO., INC. PO BOX 509 Neenah, WI 54957 -0509 Net Increase to contract: $25,002.00 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 541-1810-1799-00000 — Water Utility — Construction Work in Progress A=COM AECOM 558 N. Main Street, Oshkosh, Wisconsin 54901 T 920.235.0270 F 920.235.0321 www.aecom.com May 5, 2010 Change Order No. 4 Project: Water Filtration Plant Modifications and Demolition Project Owner: City of Oshkosh Contract: 08 -05 Contractor: Miron Construction Description of Change Change Order No.: Request for Quotation No. (Project Modification No.) 4a: RFQ 21 (PM 045) — Demolish Well -like Structure add $9,131.00 4b: RFQ 35 (PM 044) — Modifications to Manhole 100 add $9,310.00 4c: RFQ 16 (PM 047) — 24" RW Valves L.L.P.S. add $5,658.00 4d: RFQ 34 (PM 043 -1) — L.L.P.S. Backflush Line Valve add $7,691.00 4e: RFQ 36 (PM 048) — Thrust Block & RFI 134 Pipe Removal add $2,090.00 4f: RFQ 39 (PM 052) — RFI 142 - Safety Nosing Elevation Diff. add $203.00 4g: RFQ 38 (PM 050) — Excessive Trench Water Investigation add $3,416.00 4h: PM 051 — RFI 140 Rebar Interference add $671.00 4i: PM 053 — Duct Bank Elevation Credit 4j: RFQ 40 (PM 055) — Revised Fence and Tree Plan 4k: RFQ 41 (PM 056 -1) — Relocate Existing Hand Hole 41: PM 057 — Additional Length of 30" Pipe 4m: RFQ 42 (PM 058 -1) — L.L. Pump Columns Link Seal 4n: PM 059 — RFI 154 Pipe Encasement Removal TOTAL VALUE OF THIS CHANGE ORDER deduct ($24,200.00) deduct ($832.00) add $5,142.00 add $2,920.00 add $1,207.00 add $2,595.00 ADD $25,002.00 Contract Price Adjustment Original Contract Price $6,070,273.00 Previous Change Orders $615,591.52 Adjustments in Contract Price this Change Order $25,002.00 Current Contract Price including this Change Order $6,710,866.52 Contract Duration Adjustment Original Contract Duration (Substantial Completion) 365 days Previous Change Orders 91 days Adjustment to Contract Duration this Change Order 0 days Current Contract Duration including this Change Order 456 days Revised Contract Substantial Completion Date Sept. 26, 2009 This document shall become a supplement to the Contract and all provisions will apply hereto. RECOMMENDED Engineer — CH2M Hill of RPR — AECOM INC Date APPROVED Contractor — Miron Construction Date RECOMMENDED BY OWNER Director of Public Works APPROVED BY OWNER City Manager City Clerk Date Date Date I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin under this Change Order. City Comptroller APPROVED AS TO FORM City Attorney Date Date ( 0 Of HKO H ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Stephan M. Brand, Utilities Superintendent DATE: May 5, 2010 RE: Change Order #4 for Public Works Contract No. 08 -05; Water Filtration Plant Modifications and Demolition Project BACKGROUND Change Order #4 for Contract 08 -05 is scheduled for consideration by the Common Council at the May 11th meeting. This contract was awarded to Miron Construction Co. Inc. of Neenah, WI. on May 27, 2008. These changes are due to site conditions that have been found in the field to be different than, or not shown on existing site plans and opportunities identified during construction that can add value to the project. These prices reflect estimated time and material costs and will be adjusted to reflect the actual cost of the work once it is completed. A final adjustment will be done at the end of the contract on these items. These adjustments will be noted on items where they are being made. The project is approximately 98% complete at this time. ANALYSIS 4a Demolish Well like Structure- This was abandoned in place from old plant structures and needed to be removed to allow for process piping to be installed. 4b Modification to Manhole 100- The cone section of this storm water manhole needed to be replaced to make the proper connection from the Water Filtration Plant storm sewer. 4c 24" RW Valves Low Lift Pump Station — This is additional work related to the installation of the 24" raw water intake valves due to high water in the shore well and the need for additional pumping. 4d Low lift Pump Station Backflush Line Valves- These valves were to be left in place but were in poor condition and not needed so they were removed and replaced with new piping spool pieces. 4e Thrust Block and Pipe Removal — During the removal of a 24 inch line a concrete thrust block was encountered that had to be removed to allow for the installation of the 36 inch line. 4f Safety Nosing Elevation Difference- A yellow safety nosing was included on the bottom concrete step that was added to match the elevation of the existing floor in the low lift pump station. 4g Excess Trench Water Investigation - Excessive water was encountered during the installation of the 30 inch water line and additional excavation was done to try and determine the source. Change Order # 4 for Public Works Contract No. 08 -05; Water Filtration Plant Modifications and Demolition Project Page 2 4h Rebar Interference- Additional rebar was needed in a small area of the Low Lift Pump Station as the result of the reuse of the existing shore well structure under the new building. 4i Ductbank Elevation Credit- This credit is from a section of the electrical ductbank that was constructed with an elevation error by the contractor. This elevation change does not affect the functionality of the ductbank or the drainage in that area. 4j Revised Fence and Tree Plan Credit - The fence location was adjusted and plantings removed. This will allow for revising the site landscaping plan in consultation with the home owners on Washington Ave. 4k Relocate Existing Hand Hole- This existing electrical hand hole for plant yard lighting was relocated because it was close to the edge of the blacktop and could interfere with snow plowing. This also allowed for the replacement of some old cracked conduits. 41 Additional Length of 30" Pipe- The 30" backwash water supply line was extended to move it further away from the building to make it easier to do work in this area in the future. 4m Low Lift Pump Column Linkseals- The original pump shafts in the existing structure were larger than the replacements and linkseals needed to be added. 4n Pipe Concrete Encasement Removal- An existing 30 inch line was encased in concrete at the connection point of the new 30 inch line and the concrete needed to be removed prior to the connection. These changes were reviewed by CH2M Hill our consultant on the project and the costs related to these changes were reasonable based on their experience with similar work. FISCAL IMPACT The estimate for this project was $9,005,950.00.The total project cost including this change order for $25,002.00 is $8,139,940.52 which is $794,007.48 under budget. Funds are available in the 2008 Property Improvements Section (Water Utility Funds) of the Capital Improvement Budget. RECOMMENDATIONS I recommend approval of Change Order # 4 to Contact No. 08 -05 in the amount of $25,002.00 to Miron Construction Co. Inc. Respectfully Submitted, Ste an M. Brand Utilities Superintendent Approved: Mark Rohloff City Manager