HomeMy WebLinkAbout10-112APRIL 13, 2010 10 -112 RESOLUTION (CARRIED 7 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVAL OF CHANGE ORDER NO. 1 WITH RADTKE CONTRACTORS, INC., FOR 400 BLOCK EAST PARKING LOT RECONSTRUCTION ($31,750.98) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: RADTKE CONTRACTORS, INC. PO BOX 6000 6408 Cross Road Winneconne, WI 54986 Net Increase to contract: $31,750.98 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 323 - 1717 - 7216 -06930 Land Improvement Expenditures CHANGE ORDER # 1 DATED: April 1, 2010 TO; RADTKE CONTRACTORS, INC. P. O. Box 6000 6408 Cross Road Winneconne, WI 54986 Your present contract with the City of Oshkosh, 400 Block (East) Parking Lot Reconstruction, is hereby amended and changed as follows: Original Contract Value $ 547,297.79 A. Additional Excavation (Radtke Contractors) $4,876.00 Over excavation of south bio- filtration area to improve soil stability. B. Additional Pavements (Sommers Construction Co., Inc.) $7,500.00 Change to provide new asphalt parking stall and concrete sidewalk for property located at 448 N Main Street. C. Utility Construction (Four -Way Construction) $13,245.00 Additional investigation for lateral connections, one new sanitary cleanout, 4.1 vertical feet of storm manhole, remove and dispose of old manhole with additional concrete curb removal. D. Asphalt Pavement (Northeast Asphalt) $2,084.00 Repaving of a portion of the parking lot due to excavation of failed electrical service by W PS. Patch areas were expanded to avoid small asphalt patches in brand new parking lot. E. Concrete Pavement (Sommers Construction Co., Inc.) $4,486.78 Additional concrete pavement (remove and replace) for street intersection located at the southwest corner of Merritt and Jefferson, also included is the reconstruction of curb & gutter and handicap ramp as well as the traffic control necessary to complete work in ROW. Additional concrete sidewalk along Merritt. F. Additional Item Units Item No. 107 (427 CY) (Unit Price = $3.66/CY) $1562.82 Stockpile pulverized asphalt and blended gravel for reuse Item No. 202 (88 CY) (Unit Price = $1.50 /CY) $132.00 Excavation Item No. 203 (427 CY) (Unit Price = $3.64 /CY) $1554.28 Placement of stockpile structural fill (pulverized asphalt & gravel base) Item No. 204 (284 CY) (Unit Price = $4.34/CY) $1,232.56 Export excess material Item No. 312 (8 SF) (Unit Price = $27.00 /SF) $216.00 Provide & install metal detectable warning plates Item No. 703 (1 VF) (Unit Price = $140.00NF) $140.00 48" Diameter Precast Sanitary Manhole Item No. 801 (1 LF) (Unit Price = $35.30/LF) $35.30 18" RCP Storm Sewer (Granular Backfill) Item No. 802 (3.01 VF) (Unit Price = $244.00NF) $734.44 48" Diameter Storm Sewer Manhole Item No. 805 (157 LF) (Unit Price = $27.05/LF) $4,246.85 6" Dia. Storm Sewer Lat. Relay and Connection to Storm Sewer Item No. 806 (10 Each) (Unit Price = $18.00 /Each) $180.00 Furnish and install storm lateral marker balls Item No. 810 (15 LF) (Unit Price = $12.60 /1-F) $189.00 6" perforated drain tile with filter fabric and pea gravel Item No. 812 (11 LF) (Unit Price = $11.95/LF) $131.45 Remove storm sewer (10" to 15 ") & dispose offsite Alternate No. 1 , (282 LF) (Unit Price = $21.70/1-F) $6,119.40 Footing and Foundations, Removal and disposal (48" Depth) Total Additional Item Units $16,474.10 G. Deduct Item Units Item No. 310 (24 Tons) (Unit Price = $9.25/Tons) <$222.00> Furnish and Install crushed stone base course Item No. 401 (1,776 Deduct SF) (Unit Price = $0.25 /SF) <$444.00> Erosion Control Slope Matting Item No. 700 (8 Deduct LF) (Unit Price = $43.10 /LF) <$344.80> 8" Diameter Sanitary Sewer (Granular Backfill) Item No. 701 (344 Deduct LF) (Unit Price = $42.80 /LF) <$14,723.20> New, extend, reconnect, & relay San. Sewer Lat(Gran. Backfill) Item No. 702 (29 Deduct, Each) (Unit Price = $18.00 /Each) <$522.00> Furnish and Install Sanitary Sewer Marker Balls Item No. 706 (7 Deduct, Each) (Unit Price = $44.00 /Each) <$308.00> Sanitary Sewer Factory Wyes and Tees Item No. 800 (11 Deduct LF) (Unit Price = $31.90/LF) <$350.90> 15" RCP Storm Sewer (Granular Backfill) Total Deduct Item Units <$16.914.90> Net Increase to Contract (A +B +C +D +E+F -G =) 31,750.9 Project Summary Original Contract Value $ 547,297.79 Change Order No. 1 $31,750.98 Amended Contract Value Recomynended: Direc r W1 Transportation $ 579,048.77 CITY OF OSHKOSH By: City Manager And: City Clerk Approved and accepted: RADTKE CONTR. GWORS,JVC B y . Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: Comptroller City Attorney of Oshkosh - Dempsey Tra rtation Department sh, WI 54902 (920) 2. MEMORANDUM - 4 OHKOH ON THE WATER (920)232 TO: Honorable Mayor and Members of the Common Council FROM: Christopher Strong, P.E., Director of Transportation DATE: April 6, 2010 RE: APPROVE ORDER NO. 1 WITH RADTKE CONTRACTORS, INC. FOR 400 BLOCK EAST PARKING LOT RECONSTRUCTION Background Change Order No. 1 for the reconstruction of the 400 Block East (Jefferson) parking lot is scheduled for consideration by the Common Council at the April 13, 2010 meeting. The contract was original awarded to Radtke Construction, Inc. of Winneconne, WI on July 28, 2009. Anal Additional costs were incurred for general construction and utility work based on field conditions. Foundations and footings that required removal were more extensive than anticipated in the bid documents. Additional excavation and fill work for the soil underlying the biofilter areas was necessary to ensure that the biofilters will work effectively. Additional investigative digging was required to determine which utility laterals needed to be reconnected and relayed. One result of this investigative digging was a substantial reduction in the amount of sanitary sewer lateral which needed to be connected. Additional paving work was required to compensate for an underground electric utility failure, and to integrate the property at 448 N. Main with the remainder of the parking lot. Additional sidewalk work was required on the northern and eastern edges of the project. Fiscal Analysis The change order represents a $31,750.98 increase over the $547,297.79 construction bid submitted by the contractor. This is less than the 10 percent construction contingency costs that were included in the total project cost estimate provided to the Common Council in July 2009. estimate the project's total cost as approximately $902,000, which is approximately $290,000 less than the amount of funding designated for the project through allocations in the Capital Improvement Program and Community Development Block Grant funding. City of Oshkosh — Department of Transportation