Loading...
HomeMy WebLinkAboutLap Pool Trans Id #1773172 (03/08/2010) Safety and Buildings 3824 N CREEKSIDE LA commerce.Wi.goV HOLMEN WI 54636 i j ■ Contact Through Relay scan s t n RECEIVED Contact ons n Re Department of Commerce MAR 10 2010 Jim Doyle, Governor Ric ed. •tcr _. : . COMMUNTTY DEVELOPMENT , L V March 08, 2010 INSPECTION SERVICES DIVISION MAR 10 2010 CUST ID No. 46452 BRIAN W FREBER WATER TECHNOLOGY INC MUNICIPAL CLERK CITY CLERK S , "F10E 100 PARK AVE CITY OF OSHKOSH POBOX614 PO BOX 1130 BEAVER DAM WI 53916 OSHKOSH WI 54903-1130 CONDITIONAL APPROVAL PLAN APPROVAL EXPIRES: 03/08/2012 Identification Numbers Transaction ID No. 1773172 SITE: Site ID No. 601137 Oshkosh West High School Please refer to both identification numbers, 375 N Eagle St above, in all correspondence with the agency. City of Oshkosh, 54901 ; Fire Dept ID: 7003 FOR: Facility: 601137 OSHKOSH WEST HIGH SCHOOL 375 N EAGLE ST OSHKOSH 54901 Description: Lap pool - Replace 2 main drain sumps, frames and covers Object Type: Virginia Graeme Baker Modification Regulated Object ID No.: 1258642 The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes and Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner, as defined in chapter 101.01(10), Wisconsin Statutes, is responsible for compliance with all code requirements. Only those object types listed above have been approved; other submittals such as plumbing. The following conditions shall be met during construction or installation and prior to occupancy or use: Key Item(s) • This approval letter will be valid only when attached to plan sets bearing the signature and seal of the designing Wisconsin registered architect or engineer and corresponds with the approved copy on file with the department. • Pools require a minimum of one inspection. It is the option of the inspector to require additional inspections. Inspections shall include verification that sump(s) is built in accordance with fig. 2 of ASME/ANSI standard A112.19.8 -2007. The supervising professional is responsible to contact the appropriate inspector when the installation is in the rough -in- stage. • When calling for the pool inspection, be sure a copy of the approval letter and signed and sealed plan set is on the jobsite and the inspector informed where to locate it. Failure to have the plan at the jobsite will result in a re- inspection assessment to cover the cost of the inspector returning to the job site. • The ASME/ANSI A112.19.8 -2007 standard requires pool/spa drain covers be stamped as VGBA certified. The owner(s) of the pool shall be given a copy of this information which includes the life expectancy of the cover. • Main drain frame and grates are `Lawson' MLD -FGD -1818. • The recirculation pump is a `Aurora'341BF 3x4x9B 15 HP with a maximum flow of 680 gpm. BRIAN W FREBER Page 2 3/8/2010 A copy of the approved plans, specifications and this letter shall be on -site during construction and open to inspection by authorized representatives of the Department, which may include local inspectors. All permits required by the state or the local municipality shall be obtained prior to commencement of construction /installation/operation. Any local requirements shall be complied with. In granting this approval, the Division of Safety & Buildings reserves the right to require changes or additions, should conditions arise making them necessary for code compliance. As per state stats 101.12(2), nothing in this review shall relieve the designer of the responsibility for designing a safe building, structure, or component. The Division does not take responsibility for the design or construction of the reviewed items. Inquiries concerning this correspondence may be made to me at the telephone number listed below, or at the address on this letterhead. Sincerely, Fee Required $ 350.00 U)O.AAl2",-HCD This Amount Will Be Invoiced. When You Receive That Invoice, Warren Douglas Erler Please Include a Copy With Your Plan Examiner , Integrated Services Payment Submittal. (608)789 -4690 , Mon - Thur 6:OOAM - 4:30PM WISMART code 7650 warren.erler @wisconsin.gov cc: Thomas L Braun, Plumbing Consultant, (715) 340 - 5387 , Mon. 7:45 -4:30 Shane Sanderson Wisconsin DHS Notice: Starting July 1, 2009, no person or entity may engage or offer to engage in construction business in Wisconsin unless they hold a Building Contractor Registration, or equivalent, issued by the Safety and Buildings Division of the Wisconsin Department of Commerce. "Construction business" means a trade that installs, alters or repairs any building element, component, material or device that is regulated under the commercial building code, chs. Comm 60 to 66, the uniform dwelling code, chs. Comm 20 to 25, the electrical code, ch. Comm 16, the plumbing code, chs. Comm 81 to 87, or the public swimming pools and water attractions code, ch. Comm 90. The term does not include the delivery of building supplies or materials, or the manufacture of a building product not on the building site. For further information, go to our website: www. commerce. wi. gov /SB /SB- BuildingContractorProgram.html Note: Your project may be eligible for free technical assistance and financial incentives from Focus on Energy if you incorporate renewable energy and/or higher efficiency HVAC or lighting systems into your building. For more information about Focus on Energy's New Construction Program, call (800) 762 -7077 or visit http:// www. focusonenergy.com/Business/New- Business - Construction/ Note: Effective March 29, 2010, we are consolidating our Shawano full- service office with our Green Bay office. Please address all plans, correspondence, mail, etc. related to previous Shawano services, for delivery after that date, to: Division of Safety & Buildings, 2331 San Luis Place, Suite 150, Green Bay, WI 54304. If calling moved Shawano staff after that date, call (715)492 -5601.