Loading...
HomeMy WebLinkAbout0140580-Building (deck repairs) C:11 CITY OF OSHKOSH No 140580 OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 2120 OREGON ST Owner MR/MRS ROBERT T LYON Create Date 11/16/2009 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type • Building 0 Sign 0 Canopy 0 Fence Q Raze Zoning Class of Const: Size Unfinished /Basement Sq. Ft. Rooms Height Ft. ❑ Projection Finished /Living Sq. Ft. Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use /Nature SFR/ Repairs to the deck per the correction notice dated 11/28/2007. These repairs are required to be completed and inspection by of Work 5/17/10. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,000.00 Plan Approval $0.00 Permit Fee Paid n $25.00 Park Dedication $0.00 II Issued By: Lk (--- Date 04/20/2010 Final /O.P. 00 /00 /0000 ❑ Permit Voided! Parcel Id # 1402180000 _ In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure an cessary approvals before starting such activity. / I have read and underst•,i. h for ti ed information. / 2 � j � d Signature Date Agent/Owner Address Oshkosh WI 54901 - 0000 Telephone Number I 'I To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.