Loading...
HomeMy WebLinkAboutRough (electric) - 01/23/1998 INSPECTION REPORT: ADDRESS: 2 3 2 ° CONTRACTOR e_e - Date / /z 3 /9 t Request taken By 4 2/( Time Called In 7: 3 a' //L L_ /9 - Insp. Needed Requested B-� Of Requested,By c.22- d-, &eQ_ Phone # Project to be Inspected ' i. -i .r � ,,,..,, f Comm/.00 Means of Access BUILDING: PLUMBING: ELECTRIC: HVAC: EROSION CONTROL: MISC: Footing Rough Rough ✓ Rough Tracking Other Foundation Test On Service Furnace Silt Fence Rough Underfloor Amps Ph A/C Stone Access Insulation Sewer/Water _ Temp Perm Fireplace E.C. Bales Bsmt. Floor Reinsp. UG OH Reinsp. Reinsp. Reinsp. Final Reinsp. Final Final Final Other Final Other Other Other Other ITEM# ORDER y � • INSPECTION RESULTS .74- zi ��iGi( , -C 4)) .■Cke.._ ,.../(.1-7A—a-e-- / CAA— "4 , M .,-27 , I _. W.e 4 } y CA--- lt, , 1 1 •-al -, ,L:g l t. VIOLATIONS MUST BE CORRECTED AND APPROVED BEFORE CONCEALMENT! CALL FOR INSPECTIONS kction Taken: Approved ❑ Not Approved/ Inspection Report left on site 0 Not Approved/ Correction Notice mailed ❑ Verbal Notice to Signed Inspection Services Division Phone Number