HomeMy WebLinkAbout10-73MARCH 9, 2010 10 -73 RESOLUTION (CARRIED 7 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 10 -09 TO MIRON CONSTRUCTION CO., INC. FOR MELVIN AVENUE STORMWATER PUMP STATION ($3,029,860.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has heretofore advertised for bids for Melvin Avenue stormwater pump station; and WHEREAS, upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: MIRON CONSTRUCTION CO., INC. 1417 McMahon Dr. Neenah, WI 54956 Total Bid (including Deduct Alternate No. 1): $3,029,860.00 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 561 - 2010 - 1799 -00000 -- Storm Water Utility - Construction Work in Progress � \ � h � a � / � h _ m / � a / o � q 0 a ƒ ƒ ƒ 0 E / g w g 2 $ / / / g » _ ««=k a 2 � G ° / 0 0 w 2 / / =u�Ce q � ƒ \ ƒ ƒ § 2 k \ m 2 � a o a / b \ & c E §E4 = - n - / c / % /\ w R \$ adc»E § S S ƒ ƒ - .ƒ 0 \ k \ % $ ¢ § 62 2 C _ o \/7 IL ® _ < kIk 0 i / § e o o � ¥ c f - 2 a3�z s § 61 � b d E z �/ ° w 0 \ U) jE �k 2 R &< % 2 �o G \ o u 0 k3 k� ƒ k �� } �E M- I R� E2 e 2k� �§ U \ z0 ER E 0 \\ F - 2 I D w uz R§ Qc w 0 0 cIa mom= ��± emE R -j _ « 0M ° E §§ mU- ( 0 Of HKOf H ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works DATE: March 4, 2010 RE: Award Bid for Public Works Contract No. 10 -09 /Miron Construction Company, Inc./ Melvin Avenue Stormwater Pump Station/ ($3,029,860.00) BACKGROUND The purpose of this project is construct a storm water pump station in Menominee Park to address routine flooding problems experienced in the Melvin Avenue stormwater drainage basin. The project is designed to prevent flooding of the streets during a 10 year or smaller storm event. The bid package include the option to have a green (vegetative) roof installed. ANALYSIS Engineering staff along with the design engineer reviewed three bids. The low bid was received from Miron Construction Company, Inc., of Neenah, WI. The total bid is $3,068,000.00. A deduction in the amount of $38,140.00 was provided if the green (vegetative) roof is not installed. The purpose of a green roof is to reduce runoff from a site. Given the pump station proximity to the lake and the small overall size of the vegetative area on the roof, the benefit of the green roof is minimized and it is not recommended for installation. FISCAL IMPACT Funding for this project is in the 2010 Storm Sewer Construction Section of the Capital Improvement Program. Following is a summary of the available funds and the construction costs including engineering fees. The construction cost shown below removes the green roof from the total estimated cost. Even though the project cost will exceed the budget estimate, it is anticipated that adequate funding exists and is available from other storm sewer projects. CIP Section CIP Funds Budgeted Construction Cost with Engr. Storm Sewer 1 $3,300,000 1 $3,423,505 RECOMMENDATIONS I recommend award to the low bidder, Miron Construction Company, Inc. for the amount of $3,029,860.00 (vegetative roof not included). Respectfully Submitted, Approved: Steven M. Gohde� Asst. Director of Public Works City Manager ]:\Engineering \10 -09 Melvin Avenue Storm Water Pump Station\ Project_ Information \Correspondence \Memo \award bid.doc