Loading...
HomeMy WebLinkAbout0140617-Plumbing (laterals) l CITY OF OSHKOSH No 140617 OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 224 N MAIN ST Owner BARBARA J BAIER Create Date 04/14/2010 Contractor SAMMONS PLUMBING Category 444 - Commercial - Exterior Laterals Plan Bathtub Clothes Wshr Classrm Sink Surgeons Sink Roof Drain Deduct Meters Shower Lndry Tray Exam Sink Sterilizer Soda Disp Wtr Sewer Mtrs Whirlpool Sump Pump F Prep Sink RPZ Valve Coffee Maker Wtr Usage Mtrs Lavatory San Sump /Pump Flr/Wst Sink Bidet Site Drain Misc. Toilet Water Softner Hand Sink Urinal Wait. St. Fixtures Kit Sink Standp Rec Lab Sink Beer Tap Ice Chest Disposal Gar Drain Plaster Sink Dip Well Comm Ice Maker Dishwasher Local Waste Sculry Sink Drink Ftn Int Grease Trap Floor Drain Bar Sink Sery Sink Wash Ftn Ext Grease Trap Hose Bibb Breakrm Sink Shamp Sink Catch Basin Eye Wash Statn Water Heater Use /Nature Laterals to serve existing commercial property. Sanitary building drain connected to 9 -11 Waugoo will be removed and installed new to N of Work Main St. Size Material Type # Conn. Type Sanitary Sewer 4" Plastic Lateral 1 New Storm Sewer 4" Plastic Lateral 1 New Water Service 1" Plastic Lateral 1 New Parcel Id # 0200120000 Valuation $5,000.00 Plan Approval $0.00 Permit Fees $150.00 ❑ Permit Voided Issued By Date 04/22/2010 In the performance of this work, I agree t• perform all work pursuant to rules governing the described construction. While the City of Oshkosh 1- - • hority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit - •p "•'tion wit ' n easement, the City strongly urges the permit applicant to contact the easement holder(s) an• o ecure a• • - : sa . -Is before starting such activity. Signature I , = 1 [iL -- 1,2..-^ AZ) E Date ,e ,7Z � • ent/Owner Address 522 W. MURDOCK ' VE OSHKOSH WI 54901 - 2298 Telephone Number (920) 231 -9880 To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.