HomeMy WebLinkAbout10-70MARCH 9, 2010 10 -70 RESOLUTION (CARRIED 7 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVAL OF CHANGE ORDER NO. 1 FOR PUBLIC WORKS CONTRACT NO. 09 -26 WITH KRUCZEK CONSTRUCTION, INC. FOR USH 41 CORRIDOR UTILITIES (- $151,402.68) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: KRUCZEK CONSTRUCTION, INC. 3636 Kewaunee Road Green Bay, WI 54311 Net decrease to contract: (- $151,402.68) PURPOSE: See attached Change Order. ( 0 OFKOH ON THE WATER MEMORANDUM TO: FROM: DATE: RE: Honorable Mayor and Members of the Common Council Steven M. Gohde, Assistant Director of Public Works March 3, 2010 Change Order No. 1 for Public Works Contract No. 09 -261 Kruczek Construction Inc. / USH 41 Corridor Utilities (- $151,402.68) BACKGROUND Change Order #1 for Contract 09 -26 is scheduled for consideration by the Common Council at the March 9, 2010 meeting. The contract was originally awarded to Kruczek Construction Inc. of Green Bay in October of 2009. This change order is to finalize quantities. ANALYSIS During the construction, rock was encountered at the proposed water main crossing location. The contract did not have provisions to address construction of the new water main through rock. The result is the work was rebid as contract 10 -03. This change order will close out contract 09 -26. FISCAL IMPACT The funding from this project will be used to pay for contract 10 -03. The Department of Transportation will be reimbursing the City 90% of the cost to relocate the existing facilities. RECOMMENDATIONS recommend approval of the Change Order No. 1 to Contact No. 09 -26 in the amount of - $151,402.68 to Kruczek Construction Inc. Respectfully Submitted, Steven M. Gohde Asst. Director of Public Works Approved: City Manager 1:\Engineering \09 -26 USH 41 Corridor Utilities CTY K \Project_lnformation \Correspondence \Memo \CO #1 exp.doc CHANGE ORDER # 1 DATED: February 19, 2010 TO: Kruczek Construction, Inc. 3636 Kewaunee Road Green Bay, WI 54311 Your present contract with the City of Oshkosh, Contract No. and changed as follows: NET DECREASE TO: SECTION I - CONCRETE PAVING NET DECREASE TO: SECTION II - SANITARY SEWER NET DECREASE TO: SECTION III - WATER MAIN NET DECREASE TO CONTRACT: Recommended: Director of Public Works M 09 -26 , is hereby amended ($31,425.50) ($12,432.00) ($107,545.18) ($151,402.68) CITY OF OSHKOSH City Manager City Clerk jApved and accepted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT: 09 -26 CHANGE ORDER # 1 SECTION I - CONCRETE PAVING 100 Pavement removal, Square INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET I COST PER CONTRACT CONTRACT NUMBER 9" non - reinforced concrete UNIT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 100 Pavement removal, Square INCREASE IN DECREASE IN ITEM complete asspecified Yards 190 0.00 NET - 190.00 $5.00 $950.00) 101 9" non - reinforced concrete UNIT CONTRACT CONTRACT NUMBER pavement, including QUANTITIES QUANTITIES INCREASE DECREASE UNIT integral curb, 6" base PRICE PRICE material and grading, complete as specified Square Yards 1 190 0.00 - 190.00 $59.00 $11,210.00 102 3 1/2" asphaltic concrete driveway, complete as Square specified Feet 2,300 0.00 - 2,300.00 $2.80 $6,440.00 103 Sawing, complete as Linear specified Feet 550 0.00 - 550.00 $2.00 ($1,100.00 104 Furnish and install pavement ties (epoxy coated), complete as specified Each 55 0.00 -55.00 $10.00 $550.00 105 Adjust manholes and inlets, complete as specified Each 1 0.00 -1.00 $365.00 $365.00 106 Topsoil, seed, fertilizer and erosion mat, complete as Square specified Yards 1,075 0.00 - 1,075.00 $3.80 $4,085.00) 107 Furnish, install, maintain and remove inlet protection type D, as shown on the plans, complete as ,specified Each 2 0.00 -2.00 $75.00 $150.00 108 Furnish, install, maintain and remove tracking pads, as shown on the plans, complete as specified Each 1 0.00 -1.00 $750.00 $750.00 109 Furnish, install, maintain and remove silt fence, as shown on the plans, Linear complete asspecified Feet 600 550.00 -50.00 $1.50 $75.00 110 Furnish, install, maintain and remove traffic control, Lump complete asspecified Sum 1 0.00 -1.00 $5,750.50 $5,750.50 SECTION I - (BID ITEMS 100 -110) - SUB - TOTALS $0.00 ($31,425.50) NET DECREASE TO: SECTION 1 ($31,425.50) SECTION II -SANITARY SEWER 200 Furnish and install 12" sanitary sewer (PVC Pipe), complete as specified Linear Feet 91 0.00 -91.00 $100.00 ($9,100.00 Page 1 of 3 INCREASE IN DECREASE IN ITEM CONTRACT INSTALLED NET NET COST PER DESCRIPTION UNIT CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 200 Furnish and install 12" sanitary sewer (PVC Pipe), complete as specified Linear Feet 91 0.00 -91.00 $100.00 ($9,100.00 Page 1 of 3 CONTRACT: 09 -26 CHANGE ORDER # 1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER INCREASE 1N CONTRACT DECREASE IN CONTRACT NUMBER ductile iron water main with QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 201 Furnish and install std. UNIT CONTRACT CONTRACT NUMBER sanitary manhole (4' inside Linear QUANTITIES QUANTITIES INCREASE DECREASE UNIT diameter), complete as Feet 10 -10.00 $76.00 PRICE PRICE 301 specified without casting Vertical ductile iron water main with Feet 10.5 3.3744 -7.13 $215.00 $1,532.00) 202 Furnish and install connections of new Linear sanitary main to existing Feet 366 - 366.00 $77.00 $28,182.00) 302 main, (various locations and sizes), complete as s ecified Each 1 1 0.00 -1.00 $600.00 $600.00) 203 Abandon sanitary sewer on Koeller Street, complete as Lump specified Sum 1 0.00 -1.00 $500.00 $500.00 204 Remove existing sanitary sewer manhole, complete Linear asspecified Each 1 0.00 -1.00 $700.00 $700.00 SECTION II - (BID ITEMS 200 -204) - SUB - TOTALS $0.00 ($12,432.00) NET DECREASE TO: SECTION II ($12,432.00) SECTION [if -WATER MAIN 300 Furnish and install 12" INCREASE IN DECREASE IN ITEM ductile iron water main with CONTRACT INSTALLED NET NET COST PER DESCRIPTION UNIT CONTRACT CONTRACT NUMBER specified (fittings not Linear QUANTITIES QUANTITIES INCREASE DECREASE UNIT included ) Feet 10 -10.00 $76.00 PRICE PRICE 300 Furnish and install 12" ductile iron water main with poly wrap, complete as specified (fittings not Linear included ) Feet 10 -10.00 $76.00 $760.00 301 Furnish and install 16" ductile iron water main with poly wrap, complete as specified (fittings not Linear included ) Feet 366 - 366.00 $77.00 $28,182.00) 302 Furnish and install 16" ductile iron water main with poly wrap and snap -lok restrained joints, complete as specified (fittings not Linear included ) Feet 230 - 230.00 $30.00 $6,900.00) 303 Jack and bore 30" steel casing pipe, complete as Linear specified Feet 230 - 230.00 $295.00 ($67,850.00) 304 Furnish and install 16" x 12" reducers, complete as specified Each 2 -2.00 $575.00 ($1,150.00) 305 Furnish and install 16" - 45 degree bends, complete as specified Each 6 -6.00 $900.00 $5,400.00) 306 Furnish and install 12" x 12" tapping sleeve and valve, complete as , specified Each 2 -2.00 $3,900.00 $7,800.00) Page 2 of 3 CONTRACT: 09.26 CHANGE ORDER # 1 SECTION III - (BID ITEMS 300 - 310) - SUB - TOTALS ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION III $0.00 ($122,592.00) Furnish additional labor, INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER to perform additional test QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE C 12" "ye .. bedrock on E/S and W/S of €aGh 2 -2.00 $0.00 valve Gemp l ete ,as sp 308 Abandon water main on 12/18/09, per lump sum CTH K (20TH Avenue), Lump complete asspecified Sum 1 1.00 -1.00 $1,000.00 $1,000.00 309 Furnish and install 12" caps, complete as s ecified Each 2 -2.00 $800.00 $1,600.00 310 Fumish and install 1" water services, complete as s spec Each 2 -2.00 $975.00 ($1,950.00 SECTION III - (BID ITEMS 300 - 310) - SUB - TOTALS ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION III $0.00 ($122,592.00) 311 Furnish additional labor, INCREASEIN DECREASE IN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT NUMBER to perform additional test QUANTITIES QUANTITIES IN DECREASE UNIT PRICE PRICE 311 Furnish additional labor, equipment, and materials to perform additional test holes to check elevation of bedrock on E/S and W/S of USH 41, per Invoice dated 12/18/09, per lump sum Lump Sum 0.00 1.00 1.00 1$15,046.82 1 $15,046.82 ADDITIONAL WORK: C. O. # 1 - (ITEM 311) - SUB -TOTAL $15,046.82 $0.00 NET DECREASE TO: SECTION III ($107,545.95) NET INCREASE TO SECTIONS I, II, III, IV $15,046.82 NET DECREASE TO SECTIONS I, II, III, IV ($166,449.50) NET DECREASE TO CONTRACT: ($151,402.68) Page 3 of 3