HomeMy WebLinkAbout10-156MAY 11, 2010 10 -156 RESOLUTION (CARRIED 7 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE AND SUBMIT WATER PROGRAM ANNUAL REPORT INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the Storm Water Program Annual Report, having been reviewed, is approved, and the proper City officials are authorized and directed to submit the Report to the Department of Natural Resources. ( 0 OIHKOIH ON THE WATER Til Wile] 0 k I Bill N DATE: TO: FROM: RE: BACKGROUND May 6, 2010 Honorable Mayor and Members of the Common Council James E Rabe, Civil Engineer II Wisconsin Department of Natural Resources Municipal Separate Storm Sewer System Annual Report The City of Oshkosh received coverage under the Wisconsin Department of Natural Resources Municipal Separate Storm Sewer System (MS4) General Permit on January 2, 2007. This permit requires the City to comply with the following six minimum control measures (as mandated by the Federal Clean Water Act, and Environmental Protection Agency): 1. Public Information and Education Plan 2. Public Involvement and Participation Program 3. Illicit Discharge Detection and Elimination Program (including new or revised ordinances) 4. Construction Site Pollutant Control Program (including new or revised ordinances) 5. Post - Construction Storm Water Management Program (including new or revised ordinances) 6. Pollution Prevention Program (Prevent pollution from the daily operations of the City) The Storm Water Utility Committee reviewed the Annual Report and recommended approval, with revisions as discussed during the meeting, at their May 6, 2010 meeting. ANALYSIS The annual report contains information on the activities performed by the City of Oshkosh in compliance with the MS4 Permit requirements. This report includes summary outputs from the City's MS4 Permit Tracking Software (ASIST) and a completed DNR form. City staff has more details available for the DNR, should they be requested. FISCAL IMPACT There is no anticipated fiscal impact from the approval of this resolution. RECOMMENDATION Staff recommends approval of the resolution. Respectfully Submitted, James E Rabe Civil Engineer II Approved: Mark A Rohloff City Manager hEngineering\Storm Water Information\MS4 Permit Items\DNR Submittals12009 Annual Report12009 Annual Report Council Memo.doc Stormwater Program report This report covers activities that occurred between the following dates: For questions regarding this report contact: 1/1/2009 to 12/31/2009 .lames Rabe 215 Church Avenue, PO Box 1130 Date Report Prepared: 5/4/2010 Oshkosh, WI 54903 -1130 1. Operator Name: General Information for IVIS4 Ope rator Mark Rohloff 2. Operator Title: City Manager 3. Represented Entity: City of Oshkosh 4. Mailing Address: 215 Church Avenue, PO Box 1130 5. Mail City, State, Zip: Oshkosh, WI 54903 -1130 6. Phone Number: (920) 236 -5000 7. E -Mail Address: Mrohloff @ci.oshkosh.wi.us 8. Co- Permitting With: 9. Population: 62,916 Households: 27,650 jArea (sq mi): 24 10. Official Website: http: / /www.ci.oshkosh.wi.us/ Public Information, Education and Outreach Details of BMPs and Work Performed for Them Responsible Party: James Rabe, Civil Engineer 11 Start Date: 1/1/2008 End Date: 12/31/2008 Has Goal Been Accomplished: YES No activities were scheduled for the BMP listed above during this reporting period Responsible Party: James Rabe, Civil Engineer H Start Date: 1/1/2008 End Date: 12/31/2008 Has Goal Been Accomplished: YES No activities were scheduled for the BMP listed above during this reporting period Responsible Party: James Rabe, Civil Engineer ll Start Date: 1/1/2009 End Date: 12/31/2009 Has Goal Been Accomplished: YES Work performed for the BMP listed above Date: 111312009 Responsible Party: James Rabe, < Unknown> Public Education - 2009 Stormwater Utility Rate Type: Common Council Workshop Event Name: 2009 Stormwater Utility Rate Cost: 0.00 Volunteers: 0 Number Attending: 7 Council Members plus unknown audience in person, on TV and online. Focus: The focus of the presentation was to present information to the Common Council on the funding history, and needs of the Storm Water Utility. Description: Mr. Rabe presented information to the Common Council on the storm water watersheds that have been analyzed, are in the process of being analyzed, and the upcoming schedule of watersheds to be analysed. The presentation focused on the following topics: History of Storm Water Utility Storm Water Management Needs in City of Oshkosh Rate Study conducted for 2009 http:// www. oshkoshcommunitymedia .org /videostreaming_archive.htm Select Oshkosh Common Council under the Government meetings. When the pop up video player comes up, scroll down to 01 -13 -2009. The workshop starts approximately 4 hours and 25 minutes into the video. How was the event sponsored ?: Date: 91112009 Responsible Party: James Rabe, Civil Engineer ll Public Education - Sawyer Creek Watershed Stormwater Management Type: Common Council Workshop Event Name: Sawyer Creek Watershed Stormwater Management Cost: 0.00 Volunteers: 0 Number Attending: 7 Council Members plus unknown audience in person, on TV and online. Focus: Present to the Common Council the options analyzed for the Sawyer Creek Watershed. Discussion as to the inter - reaction of the Sawyer Creek Watershed with the Campbell Creek Watershed. Also discussed was the Water Quality Analysis for the watershed. Description: Mr. Rabe presented information to the Common Council regarding the analysis that has been conducted in the Sawyer Creek Watershed. The topics of discussion included: Sawyer Creek Storm Water Management Plan Review of Campbell Creek Storm Water Management Plan Water Quality Analysis Combined Mitigation Strategies for Sawyer and Campbell Creek Watersheds Future Direction from Common Council hftp://www.oshkoshcommunitymedia.org/videostreaming_archive.htm Select Oshkosh Common Council under the Government meetings. When the pop up video player comes up, scroll down to 09 -01 -2009 Workshop. The workshop starts at the begining of the video. How was the event sponsored ?: Responsible Party: James Rabe, Civil Engineer H Start Date: 1/1/2009 End Date: 12/31/2009 Has Goal Been Accomplished: YES Work performed for the BMP listed above Date: 212/2009 Responsible Party: James Rabe, Civil Engineer 11 Education - - Contractor Audience: 2 Program Name: Contract 08 -01 Ground Control Conference Cost: 0.00 Audience Reached: 2 Focus: Erosion and Sediment Control for City of Oshkosh Contract 08 -01 Sanitary Sewer Interceptor. Description: Mr. Rabe introduced Laura Gray and Kris Lyons as the Erosion Control Inspectors for the City of Oshkosh for this project_ The City of Oshkosh will be performing the weekly and rainfall event inspections as required by the DNR Construction Site Permit. The primary contacts for the Contractor were identified. The City Inspectors will fax all inspection forms and maintenance orders to those contacts. Group watched the Excal Video "Ground Control ". Mr. Rabe then walked through the plans with the Contractors. The purpose of the plan walk through was to discuss the locations where erosion and sediment control practices are shown in the plans and what is expected by the City from the contractor. Date: 213 12009 Responsible Party: James Rabe, Civil Engineer 11 Education - - Contractor Audience: 3 Program Name: Contract 09 -02 Ground Control Conference Cost: 0.00 Audience Reached: 3 Focus: Erosion and Sediment Control for City of Oshkosh Contract 09 -02 Sawyer Creek Sanitary Sewer Interceptor. Description: Mr. Rabe introduced Laura Gray and Kris Lyons as the Erosion Control Inspectors for the City of Oshkosh for this project. The City of Oshkosh will be performing the weekly and rainfall event inspections as required by the DNR Construction Site Permit. The primary contacts for the Contractor were identified. The City Inspectors will fax all inspection forms and maintenance orders to those contacts. Group watched the Excal Video "Ground Control ". Mr. Rabe then walked through the plans with the Contractors. The purpose of the plan walk through was to discuss the locations where erosion and sediment control practices are shown in the plans and what is expected by the City from the contractor. Date: 41812009 Responsible Party: James Rabe, Civil Engineer ll Education - - Contractor Audience: 9 Program Name: Contract 09 -03 and 09 -05 Ground Control Conference Cost: 0.00 Audience Reached: 9 Focus: Erosion and Sediment Control for City of Oshkosh Contract 09 -03 USH 41 Utilities South of Lake Butte des Mortes, and City of Oshkosh Contract 09 -05 USH 41 Utilities north of Lake Butte des Mortes. Description: Mr. Rabe introduced Laura Gray and Kris Lyons as the Erosion Control Inspectors for the City of Oshkosh for these projects. The City of Oshkosh will be performing the weekly and rainfall event inspections as required by the DNR Construction Site Permit. The primary contacts for the Contractor were identified. The City Inspectors will fax all inspection forms and maintenance orders to those contacts. Group watched the Excal Video "Ground Control ". Mr. Rabe then walked through the plans with the Contractors. The purpose of the plan walk through was to discuss the locations where erosion and sediment control practices are shown in the plans and what is expected by the City from the contractor. Date: 411612009 Responsible Party: James Rabe, Civil Engineer 9 Education - - Contractor Audience: 3 Program Name: Contract 09 -04 Ground Control Conference Cost: 0.00 Audience Reached: 3 Focus: Erosion and Sediment Control for City of Oshkosh Contract 08 -04 Paving and Utility Work. Description: Mr. Rabe introduced Laura Gray and Kris Lyons as the Erosion Control Inspectors for the City of Oshkosh for this project. The City of Oshkosh will be performing the weekly and rainfall event inspections as required by the DNR Construction Site Permit. The primary contacts for the Contractor were identified. The City Inspectors will fax all inspection forms and maintenance orders to those contacts. Group watched the Excal Video "Ground Control ". Mr. Rabe then walked through the plans with the Contractors. The purpose of the plan walk through was to discuss the locations where erosion and sediment control practices are shown in the plans and what is expected by the City from the contractor. Responsible Party: James Rabe, Civil Engineer ll Start Date: 1/1/2010 End Date: 12/31/2010 Has Goal Been Accomplished: No activities were scheduled for the BMP listed above during this reporting period Responsible Party: James Rabe, Civil Engineer ll Start Date: 1/1/2011 End Date: 12/31/2011 Has Goal Been Accomplished: No activities were scheduled for the B'MP listed above during this reporting period Responsible Party: James Rabe, Civil Engineer H Start Date: 1/2/2007 End Date: 12/31/2011 Has Goal Been Accomplished: No activities were scheduled for the BMP listed above during this reporting period Responsible Party: James Rabe, Civil Engineer H Start Date: 1/2/2007 End Date: 12/31/2011 Has Goal Been Accomplished: NO Work performed for the. BMP listed above Date: 21912009 Responsible Party: James Rabe, Civil Engineer H 02 -09 -2009 Full Membership Meeting Attend Full Membership Meeting Date: 511112009 Responsible Party: James Rabe, Civil Engineer 11 05 -11 -2009 Full Membership Meeting Attend Full Membership Meeting Date: 811012009 Responsible Party: James Rabe, Civil Engineer 11 08 -10 -2009 Full Membership Meeting Attend Full Membership Meeting Date: 111912009 Responsible Party: James Rabe, Civil Engineer 11 11 -09 -2009 Full Membership Meeting Attend Full Membership Meeting Responsible Party: James Rabe, Civil Engineer 11 Start Date: 1/2/2007 End Date: 12/31/2011 Has Goal Been Accomplished: No activities were scheduled for the BMP listed above during this reporting period 8 Responsible Party: James Rabe, Civil Engineer H Start Date: 1/2/2007 End Date: 12/31/2011 Has Goal Been Accomplished: Work performed for the BMP listed above J Date: 41812009 Responsible Party: James Rabe, Civil Engineer H Public Education - League of Women Voters Presentation Type: Public Information Meeting Event Name: League of Women Voters Presentation Cost: 0.00 Volunteers: 0 Number Attending: 19 Focus: Mr. Rabe presented information on the City of Oshkosh storm water program. Description: Mr. Rabe presented information regarding the overall storm water management program within the City of Oshkosh. Topics included: Storm Water Quality (DNR Permit Requirements) Storm Water Quantity (Completed Projects, Ongoing Studies, Upcoming Studies) How was the event sponsored ?: Date: 51712009 Responsible Party: James Rabe, Civil Engineer 11 Public Education - West Side Association Presentation Type: Public Information Meeting Event Name: West Side Association Presentation Cost: 0.00 Volunteers: 0 Number Attending: 14 Focus: Mr. Rabe presented information on the City of Oshkosh storm water program. Description: Mr. Rabe presented information regarding the overall storm water management program within the City of Oshkosh. Topics included: Storm Water Quality (DNR Permit Requirements) Storm Water Quantity (Completed Projects, Ongoing Studies, Upcoming Studies) How was the event sponsored? Date: 911512009 Responsible Party: James Rabe, Civil Engineer ll Public Education - Sawyer Creek Storm Water Management Plan Type: Public Information Meeting Event Name: Sawyer Creek Storm Water Management Plan Cost: 0.00 Volunteers: 0 Number Attending: 25 Focus: Present to the General Public the options analyzed for the Sawyer Creek Watershed. Discussion as to the inter - reaction of the Sawyer Creek Watershed with the Campbell Creek Watershed. Also discussed was the Water Quality Analysis for the watershed. Description: Mr. Rabe presented information to the General Public present regarding the analysis that has been conducted in the Sawyer Creek Watershed. The topics of discussion included: Sawyer Creek Storm Water Management Plan Review of Campbell Creek Storm Water Management Plan Water Quality Analysis Combined Mitigation Strategies for Sawyer and Campbell Creek Watersheds Future Direction from Common Council http:// www. oshkoshcommunitymedia .org /videostreaming_archive.htm Select Stormwater Management Public Info Meeting 09/15/09 under Public Affairs and Specials. How was the event sponsored ?: 10 Date: 911712009 Responsible Party: James Rabe, Civil Engineer Il Public Education - Sawyer Creek Storm Water Management Plan Type: Public Information Meeting Event Name: Sawyer Creek Storm Water Management Plan Cost: 0.00 Volunteers: 0 Number Attending: 17 Focus: Present to the General Public the options analyzed for the Sawyer Creek Watershed. Discussion as to the inter - reaction of the Sawyer Creek Watershed with the Campbell Creek Watershed. Also discussed was the Water Quality Analysis for the watershed. Description: Mr. Rabe presented information to the General Public present regarding the analysis that has been conducted in the Sawyer Creek Watershed. The topics of discussion included: Sawyer Creek Storm Water Management Plan Review of Campbell Creek Storm Water Management Plan Water Quality Analysis Combined Mitigation Strategies for Sawyer and Campbell Creek Watersheds Future Direction from Common Council http://www.oshkoshcommunitymedia.org/videostreaming_archive.htm Select Stormwater Management Public Info Meeting 09/17/09 under Public Affairs and Specials. How was the event sponsored ?: Date: 1211412009 Responsible Party: James Rabe, Civil Engineer H Public Education - Melvin Avenue Storm Water Management Type: Public Information Meeting Event Name: Melvin Avenue Storm Water Management Cost: 0.00 Volunteers: 0 Number Attending: 78 Focus: Present options for managing storm water within the Melvin Avenue Watershed. Description: Mr. Rabe presented information to the General Public present regarding the analysis that has been conducted in the Melvin Avenue Watershed. The topics of discussion included: Watershed Characteristics Design Standards Alternatives Analyzed (Conveyance Upgrades, Detention, Pumping) Performance in Larger Storm Events Summary Discussion How was the event sponsored ?: 11 Public Participation and Involvement Details of BMPs and Work Performed for Them Responsible Party: James Rabe, Civil Engineer ll Start Date: 1/1/2009 End Date: 12/31/2009 Has Goal Been Accomplished: NO No activities were scheduled for the BMP listed above during this reporting period Responsible Party: James Rabe, Civil Engineer 1l Start Date: 5/27/2008 End Date: 12/31/2011 Has Goal Been Accomplished: NO Work p erform ed for t he BMP listed above Date: 1213112009 Responsible Party. James Rabe, Civil Engineer H 2009 Maintain City Storm Water Website Mr. Rabe works with Jason Kunkle (Information Technology) throughout the year to post pertinent information to the City of Oshkosh Storm Water Website. Responsible Party: James Rabe, Civil Engineer 11 Start Date: 1/1/2007 End Date: 12/31/2010 Has Goal Been Accomplished: NO Work performed for the BMP listed above M Date: 41812009 Responsible Party: James Rabe, Civil Engineer ll Public Education - League of Women Voters Presentation Type: Public Information Meeting Event Name: League of Women Voters Presentation Cost: 0.00 Volunteers: 0 Number Attending: 19 Focus: Mr. Rabe presented information on the City of Oshkosh storm water program. Description: Mr. Rabe presented information regarding the overall storm water management program within the City of Oshkosh. Topics included: Storm Water Quality (DNR Permit Requirements) Storm Water Quantity (Completed Projects, Ongoing Studies, Upcoming Studies) How was the event sponsored ?: Date: 51712009 Responsible Party: James Rabe, Civil Engineer 11 Public Education - West Side Association Presentation Type: Public Information Meeting Event Name: West Side Association Presentation Cost: 0.00 Volunteers: 0 Number Attending: 14 Focus: Mr. Rabe presented information on the City of Oshkosh storm water program. Description: Mr. Rabe presented information regarding the overall storm water management program within the City of Oshkosh. Topics included: Storm Water Quality (DNR Permit Requirements) Storm Water Quantity (Completed Projects, Ongoing Studies, Upcoming Studies) How was the event sponsored ?: Responsible Party: James Rabe, Civil Engineer 11 Start Date: 1/1/2007 End Date: 12/31/2010 Has Goal Been Accomplished: NO Work performed for the BMP listed above 13 Date: 911512009 Responsible Party: James Rabe, Civil Engineer 11 Public Education - Sawyer Creek Storm Water Management Plan Type: Public Information Meeting Event Name: Sawyer Creek Storm Water Management Plan Cost: 0.00 Volunteers: 0 Number Attending: 25 Focus: Present to the General Public the options analyzed for the Sawyer Creek Watershed. Discussion as to the inter - reaction of the Sawyer Creek Watershed with the Campbell Creek Watershed. Also discussed was the Water Quality Analysis for the watershed. Description: Mr. Rabe presented information to the General Public present regarding the analysis that has been conducted in the Sawyer Creek Watershed. The topics of discussion included: Sawyer Creek Storm Water Management Plan Review of Campbell Creek Storm Water Management Plan Water Quality Analysis Combined Mitigation Strategies for Sawyer and Campbell Creek Watersheds Future Direction from Common Council hftp:/twww.oshkoshcommunitymedia.org/videostreaming_archive.htm Select Stormwater Management Public Info Meeting 09/15/09 under Public Affairs and Specials. How was the event sponsored ?: 14 Date: 911712009 Responsible Party: James Rabe, Civil Engineer H Public Education - Sawyer Creek Storm Water Management Plan Type: Public Information Meeting Event Name: Sawyer Creek Storm Water Management Plan Cost: 0.00 Volunteers: 0 Number Attending: 17 Focus: Present to the General Public the options analyzed for the Sawyer Creek Watershed. Discussion as to the inter- reaction of the Sawyer Creek Watershed with the Campbell Creek Watershed. Also discussed was the Water Quality Analysis for the watershed. Description: Mr. Rabe presented information to the General Public present regarding the analysis that has been conducted in the Sawyer Creek Watershed. The topics of discussion included: Sawyer Creek Storm Water Management Plan Review of Campbell Creek Storm Water Management Plan Water Quality Analysis Combined Mitigation Strategies for Sawyer and Campbell Creek Watersheds Future Direction from Common Council http:// www. oshkoshcommunitymedia .org /videostreaming_archive.htm Select Stormwater Management Public Info Meeting 09/17/09 under Public Affairs and Specials. How was the event sponsored ?: ■P Date: 1211412009 Responsible Party: James Rabe, Civil Engineer ll Public Education - Melvin Avenue Storm Water Management Type: Public Information Meeting Event Name: Melvin Avenue Storm Water Management Cost: 0.00 Volunteers: 0 Number Attending: 78 Focus: Present options for managing storm water within the Melvin Avenue Watershed. Description: Mr. Rabe presented information to the General Public present regarding the analysis that has been conducted in the Melvin Avenue Watershed. The topics of discussion included: Watershed Characteristics Design Standards Alternatives Analyzed (Conveyance Upgrades, Detention, Pumping) Performance in Larger Storm Events Summary Discussion How was the event sponsored ?: Responsible Party: James Rabe, Civil Engineer H Start Date: 1/1/2007 End Date: 12/31/2010 Has Goal Been Accomplished: NO No activities were scheduled for the.BMP listed above during this reporting period Responsible Party: James Rabe, Civil Engineer l/ Start Date: 1/1/2008 End Date: 7/2/2009 Has Goal Been Accomplished: NO No activities were scheduled for the BMP listed above during this reporting period Responsible Party: James Rabe, Civil Engineer lI Start Date: 1/1/2007 End Date: 12/30/2010 Has Goal Been Accomplished: NO Work performed for the BMP listed above Ell Date: 111612009 Responsible Party: James Rabe, Civil Engineer 11 01 -16 -2009 Committee Meeting Committee meeting in Room 404 of City Hall. Date: 211812009 Responsible Party: James Rabe, Civil Engineer Il 02 -18 -2009 Committee Meeting Committee meeting in Room 404 of City Hall. Date: 311812009 Responsible Party: James Rabe, Civil Engineer 11 03 -18 -2009 Committee Meeting Committee meeting in Room 404 of City Hall. Date: 512712009 Responsible Party: James Rabe, Civil Engineer 11 05 -27 -2009 Committee Meeting Committee meeting in Room 404 of City Hall. Date: 811212009 Responsible Party: James Rabe, Civil Engineer 11 08 -12 -2009 Committee Meeting Committee meeting in Room 404 of City Hall. Date: 101812009 Responsible Party: James Rabe, Civil Engineer 11 10 -08 -2009 Committee Meeting Committee meeting in Room 310 of City Hall. Date: 1111912009 Responsible Party: James Rabe, Civil Engineer 11 11 -19 -2009 Committee Meeting Committee meeting in Room 404 of City Hall. IVA Illicit Discharge Detection and Elimination Details of BMPs and Work Performed for Them Responsible Party: James Rabe, Civil Engineer 11 Start Date: 1/2/2007 End Date: 12/31/2007 Has Goal Been Accomplished: YES No activities were scheduled for the BMP listed above during this reporting period Responsible Party: James Rabe, Civil Engineer H Start Date: 1/2/2007 End Date: 12/31/2007 Has Goal Been Accomplished: YES No a c t ivi t i es were s che du led for the BMP liste abo during this reporting p Responsible Party: James Rabe, Civil Engineer lI Start Date: 1/1/2008 End Date: 12/31/2008 Has Goal Been Accomplished: YES No activities were scheduled for the BMP listed above during this reporting period Responsible Party: James Rabe, Civil Engineer H Start Date: 1/1/2008 End Date: 12/31/2008 Has Goal Been Accomplished: YES No activities were scheduled for the BMP listed above during this reporting period' Responsible Party: James Rabe, Civil Engineer II Start Date: 1/1/2009 End Date: 12/31/2009 Has Goal Been Accomplished: YES Work performed for the !BMP listed above Date: 9 12012009 Responsible Party: James Rabe, Civil Engineer 1l 01 -20 -2009 Committee Meeting Attend NEWSC Illicit Discharge Committee Meeting. 18 Date: 211612009 Responsible Party: James Rabe, Civil Engineer ll 02 -16 -2009 Committee Meeting Attend NEWSC Illicit Discharge Committee Meeting. Responsible Party: James Rabe, Civil Engineer 11 Start Date: 1/1/2009 End Date: 12/31/2009 Has Goal Been Accomplished: YES Wo p erformed for the BMP listed above Date: 1213112009 Responsible Party: James Rabe, Civil Engineer ll Outfall Inspection Summary Report See separately attached Outfall Inspection Summary. The construction site and post construction storm water management site plan reviews are combined in a single report. Responsible Party: James Rabe, Civil Engineer 11 Start Date: 1/2/2007 End Date: 12/31/2009 Has Goal Been Accomplished: NO Work pe r fo rmed frpr the BMP listed above Date: 71112009 Responsible Party: James Rabe, Civil Engineer 11 Refine Ordinance Through Inter - Departmental Meetings Meet with other City of Oshkosh Departments to refine the Draft Illicit Discharge Ordinance to ensure other code sections are not being contradicted. These meetings will also facilitate response and communication procedures. 19 Construction Site Pollution Control Details of BMPs and Work Performed for Them Responsible Party: Laura Gray, Civil Engineer I Start Date: 1/1/2007 End Date: 12/31/2007 Has Goal Been Accomplished: YES No activities were scheduled for the BMP listed above during this reporting period Responsible Party: James Rabe, Civil Engineer 11 Start Date: 1/2/2007 End Date: 12131/2007 Has Goal Been Accomplished: YES No activities were sched fo r t BLI listed above during this reporting period Responsible Party: Laura Gray, Civil Engineer I Start Date: 1/1/2008 End Date: 12/31/2008 Has Goal Been Accomplished: YES No activities were scheduled for the BMP U above during this reporting period Responsible Party: James Rabe, Civil Engineer 11 Start Date: 1/1/2008 End Date: 12/31/2008 Has Goal Been Accomplished: YES No activities were scheduled for the BMP listed above during this reporting Period ; Responsible Party: Laura Gray, Civil Engineer l Start Date: 1/1/2009 End Date: 12/31/2009 Has Goal Been Accomplished: YES Work performed for the BMP listed above Date: 1213912009 Responsible Party: Laura Gray, Civil Engineer I 2009 Construction Site Plan Reviews See separately attached Site Plan Review Summary. The construction site and post construction storm water management site plan reviews are combined in a single report. 20 Responsible Party: James Rabe, Civil Engineer 11 Start Date: 1/1/2009 End Date: 12/31/2009 Has Goal Been Accomplished: Work performed for the BMP listed above Date: 1/27/2009 Responsible Party: James Rabe, Civil Engineer 1l 01 -27 -2009 Committee Meeting Attend NEWSC Erosion Control and Storm Water Management Committee Meeting. Date: 31312009 Responsible Party: James Rabe, Civil Engineer It 03 -03 -2009 Committee Meeting Attend NEWSC Erosion Control and Storm Water Management Committee Meeting. Date: 411412009 Responsible Party: James Rabe, Civil Engineer 11 04 -14 -2009 Committee Meeting Attend NEWSC Erosion Control and Storm Water Management Committee Meeting. Date: 912312009 Responsible Party: James Rabe, Civil Engineer Il 09 -23 -2009 Committee Meeting Attend NEWSC Erosion Control and Storm Water Management Committee Meeting. Date: 1012112009 Responsible Party: James Rabe, Civil Engineer H 10 -21 -2009 Committee Meeting Attend NEWSC Erosion Control and Storm Water Management Committee Meeting. Date: 1111712009 Responsible Party: James Rabe, Civil Engineer H 11 -17 -2009 Committee Meeting Attend NEWSC Erosion Control and Storm Water Management Committee Meeting. 21 Post - Construction Site Storm Management Details of BMPs and Work Performed for Them Responsible Party: Laura Gray, Civil Engineer l Start Date: 1/1/2007 End Date: 12/31/2007 Has Goal Been Accomplished: YES No activities were scheduled for the BMP listed above during this reporting period Responsible Party: James Rabe, Civil Engineer H Start Date: 1/2/2007 End Date: 12131/2007 Has Goal Been Accomplished: YES No activities were scheduled for the BMP listed above during this reporting period Responsible Party: Laura Gray, Civil Engineer I Start Date: 1/1/2008 End Date: 12/31/2008 Has Goal Been Accomplished: YES No activities were scheduled for the, B'MR linked above during, this reporting period Responsible Party: James Rabe, Civil Engineer Il Start Date: 1/1/2008 End Date: 12/31/2008 Has Goal Been Accomplished: YES No activities were scheduled f rthe BMP listed above during this reporting period Responsible Party: Laura Gray, Civil Engineer I Start Date: 1/1/2009 End Date: 12/31/2009 Has Goal Been Accomplished: YES No activities were scheduled for the BMP listed above during this reporting period Responsible Party: James Rabe, Civil Engineer Il Start Date: 3/17/2010 End Date: 3/18/2010 Has Goal Been Accomplished: YES 22 Work performed for the BMP fisted above Date: 912712009 Responsible Party: James Rabe, Civil Engineer 1l 01 -27 -2009 Committee Meeting Attend NEWSC Erosion Control and Storm Water Management Committee Meeting. Date: 31312009 Responsible Party: James Rabe, Civil Engineer 11 03 -03 -2009 Committee Meeting Attend NEWSC Erosion Control and Storm Water Management Committee Meeting. Date: 419412009 Responsible Party: James Rabe, Civil Engineer 1l 04 -14 -2009 Committee Meeting Attend NEWSC Erosion Control and Storm Water Management Committee Meeting. Date: 912312009 Responsible Party: James Rabe, Civil Engineer 11 09 -23 -2009 Committee Meeting Attend NEWSC Erosion Control and Storm Water Management Committee Meeting. Date: 9012912009 Responsible Party: James Rabe, Civil Engineer 11 10 -21 -2009 Committee Meeting Attend NEWSC Erosion Control and Storm Water Management Committee Meeting. Date: 9919712009 Responsible Party: James Rabe, Civil Engineer 11 11 -17 -2009 Committee Meeting Attend NEWSC Erosion Control and Storm Water Management Committee Meeting. 23 Pollution Prevention Details of BMPs and Work Performed for Them Responsible Party: Kevin Uhen, Streets Superintendent Start Date: 1/2/2007 End Date: 12/31/2011 Has Goal Been Accomplished: NO Work performed for the BMP listed above Date: 1213112009 Responsible Party: Kevin Uhen, Streets Superintendent 2009 Catch Basin Cleaning 1,763.5 hours worth of catch basin cleaning performed. Responsible Party: James Rabe, Civil Engineer ll Start Date: 1/2/2007 End Date: 12/31/2011 Has Goal Been Accomplished: YES Responsible Party: Kevin Uhen, Streets Superintendent Start Date: 1/2/2007 End Date: 12/31/2011 Has Goal Been Accomplished: NO Work performed for the BMP listed above 1 Date: 1213112009 Responsible Party: Kevin Uhen, Streets Superintendent 2009 Salt Truck Calibration Road Salt Application Trucks were calibrated in the summer during routine preventative maintenance. Responsible Party: Kevin Uhen, Streets Superintendent Start Date: 1/2/2007 End Date: 12/31/2011 Has Goal Been Accomplished: NO Work performed for the BMP listed above Date: 1213112009 Responsible Party: Kevin Uhen, Streets Superintendent 2009 Street Sweeping 17,722 curb miles of street sweeping performed. 24 Responsible Party: Steve Brand, Superintendent of Utilities Start Date: 1/2/2007 End Date: 12/31/2011 Has Goal Been Accomplished: NO Work performed for the BMP listed above Date: 2 1612009 Responsible Party: Steve Brand, Superintendent of Utilities Notice of No Exposure Mr. Brand recieves Certification of No Exposure Status from DNR. F4.1 Storm Water Quality Management Details of BIVIPs and Work Performed for Them Responsible Party: James Rabe, Civil Engineer I/ Start Date: 1/1/2007 End Date: 12/30/2008 Has Goal Been Accomplished: YES No activities were scheduled for the B listed above during this reporting period Responsible Party: James Rabe, Civil Engineer H Start Date: 1/1/2007 End Date: 12/30/2008 Has Goal Been Accomplished: YES No activities ,were scheduled for the BIVIP listed above during this reporting period Responsible Party: James Rabe, Civil Engineer I/ Start Date: 1/2/2007 End Date: 12/30/2013 Has Goal Been Accomplished: NO No activities were scheduled for the BMP listed above during this reporting ,period 26 Storm Sewer System Map Details of BMPs and Work Performed for Them Responsible Party: Kris Lyons, CET Draftsperson Start Date: 1/112009 End Date: 1/29/2010 Has Goal Been Accomplished: YES Work performed for the BMP listed above Date: 1213112009 Responsible Party: Kris Lyons, CET Draftsperson Update Outfall Map Complete 2009 Map Updates. Date: 1213112009 Responsible Party: Kris Lyons, CET Draftsperson Update Public Facilities Map Complete 2009 Map Updates. Date: 1213112009 Responsible Party: Kris Lyons, CET Draftsperson Update Storm Sewer System Map Complete 2009 Map Updates. Responsible Party: Kris Lyons, CET Draftsperson Start Date: 1/1/2010 End Date: 12/31/2010 Has Goal Been Accomplished: No activities were scheduled for the BMP listed above during this reporting period Responsible Party: Kris Lyons, CET Draftsperson Start Date: 1/3/2011 End Date: 12/30/2011 Has Goal Been Accomplished: No activities were scheduled for the BMP listed above during this reporting period Responsible Party: Kris Lyons, CET Draftsperson Start Date: 1/2/2007 End Date: 12/31/2008 Has Goal Been Accomplished: YES No activities were scheduled for the BMP listed above during this reporting period 27 Overview of Construction site inspection program (Information in this report is for the dates listed below) Start Date: 1/1/2009 End Date: 12/31/2009 Summary of Projects Number of Projects started during reporting period 35 Number of Projects continuing from previous period into reporting period 43 Number of Projects completed during reporting period 84 Number of Plan Reviews performed during reporting period 63 Time (hours) spent on Plan Reviews during reporting period* 188.75 Number of Projects with Privately owned Runoff Controls 12 Summary of Inspections Performed Number of Projects inspected during reporting period 72 Percentage of Projects inspected during reporting period 53.3% Number of Projects with Enforcement Actions during reporting period 158 Total Number of Enforcement Actions during reporting period 172 Time (hours) spent performing Inspections during reporting period* 241.05 * Time spent was not tracked by the reporting software for entire reporting period, so actual time spent on plan reviews and inspections is higher than reported. Future years will be more accurately reported. Overview of Outfall inspection program (Information in this report is for the dates listed below) Start Date: 1/1/2009 End Date: 12/31/2009 Outfalls listed in inventory: 185 Outfalls inspected during reporting period: 184 Percentage of outfalls inspected: 99.5% Summary of inspection results during reporting period: Inspections where a flow was observed: 39 Percentage of inspections with a flow 21.2% Inspections where debris was observed: 0 Percentage of inspections with debris .0% Total time expended performing inspections: 46 hours, 15 minutes Reported cost of inspections performed *: $ 4,336.97 Summary of illicit discharge results during reporting period: Illicit discharges uncovered: 0 Illicit discharges noted as hazardous: 0 Enforcement actions taken: 0 Illicit discharges currently unresolved: 0 Total time expended tracking illicit 0 Reported cost of illicit discharge inspections *: $ 0.00 Summary of work order activity during reporting period: Work orders initiated: 0 Work orders still outstanding: 0 Summary of sampling activity during reporting period: Total samples collected: 0 Outfalls sampled: 0 Samples with at least one parameter exceeding threshold: 0 * Inspection costs are only calculated for inspections performed by inspectors who have their hourly rates noted in the Contacts list. Consequently the total cost may be higher than the cost noted. Illicit Discharge Call - 399 E Fernau Avenue General Information Call Received By: James Rabe Date Received: 5/5/2009 Applies To: Outfall Time Received: 3:40:00 PM Complainant Name: Chuck Nahn Complainant Address: Unknown Description: Chuck was performing the Initial Field Screening for the Town of Oshkosh, and noticed a milky white discharge at City of Oshkosh Outfall 15 -1248. Date of Mr. Nahn's field investigation unknown. Phone call was received at least several days after noticing discharge. Investigation Required: YES Priority Status: High Call Status: CLOSED Date Closed: 10/31/2009 Field Inspections Primary Inspector: James Rabe Inspection Date: 5/12/2009 Secondary Inspector: Inspection Time: 11:03:00 AM Weather Condition: Clear Inpsection Duration: 45 Responsible Party: Unknown RP Notified: NO Date Notified: Discharge Stopped ?: NO Date Stopped: Hazardous: Corrective Actions: NO Inspection Result: Pass Notes: Mr. Rabe visited the site with Mr. Nahn, Mr. Jim Erdman (Town of Oshkosh Chairman), and Mr. Jim Savinski (WDNR). One the day of the visit, there was no discharge evident. After much review and discussion, Mr. Savinski asked for a list of properties draining to this outfall, so that he could review for any potential dischargers. Mr. Rabe provided that information to Mr. Savinski. As there was no discharge present on the day of the field visit, there was nothing further that could be done, and the call was considered closed after forwarding the parcel information to Mr. Savinski. This outfall is a major outfall, so it will be screened again as a part of the City of Oshkosh Initial Field Screening. Annual Report under MS4 General Permit No. WI- 5050075 -1 Form 3400 -195 (R01/2010) Page 1 State of Wisconsin Department of Natural Resources dnr.wi.gov Due by March 31, 2010 This form is for the purpose of annual reporting on activities undertaken pursuant to the Municipal Separate Storm Sewer System (MS4) General Permit No. WI- S050075 -1. An owner or operator of a municipal separate storm sewer system covered by the general permit under Chapter NR 216, Wis. Adm. Code, is required to submit an annual report to the Department of Natural Resources by March 31 of each year to report on activities for the previous calendar year. This form is for reporting on activities undertaken in calendar year 2009. In addition, this form serves as the owner or operator's reapplication for permit coverage as required under s. NR 216.09, Wis. Adm. Code. Use of this specific form is optional. The Department of Natural Resources has created this form for the user's convenience and believes that the information requested on this form meets the reporting and reapplication requirements for an owner or operator of a municipal separate storm sewer system covered by the general permit. Instructions: Complete each section of the form that follows. If additional space is needed to respond to a question, attach additional pages. Provide descriptions that explain the program actions taken to -date to comply with the general permit. Complete and submit the annual report by March 31, 2010, to the appropriate address indicated on the last page of this form. Name of Municipality City of Oshkosh City Oshkosh Mailing Address City State Postal Code 215 Church Avenue Oshkosh WI 54903 -1130 PO Box 1130 County(s) in which Municipality is located Type of Municipality: (check one) Winnebago ❑ County ® City ❑ Village ❑ Town ❑ Other (specify) Name of Municipal Contact Person James Rabe, PE, CPESC Mailing Address 215 Church Avenue PO Box 1130 E -mail Address jrabe @ci.oshkosh.wi.us Telephone No. (including area code) 920 - 236 -5065 1 hereby certify that I am an authorized representative of the municipality covered under MS4 General Permit No. WI- S050075 -1 for which this annual report is being submitted and that the information contained in this document and all attachments were gathered and prepared under my direction or supervision. Based on my inquiry of the person or persons under my direction or supervision involved in the preparation of this document, to the best of my knowledge, the information is true, accurate, and complete. /further certify that the municipality's governing body or delegated representatives have reviewed or been apprised of the contents of this annual report. /understand that Wisconsin law provides severe penalties for submitting false information. Authorized Representative Printed Name Mark Rohloff Authorized Representative Title City Manager Authorized Representative Signature E -mail Address mrohloff@ci.oshkosh.wi.us Date Signed Facility ID No. (FIN) 31078 Title Civil Engineer II State Postal Code WI 1 54903 -1130 Fax No. (including area code) 920 - 236 -5068 Telephone No. (including area ( Fax No. (including area code) code) 920 - 236 -5000 Annual Report under MS4 General Permit No. WI- S050075 -1 Form 3400 -195 (R01/2010) Page 2 a. Describe what efforts the municipality has undertaken to invite the municipal governing body, interest groups, and the general public to review and comment on the annual report. The Annual Report has been posted on the City's Storm Water Utility Webpage, and has been reviewed and approved at public meetings of the Storm Water Utilility Committee and the Common Council. The general public, in addition to members of interest groups and the elected official have the opportunity to comment at any of these meetings, as well as arrange a meeting with the Department of Public Works staff to discuss comments. b. Describe how elected and municipal officials and appropriate staff have been kept apprised of the municipal storm water discharge permit and its requirements. Elected officials are kept apprised of the MS4 Permit and it's requirements through Common Council workshops. Staff are kept apprised during routine conversations and staff meetings when necessary. c. Has the municipality prepared its own municipal -wide storm water management plan? ® Yes ❑ No If yes, title and date of storm water management plan: City of Oshkosh Citywide Stormwater Management PLan and Ordinance Development - December 2008 d. Has the municipality entered into a written agreement with another municipality or a contract with another entity to perform one or more of the conditions of the general permit as provided under Section 2.10 of the general permit? ❑ Yes ® No If yes, describe these cooperative efforts: e. Does the municipality have an internet website? ® Yes ❑ No If yes, provide web address: www.ci.oshkosh.wi.us If the municipality has an internet website, is there current information about or links provided to the MS4 general permit and /or the municipality's storm water management program? ® Yes ❑ No If yes, provide web address: www.ci.oshkosh.wi.us/Public—Works/Storm—Water—Utility.htm Annual Report under MS4 General Permit No. WI- S050075 -1 Form 3400 -195 (R01/2010) Page 3 u ;. w 3 a ..x.... ygs ,mm!tim 7777 7'= "r. , irk 1... �y. �- i ;•.?. a. Minimum Control Measures For each of the permit conditions listed below, provide a description of the status of implementation of program elements, the status of meeting measurable goals, and compliance with permit schedule in section 3 of the MS4 general permit. Be specific in describing the actions that have been taken during the reporting year to implement each permit condition and whether measurable goals have been met, including any data collected to document a measurable goal. Also, explain the reasons for any variations from the compliance schedule in the MS4 general permit. • Public Education and Outreach See attached summary report. Public Involvement and Participation See attached summary report. • Illicit Discharge Detection and Elimination See attached summary report. • Construction Site Pollutant Control See attached summary report. • Post - Construction Storm Water Management See attached summary report. • Pollution Prevention See attached summary report. b. Storm Water Quality Management Has the municipality completed a pollutant - loading analysis to assess compliance with the 20% TSS reduction developed urban area performance standard? ® Yes ❑ No If yes, provide the following: Model used WinSLAMM Version 9.2.5 Reduction ( %) 17.3% Has the municipality completed a pollutant - loading analysis to assess compliance with the 40% TSS reduction developed urban area performance standard? ® Yes ❑ No If yes, provide the following: Model used WINSLAMM Version 9.2.5 Reduction ( %) 17.3% If no, include a description of any actions the municipality has undertaken during 2009 to help achieve the 40% standard by March 10, 2013. As outlined in the City of Oshkosh Citywide Stormwater Management Plan and previous submittals, the City of Oshkosh will not meet the 40% standard by March, 2013. Has the municipality completed an evaluation of all municipal owned or operated structural flood control facilities to determine the feasibility of retrofitting to increase TSS removal? ® Yes ❑ No If yes, describe: All municipally owned flood control structures currently provide TSS removal to the best level that is possible. c. Storm Sewer System Map Describe any changes or updates to the storm sewer system map made in the reporting year. Provide an updated map. MS4 Maps were updated to reflect construction activities that took place during 2009. Updated maps are included with this submittal. Annual Report under MS4 General Permit No. WI- S050075 -1 Form 3400 -195 (R01/2010) Page 4 a. Provide a fiscal analysis that includes the annual expenditures for 2009, and the budget for 2009 and 2010. A table to document fiscal information is provided on page 6. b. What financing /fiscal strategy has the municipality implemented to finance the requirements of the general permit? ® Storm water utility ❑ General fund ❑ Other c. Are adequate revenues being generated to implement your storm water management program to meet the permit requirements? ® Yes ❑ No Please provide a brief summary of your financing /fiscal strategy and any additional information that will assist the Department in understanding how storm water management funds are being generated to implement and administer your storm water management program. The Storm Water Utility Rate Analysis performed in 2008 recommended a rate increase for 2009. That rate increase was implemented in April, 2009. The Rate Study was not revisited in 2009, but will be in 2010. Note: If an ordinance listed below has previously been submitted and has not been amended since that time, a copy does not need to be submitted again. If the ordinance was previously submitted, indicate such in the space provided. a. As of the date of this annual report, has the municipality adopted a construction site pollutant control ordinance in accordance with subsection 2.4.1 of the general permit? ❑ Yes ® No If yes, attach copy or provide web link to ordinance: b. As of the date of this annual report, has the municipality adopted a post- construction storm water management ordinance in accordance with subsection 2.5.1 of the general permit? ❑ Yes ® No If yes, attach copy or provide web link to ordinance: The City of Oshkosh has had a Storm Water Management Ordinance on the books since 1990. We are currently working on revising this ordinanace to meet the requirements of Section 2.5.1 of the MS4 Permit. hftp://www.ci.oshkosh.wi.us/Municipal_Codes/Chapter The storm water management portion of this section starts with Section 24 -7. c. As of the date of this annual report, has the municipality adopted an illicit discharge detection and elimination ordinance in accordance with subsection 2.3.1 of the general permit? ❑ Yes ® No If yes, attach copy or provide web link to ordinance: d. As of the date of this annual report, has the municipality adopted any other ordinances it has deemed necessary to implement a program under the general permit (e.g., pet waste ordinance, leaf management/yard waste ordinance, parking restrictions for street cleaning, etc.)? ® Yes ❑ No If yes, attach copy or provide web link to ordinance: The City of Oshkosh has had a parking restriction ordinance in place for many years. A copy of this ordinance can be found at: hftp:/twww.ci.oshkosh.wi.us/Municipal_Codes/Chapter The City of Oshkosh Health Codes cover pet waste. Specifically, section 6 -9 covers pet waste littering. A copy of this ordinance Annual Report under MS4 General Permit No. WI- SO50075 -1 Form 3400 -195 (R 01/2010) Page 5 can be found at: http://www.ci.oshkosh.wi.us/Municipal_Codes/Chapter e. Provide a summary of available information on the number and nature of inspections and enforcement actions conducted during the reporting period to ensure compliance with the ordinances described in a. to d. above. See attached summary report. Annual Report under MS4 General Permit No. WI- S050075 -1 Form 3400 -195 (R 01/2010) Page 6 a. Does any part of the MS4 discharge to an outstanding resource water (ORW) or exceptional resource water (ERW) listed under s. NR 102.10 or 102.11, Wis. Adm. Code? (A list of ORWs and ERWs may be found on the Department's Internet site at: http:// dnr. wi.gov /org/water /wmtwgs /orwerw ❑ Yes ® No If yes, list: b. Does any part of the MS4 discharge to an impaired waterbody listed in accordance with section 303(d)(1) of the federal Clean Water Act, 33 USC § 1313(d)(1)(C)? (A list of the most current Wisconsin impaired waterbodies may be found on the Department's Internet site at: http: // dnr. wi. gov /org /water /wm/wgs /303d /303d.html) ® Yes ❑ No If yes, complete the following: • Impaired waterbody to which the MS4 discharges: Lake Winnebago, Fox River, Lake Butte des Mortes • Description of actions municipality has taken to comply with section 1.5.2 of the MS4 general permit for discharges of pollutant(s) of concern to an impaired waterbody: Fox River: Listed for PAHs. There are no current discharges that would contibute to this pollutant. Lake Butte des Mortes: Listed for Mercury, PCBs, Sediment, and Phosphorus. Mercury is atmospheric deposition, which the City cannot implement a means to reduce. PCBs are no longer used in industrial processes along the river, and thus there are no longer discharges that would contribute to this polluntant. Sediment is being addressed on a City Wide basis, as required by the MS4 Permit. Phosphorus reductions will be associated with the reduction in sediment on a City Wide basis. Phosphorus is being addressed under the I &E plan to get residents to reduce the use of phosphorus. Until such time as a TMDL is prepared for the Upper Fox River Basin, it would be inappropriate to attempt to formulate a plan to reduce phosphorus. Lake Winnebago: Listed for Mercury, Sediment, and Phosphorus. Mercury is atmospheric deposition, which the city cannot implement a means to reduce. Sediment is being addressed on a City Wide basis, as required by the MS4 Permit. Phosphorus reductions will be associated with the reduction in sediment on a City Wide basis. Phosphorus is being addressed under the I &E Plan to get residents to reduce the use of phosphorus. Until such time as a TMDL is prepared for the Upper Fox River Basin, it would be inappropriate to attempt to formulate a plan to reduce phosphorus. c. Identify any known water quality improvements in the receiving water to which the MS4 discharges during the reporting period. None known. d. Identify any known water quality degradation in the receiving water to which the MS4 discharges during the reporting period and what actions are being taken to improve the water quality in the receiving water. None known. SECT101t IX ::[fepa rO er t € c�irimerce Autk►on, ... ° x °' F IR Section 2.4.1.1.3 of the MS4 general permit requires a permittee that does not already have authority from the Wisconsin Department of Commerce (Commerce) to regulate erosion control at public buildings and places of employment to request such authority from Commerce within 18 months after the start date of permit coverage. However, as of January 1, 2010, responsibility for erosion control administration and enforcement for commercial building sites was transferred from Commerce to the Department of Natural Resources. This transfer took place due to 2009 Wisconsin Act 28, the 2009 state budget legislation, which moved s. 101. 1205, Wis. Stats., commercial building construction site soil erosion and sediment control statutory language, to s. 281.33, Wis. Stats. As of January 1, 2010, the State's requirements for erosion control at commercial building construction sites will be administered by the Department of Natural Resources. Accordingly, a permitted municipality Annual Report under MS4 General Permit No. WI- SO50075 -1 Form 3400 -195 (R 01 /2010) Page 7 that was delegated to serve as an agent for Commerce will continue to serve as an agent for the Department of Natural Resources in accordance with the original agreement with Commerce unless this delegation is revoked by the Department of Natural Resources. As of January 1, 2010, was the municipality granted authority from the Wisconsin Department of Commerce to regulate erosion control at public buildings and places of employment? ® Yes ❑ No AS E.:: ... + ... ..- .� Provide a description of any proposed changes to the municipality's storm water management program and any other relevant change that the municipality plans or anticipates. T- OD oa 0 u) 0 rn C Z E 0 a L O c� ♦d N v O C LO T do 'a o = M o 0 Q. is c c Q N a U- O d V L m O U) -+ (D a 7 m 0 0 a) a) O 4) CL L M �0 = y . _T x (0 W C m c0 m U � w C C a) Q CD N a E 0 U ai ++ R � F- H W a R C E � Q L m O m L IL a a o o a a a 'a - o C LL LL LL LL LL LL LL LL LL LL U- N N N (U E E E E E E u, m E E E 0 0 0 0 in 0 0 ca cc in (7 o U 0 U) 0 cn cn O r N 00 coo r1 �o rn v a - O C 0 00 C6 -7 - Ln o O O LO O O M It O V v a-- O r 0) r N V 69 69 6) 69 69 69 69 ER E9 O O N N O M O 000 IQ 0 Ln D) ti Oct co O C ( O V) to d' O W) L0 h co M co ti r I- O M ER E9 Eq E9 E9 69 6R 6% 6R C) N UD r LO N Co (0 O O r co M 00 r (0 00 'ch 0) N N O N c- r N ti O LO m r r (D r N co 64 64 6f). 6 69 69 69 6) 6f3 t L L � o c E H «t 0 �+ 3 0 0 �. m a o 3 m m L c d O E a) v a o s 0 w e y c o m c u0 v cE ' 4 Ey m a w 3 o a► o m c cn V U'V „ •c a 2 E O N G U E c C W C La C 0 (0 — 0 r a CL IL =w UU a a co o. (n O Annual Report under MS4 General Permit No. WI- SO50075 -1 Form 3400 -195 (R 01/2010) Page 9 Ashland Langlade DNR Service Center Milwaukee Adams Marathon DNR Service Center Barron Lincoln 1401 Tower Ave. Waukesha Buffalo Monroe 5301 Rib Mountain Rd. Bayfield Oneida Superior, WI 54880 Clark Portage Wausau, WI 54401 Burnett Polk Phone: (715) 392 -7988 Crawford Trempealeau Phone: (715) 359 -4522 Douglas Price Jackson Vernon Florence Rusk Juneau Wood Forest Sawyer La Crosse Iron Taylor Vilas Washburn Chippewa Pepin DNR Service Center Dunn Pierce 890 Spruce St. Eau Claire St. Croix Baldwin, WI 54002 Phone: (715) 684 -2914 Brown Marquette DNR Northeast Region Columbia Jefferson DNR South Central Region Calumet Menominee 2984 Shawano Ave. Dane LaFayette 3911 Fish Hatchery Rd. Door Oconto Green Bay, WI 54313 Dodge Richland Fitchburg, WI 53711 Fond du Lac Outagamie Phone: (920) 662 -5100 Grant Rock Phone: (608) 275 -3266 Green Lake Shawano Green Sauk Kewaunee Waupaca Iowa Manitowoc Waushara Marinette Winnebago Kenosha Sheboygan DNR Service Center Milwaukee Walworth 141 NW Barstow Street, Ozaukee Washington Room 180 Racine Waukesha Waukesha, WI 53188 Phone: (262) 884 -2300