HomeMy WebLinkAbout10-76MARCH 9, 2010 10 -76 RESOLUTION
(CARRIED 7 -0 LOST LAID OVER WITHDRAWN )
PURPOSE: APPROVE AGREEMENT WITH WISCONSIN DEPARTMENT OF
TRANSPORTATION FOR RECONSTRUCTION OF US HWY 41 AT
HIGHWAY 45 ($4000.00)
INITIATED BY: PUBLIC WORKS DEPARTMENT
BE IT RESOLVED by the Common Council of the City of Oshkosh that the attached
Amendment to Agreement with Wisconsin Department of Transportation for reconstruction
of US Highway 41 at Highway 45 with a cost to the City of Oshkosh of $4000 is hereby
approved and the proper City officials are hereby authorized to execute and deliver the
agreement in substantially the same form as attached hereto, any changes in the
execution copy being deemed approved by their respective signatures, and said City
officials are authorized and directed to take those steps necessary to implement the terms
and conditions of the Agreement.
BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated
from:
Acct. No. 541 - 1841 - 1799 -00000 Water Utility - Construction Work in Progress
STATE / MUNICIPAL AGREEMENT
FOR A
HIGHWAY IMPROVEMENT PROJECT
DATE: December 11, 2009
I.D.: 1120 -11 -83
HIGHWAY: US 41 LENGTH: 1.496
LIMITS: STH 21 — US 45
COUNTY: Winnebago
The signatory City of Oshkosh, hereinafter called the Municipality, through its undersigned duly authorized
officers or officials, hereby requests the State of Wisconsin Department of Transportation, hereinafter called the
State, to initiate and effect the highway or street improvement hereinafter described.
The authority for the Municipality to enter into this agreement with the State is provided by Section 86.25(1),
(2), and (3) of the Statutes.
NEEDS AND ESTIMATE SUMMARY:
Existing Facility (describe and give reason for request): US 41 will be reconstructed from four to six lanes from STH 26 -
Breezewood Lane. US 41 has reached its capacity and upgrading capacity will meet the future needs of the travelling public along
with improving safety.
Proposed Improvement (nature of work): Reconstruct US 41/45 Interchange Avenue interchange will be reconstructed to include
free flow improvements for US 41 NB to US 45 NB and US 45 SB to US 41 SB. Participation with City is to extend water main out to
the interchange for added water service and hydrant closer to the interchange for future fire protection. This is a concern on the 3 level
high flyover ramp.
Describe non - participating work included in the project contract: None.
Describe other work necessary to finish the project completely which will be undertaken independently by the Municipality:
None.
PHASE
ESTIMATED COST
Federal / State
Municipal
Total
Estimated Cost
Funds
%
Funds
%
Construction (Participating):
Project ID 1120 -11 -83
Category 0010 — Roadway Items
$26,800,000
$26,800,000
100
$ 0
0
Category 0020 — Lighting
$ 900,000
$ 900,000
100
$ 0
0
Category 0030 — ITS
$300,000
$300,000
100
$ 0
0
Category 0040 — Community Sensitive
$11,000
$11,000
100
$0
0
Design Items — Roundabout Landscaping
Category 0050 — Extending water main
$40,000
$36,000
90
$4,000
10
Category 0060- Sign Structures
$460,000
$460,000
100
$0
0
Category 0070 — Structure B -70 -262
$2,200,000
$2,200,000
100
$0
0
Category 0080 — Structure B -70 -269
$7,600,000
$7,600,000
100
$0
0
Category 0090 — Structure B -70 -270
$530,000
$530,000
100
$0
0
Category 0100— Structure B -70 -274
$380,000
$380,000
100
$0
0
Category 0110 — Structure B -70 -276
$600,000
$600,000
100
$0
0
Category 0120— Structure R -70 -15
$380,000
$380,000
100
$0
0
Category 0130 — Structure R -70 -16
$1,660,000
$1,660,000
100
$0
0
Category 0140 — Structure R -70 -17
$285,000
$285,000
100
$0
0
Category 0150 — Structure R -70 -18
$335,000
$335,000
100
$0
0
Category 0160 — Structure R -70 -19
$335,000
$33500
1 100
$0
0
TOTAL COST DISTRIBUTION:
$ 42,816,000
$42,812,000
1
$ 4,000
This request is subject to the terms and conditions that follow and is made by the undersigned under proper
authority to make such a request for the designated Municipality and upon acceptance by the State shall
constitute agreement between the Municipality and the State.
Signed for and in behalf of
Name
Municipality
Title
Date
2
TERMS AND CONDITIONS:
1. The initiation and accomplishment of the improvement will be subject to the applicable Federal and State
regulations.
2. The Municipality will pay to the State all costs incurred by the State in connection with the improvement
which exceed Federal/State financing commitments or are ineligible for Federal /State financing.
3. Funding of each project phase (preliminary engineering, real estate, construction, and other) is subject to
inclusion in an approved program. Federal aid and/or State transportation fund financing will be limited to
participation in the costs of the following items as specified in the estimate summary:
a) The grading, base, pavement, and curb and gutter.
b) Catch basins and inlets for surface water drainage of the improvement with connections to the storm
sewer main.
c) Construction engineering incidental to inspection and supervision of actual construction work.
d) Signing and pavement marking including detour routes.
e) Compensable utility adjustment.
f) Storm Sewer mains necessary for the surface water drainage (does not include additional upsizing of
storm sewer main requested by Municipality).
g) Replacement of sidewalks and resurfacing of private driveways, necessitated by the project.
h) New installations of street lighting and traffic signals or devices at the time of construction.
i) Alteration of existing street lighting and traffic signal devices necessitated by the project.
j) Real estate for the improvement.
k) Preliminary engineering and State review services.
4. Work necessary to complete the improvement to be financed entirely by the Municipality or other utility or
facility owner includes the following items:
a) New installations of or alteration of sanitary sewers and connections, water, gas, electric, telephone
telegraph, fire or police alarm facilities, parking meters, and similar utilities.
5. As the work progresses, the Municipality will be billed for work completed which is not chargeable to
Federal / State funds. Upon completion of the project, a final audit will be made to determine the final
division of costs.
6. If the Municipality should withdraw the project, it will reimburse the State for any costs incurred by the
State in behalf of the project.
3
7. The work will be administered by the State and may include items not eligible for Federal / State
participation.
8. Structures B -70 -262, 269, 270, 274, & 276 will be WisDOT owned structures and WisDOT's responsibility
to maintain the integrity of the structure.
9. Retaining walls R- 70 -15, 16, 17, 18, & 19 will be WisDOT owned structures and WisDOT's responsibility
to inspect and maintain the integrity of the retaining walls.
10. WisDOT will maintain all street lighting within the US 41/45 Interchange, which includes, but is not limited
to, the responsibility for the energy, operation, maintenance, and replacement of the lighting system
(including associated costs).
11. The Municipality will at its own cost and expense:
a) Use the WisDOT Utility Accommodation Policy unless it adopts a policy which has equal or more
restrictive controls.
b) Provide complete plans, specifications, and estimates for any Sanitary and Water system work the
Municipality wants to let with the State's project. During construction, assume full responsibility for
establishing line and grade, pressure and purification testing, and operation of the sanitary and water
systems. The Municipality relieves the State and all of its employees from liability for all suits, actions,
or claims resulting from the sanitary sewer and water main construction under this agreement.
c) Maintain the water main system installed with the project.
12. Basis for Local Participation:
Construction — Category 0010 — Construction of the roadway items for the project is 100%
Federal /State funded.
Construction — Category 0020 — Lighting installed for the system interchange and the roundabout is
100% Federal/State funded.
Construction — Category 0030 — Intelligent Transportation Systems (ITS) installed with the project is
100% Federal /State funded.
Construction — Category 0040 — Community Sensitive Design Items is 100% Federal/State funded and
includes the landscaping in the roundabout at US 41 SB ramps and US 45.
Construction — Category 0050 — Extension of the water main north and west along US 45 to provide
added fire protection for the Structure B -70 -269 is 90% Federal/State Funded and 10% City of Oshkosh
funded per State Statute 84.295 for adjustment of publicly owned utilities as part of freeway project.
Construction — Category 0060 — Sign structures installed with the project are 100% Federal/State
funded.
Construction — Category 0070 — Construction of Structure B -70 -262 is 100% Federal /State funded.
Construction — Category 0080— Construction of Structure B -70 -269 is 100% Federal /State funded.
Construction — Category 0090 — Construction of Structure B -70 -270 is 100% Federal/State funded.
Construction — Category 0100 — Construction of Structure B -70 -274 is 100% Federal /State funded.
Construction — Category 0110 — Construction of Structure B -70 -276 is 100% Federal/State funded.
Construction — Category 0120 — Construction of Structure R -70 -15 is 100% Federal /State funded.
Construction — Category 0130 — Construction of Structure R -70 -16 is 100% Federal/State funded.
4
Construction — Category 0140 — Construction of Structure R -70 -17 is 100% Federal /State funded.
Construction — Category 0150 — Construction of Structure R -70 -18 is 100% Federal /State funded.
Construction — Category 0160 — Construction of Structure R -70 -19 is 100% Federal/State funded.
( 0
K H
ON THE WATER
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: Steven M. Gohde, Assistant Director of Public Works
DATE: March 3, 2010
RE: Approve Agreement with Wisconsin Department of Transportation for Reconstruction of
USH 41 at Highway 45.
BACKGROUND
The Wisconsin Department of Transportation (WIDOT) is planning to reconstruct USH 41 from State
Highway 26 to Breezewood Lane in Neenah beginning in 2009. USH 41 has reached its capacity and
will be expanded to meet the public needs and improve safety. The construction addressed in this
agreement covers the extension of water main along Algoma Blvd. (Hwy 45) to the northwest.
Approximately 800' of water main will be installed.
ANALYSIS
The DOT and Oshkosh Fire Department concur that extending water main to near Hwy 41 will aid in the
ability to provide emergency services in the area. The cost is split between the City of Oshkosh and the
DOT.
FISCAL IMPACT
The total cost of the water main extension is estimated at $40,000. The cost to the City of Oshkosh for
this project is $4,000. Adequate funding is available in the 2010 Capital Improvement Program.
RECOMMENDATIONS
I recommend approval of the State /Municipal Agreement.
Res ectfully Submitted,
Steven M. Gohde
Asst. Director of Public Works
Approved:
Mark A. Rohloff
City Manager
I:\Engineering \Correspondence \Steve Gohde \council memos\DOT Agreement Algoma USH 45 water ext.doc