Loading...
HomeMy WebLinkAbout0140608-Plumbing (laterals) a) CITY OF OSHKOSH No 140608 OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 1312 MINNESOTA ST Owner RICHARD H DEMLER Create Date 04/22/2010 Contractor BERNDT EXCAVATING Category 401 - Residential - Exterior (laterals) Plan Bathtub Clothes Wshr Classrm Sink Surgeons Sink Roof Drain Deduct Meters Shower Lndry Tray Exam Sink Sterilizer Whirl ool Soda Disp Wtr Sewer Mtrs P Sump Pump F Prep Sink RPZ Valve Coffee Maker Wtr Usage Mtrs Lavatory San Sump /Pump Fir/Wst Sink Bidet Toilet Site Drain Misc. Water Softner Hand Sink Urinal Wait. St. Fixtures Kit Sink Standp Rec Lab Sink Beer Tap P Ice Chest Disposal Gar Drain Plaster Sink Dip Well Comm Ice Maker Dishwasher Local Waste Sculry Sink Drink Ftn Floor Drain Int Grease Trap Bar Sink Sery Sink Wash Ftn Ext Grease Trap Hose Bibb Breakrm Sink Shamp Sink Catch Basin Water Heater Eye Wash Statn Use /Nature Install 4" sanitary lateral in order to remove existing connection of shared sanitary lateral. of Work Size Material Type # Conn. Type Sanitary Sewer 4" Plastic Lateral 1 New Storm Sewer Water Service Parcel Id # 0901440000 Valuation $2,500.0 Plan Approval $0.00 Permit Fees $50.00 Permit Voided Issued By Date 04/22/2010 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement hol G and to cure any necessary pprovals before starting such activity. ' Signature � 4 k / d Date q ^� f C Agent/Owner Address 2430 W WAUKAU AVE OSHKOSH WI 54904 - 8985 Telephone Number (920) 235-3331 To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.