Loading...
HomeMy WebLinkAbout10-108APRIL 13, 2010 10 -108 RESOLUTION (CARRIED 7 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: ACCEPT AND APPROVE WAIVER OF SPECIAL ASSESSMENT NOTICES AND HEARING IN CONNECTION WITH IMPROVEMENTS — FIRST ADDITION TO CASEY'S MEADOW SOUTH INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the Waiver of Special Assessment Notices and Hearing under Section 66.0703(7)(b) of the Wisconsin Statutes, for public improvements and services, for the premises described below and in the attached Waiver is accepted and approved. FIRST ADDITION TO CASEY'S MEADOW SOUTH Lots 21 through 32 WAIVER OF SPECIAL ASSESSMENT NOTICES AND HEARING UNDER SECTION 66.0703, WISCONSIN STATUTES The undersigned, owner of property benefited by the following improvements to be made by the City of Oshkosh, Winnebago County, State of Wisconsin, to wit: For public construction, surveying and inspection of concrete sidewalk. For private construction and public inspection and survey for sanitary sewer, storm sewer, water main, laterals, grading & graveling, and concrete street pavement. In consideration of the construction of said improvements by the City of Oshkosh, Wisconsin, I hereby admit that such public improvement will benefit said property and consent to the levying of special assessments against the premises under Section 66.0703 of the Wisconsin Statutes for the cost of such improvements. In accordance with Section 66.0703 of the Wisconsin Statutes, I hereby waive all special assessment notices and hearings required by Section 66.0703 of the Wisconsin Statutes; and I further agree and admit that the benefit of my property from the construction of such improvements is in proportion to the footage thereof: Description of Premises First Addition to Casey's Meadow South Lots 21 - 32 Construction of Mockingbird Way 1. Sanitary Sewer & Laterals (Private Construction) Estimated Construction Cost $23,941.00 Private 6% Survey and Inspection $1,436.46 Invoice 2. Water Main with Laterals (Private Construction) Estimated Construction Cost $43,589.00 Private 6% Survey and Inspection $2,615.34 Invoice 3. Storm Sewer w /Laterals (Private Construction) Estimated Construction Cost $54,907.00 Private 6% Survey and Inspection $3,294.42 Invoice 4. Grading and Graveling (Private Construction) Center Line Feet of Roadway = 4301f Cost per Center Line Foot = $69.93/lf Estimated Construction Cost $30,070.00 Private 6% Survey and Inspection $1,804.20 Invoice Casey's Meadow —Phase I B Page 2 of 2 5. Sidewalk (Public Construction) Assess Assessment Rate = $23.00 per front foot of each lot Includes 6% for Inspection and Surveying First Addition to Casey's Meadow South Sidewalk Cost Lot # Sidewalk Frontage Estimate 21 61.00 $1,403.00 22 61.00 $1,403.00 23 61.90 $1,423.70 24 61.00 $1,403.00 25 61.00 $1,403.00 26 61.00 $1,403.00 27 61.00 $1,403.00 28 90.00 $2,070.00 29 75.00 $1,725.00 30 75.00 $1,725.00 31 75.00 $1,725.00 32 75.00 $1,725.00 6. Concrete Street Paving (Private) — Paving in 2013 Center Line Feet of Roadway = 4301f Cost per Center Line Foot = $200 /lf Include zero (0) Handicapped Ramps x $600.00 each = $0.00 Estimated Construction Cost $86,000.00 Private 6% Survey and Inspection $5,160.00 Invoice 7. Street Lighting (Private) $7,000.00 Private 4 — Year Irrevocable Letter of Credit for Private Construction = $245,507.00 4 — Year Irrevocable Letter of Credit for Public Services = $14,310.42 2 — Year Irrevocable Letter of Credit after Acceptance of Private Construction = $12,275.35 SignatuW of O"er: Signature oT Authorized Repr sentative Signature cif Authorized Representative X Date Date