Loading...
HomeMy WebLinkAbout10-64FEBRUARY 23, 2010 10 -64 RESOLUTION (CARRIED 6 -1 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE CONDITIONAL USE PERMIT FOR CONSTRUCTION OF A PUBLIC UTILITY STRUCTURE /POWER PLANT BY UW- OSHKOSH AT 755 DEMPSEY TRAIL INITIATED BY: UW- OSHKOSH PLAN COMMISSION RECOMMENDATION: Found to be consistent with Section 30 -11(D) and approved with conditions BE IT RESOLVED by the Common Council of the City of Oshkosh that a conditional use permit to construct and operate a public utility structure /power plant, including but not limited to, fermenting chambers, combined heat and power room, mixing aisle, waste storage area and an office, per the attached, is hereby approved with the following conditions: 1) The southern lot line be adjusted as depicted. 2) Landscaping incorporate screening to the south, as approved by the Department of Community Development. 3) Gravel areas of the development area be restored to vegetative ground cover. 4) No outdoor storage of material, machinery or equipment. A J'H 1 H ON THE WATER TO: Honorable Mayor and Members of the Common Council FROM: Darryn Buric$ing Director of Pl Services DATE: February 18, 2010 RE: Approve Conditional Use Permit for Construction of a Public Utility Structure/Power Plant by UW- Oshkosh at 755 Dempsey Trail (Plan Commission Recommends Approval) BACKGROUND The subject two acre area includes the property located at 755 Dempsey Trail as well as approximately 0.8 acres of property currently part of 732 Witzel Avenue. It is zoned M -2 Central Industrial District and is undeveloped with the exception of gravel areas and a gravel drive. It is located on the south side of Dempsey Trail across from the sewage treatment plant, west of UW- Oshkosh facilities building (former Cub Foods) and west of the City Parks Department storage area (former animal shelter). ANALYSIS The conditional use request is to construct and operate a 27,000 square foot renewable energy plant that will convert organic waste material into heat and usable energy. The site development includes the removal of the existing gravel and construction of the plant including fermenting chambers, combined heat and power room, mixing aisle, interior material storage area and a small office; a two stall parking area; a truck staging area; and two access drives from/to Dempsey Trail. Parking stalls meet zoning ordinance regulations and signage and lighting plans were not yet submitted but are required to meet code requirements. Landscaping is not required, as this site is situated in the M -2 zoning district, however the Plan Commission recommends landscaping be installed to act as screening of the structure from the south because of the visibility of the mechanical equipment to the commercial areas along Witzel Avenue. Stormwater management plans have not yet been finalized but will require approval by the Department of Public Works during the regular building permit process. FISCAL IMPACT None anticipated. RECOMMENDATION The Plan Commission approved of this request at its February 16, 2010 meeting. Approved, City Manager ITEM: CONDITIONAL USE PERMIT FOR A PUBLIC UTILITY STRUCTURE/POWER PLANT AT 755 DEMPSEY TRAIL Plan Commission meeting of February 16, 2010 GENERAL INFORMATION Applicant: Bioferm Energy Systems Owner: UW- Oshkosh Foundation Witzel, LLC Action(s) Requested: The applicant is requesting a conditional use permit to construct and operate a renewable energy plant at 755 Dempsey Trail. Applicable Ordinance Provisions: Public and quasi - public utilities are permitted only through conditional use permits in the M -2 Central Industrial Zoning District as regulated in Section 30 -29 (A)(2) of the Zoning Ordinance. Standards imposed on Conditional Use Permits are located in Section 30 -11 (D) of the Zoning Ordinance. Background Information Property Location and Type: The subject 2 acre area is zoned M -2: Central Industrial District and is undeveloped with the exception of gravel areas and a gravel drive. It is located on the south side of Dempsey Trail across the street from the sewage treatment plant and next to UW Oshkosh facilities building and City Parks Department storage area. Subject Site Existing Land Use Zonin Vacant M-2 Existing Uses Zonin North Sewage Plant (across Dempsey Trail) M -2 South Unoccupied former Carwash & Rental center M -2 East UWO Facilities Building and remote Parkin Lot M -2 West City Parks Department Storage M -2 Comprehensive Plan Land Use Recommendation Land Use 10 Year Land Use Recommendation Commercial 20 Year Land Use Recommendation Commercial ANALYSIS The area included in the conditional use request includes all of the approximately 1 acre property located at 755 Dempsey Trail (west of the UWO Facilities Building) and as well as approximately 0.8 acres of property currently part of the existing parcel (approximately 60 %) at 732 Witzel Avenue. These land areas combined as described equate to approximately 1.8 acres of land and make up the subject site. As part of the conditional use approval, staff recommends that the property lines between the two parcels be adjusted as depicted. The conditional use request is to construct and operate a renewable energy plant including fermenting chambers, combined heat and power room, mixing aisle, waste storage area and an office. This plant will convert organic waste into usable energy. Site Plan Development of the site includes the construction of an approximately 27,000 square foot Energy Plant. The development also includes a two stall parking area, a truck staging area and parking lot, two (2) access drives from /to Dempsey Trail. The building footprint will occupy approximately twenty -nine percent (29 %) of the site, the parking and other impervious surface will occupy twelve percent (12 %) and the remaining fifty -nine percent (59 %) is open space and setback area. Proposed placement of improvements, as depicted, will meet the dimensional regulations of the M -2 Zoning District. Access /Parking Access to the development site will be provided by two (2) access drives. One full access drive is located on the eastern portion of the site and leads to the parking, maneuvering area and to the overhead door leading into the plant. The second access drive is an egress only drive at the western portion of the site leading out of the plant via a second overhead door. This access configuration allows for "flow- through" movements of trucks to enter the plant, unload material and exit the plant. Parking spaces are proposed to include two stalls situated on the east side of the building. The two stalls meet Zoning Ordinance regulations of 1.5 stalls per employee as the use will only have one part-time plant employee. Buildings The plant structure is designed with an extremely gentle sloped gable roof with an overall height of approximately thirty -six (36) feet. The building is a pre- engineered steel building and the exterior is proposed to be metal sided. The fagades are utilitarian in nature and include only overhead doors and access doors on the east and west sides. Concern was expressed over the high visibility of the multiple pieces of mechanical equipment visible on the exterior of the structure and it is recommended that landscaping be included on the site to partially screen the structure itself from the south, which is a commercial area. Little concern was expressed during review about the appearance of the structure from the north, west and east as the make -up of uses in those areas are highly industrial themselves. Lighting & Signage Signage, lighting and /or photometric plans were not included within the application material and will be required to meet code requirements. Landscaping As this site is situated in the M -2 zoning district, development does not require landscaping or the submittal of a landscape plan. However, staff wants to point out that much of the site is currently gravel and recommends that a condition of approval be that the gravel areas of lot be restored to vegetative ground cover. Additionally, as mentioned above, because of the visibility of the Item -755 Dempsey CUP /Public Utility mechanical equipment on the south side of the structure to the commercial area along Witzel Avenue, staff recommends landscaping be installed to act as screening of the structure from the south. Stormwater Management Grading, erosion control and stormwater management plans have not been submitted with the application. Stormwater management is currently being engineered and staff would like to point out that grading, erosion control and stormwater management plans will have to be approved by the Department of Public Works during regular building permit application. RECOMMENDATION /CONDITIONS The Department of Community Development recommends findings that the proposed conditional use permit request is consistent with Section 30 -11(D) of the Zoning Ordinance and be approved with the following conditions: 1. Southern lot line is adjusted as depicted. 2. Landscaping incorporate screening to the south, as approved by the Department of Community Development. 3. Gravel areas of development area are restored to vegetative ground cover. 4. No outdoor storage of material, machinery or equipment. The Plan Commission approved of the conditional use permit as requested with conditions noted. The following is the Plan Commission's discussion on this item. Mr. Buck presented the item and reviewed the site and surrounding area, the current land uses in the area and the site plan for the proposed power plant. He also reviewed the parking, access drives, and elevations for the subject site as well as the recommended landscaping to be placed on the southern side of the proposed structure as the recommended condition. Mr. Monte questioned if the lot line of the current parcel was to be moved to the south to accommodate this development, how the setbacks will be affected. Mr. Buck responded that the lot line reconfiguration should not create a conflict as there were no required setbacks in an M -2 industrial zoning district. Mr. McHugh arrived at 4:10 pm. Ms. Lohry inquired where the sludge for the facility would be obtained, how many trucks were anticipated to be accessing the site on a regular basis, and if the facility would be creating fowl odors. Mr. Buck replied that the organic waste would be obtained by UW- Oshkosh to fuel the plant but he was not aware of the exact source nor did he have information on the number of trucks accessing the site but the applicant indicated approximately one a day. In reference to the odors that may be generated from the plant, the City has general code to regulate nuisances such as fowl odors however the plant was proposing to utilize a filtering system that would mitigate the creation Item -755 Dempsey CUP /Public Utility of offensive smells. He also commented that the City sewage plant is located across the street from the site. Ms. Lohry commented that the proposed structure is not very conducive with the commercial area on Witzel Avenue as far as aesthetics. Mr. McHugh agreed. Mr. Buck responded that the structure is an industrial building and was appropriate for the proposed use and is located in an M -2 industrial zoned area. Mr. McHugh questioned if the grass and gravel areas were to remain on the site and how that compares to the code requirements. Mr. Buck replied that the conditions recommended the graveled areas on the site be restored to vegetative ground cover after the development is constructed and access drives are required to be hard surface, by ordinance. Mr. McHugh also inquired if the City should retain this property for the possibility of future expansion of the sewage treatment plant. Mr. Buck responded that the City does not currently own the property where the development is being proposed. Mr. McHugh suggested the City acquire the site. David Patek, Director of Public Works, stated the current treatment plant site has possibilities for expansion and that the City has retained the property previously used to house the animal shelter on Dempsey Trail. He further commented that the treatment plant was expanded in the 1990's and had sufficient capacity to operate for at least 20 years. Discussions have taken place regarding plans to use additional lands, but without knowing what treatment processes will be available in the future, no plans for expansion are eminent at this time. Mr. McHugh commented that since there is not much available property in the area if expansion was necessary, he felt it was unacceptable to not acquire this property for possible future city use. Mr. Thorns questioned if there was a reason this project has to be located at the site proposed. Mr. Buck responded that it was being located next to the University's facility building, met zoning and is a compatible use. Mr. Thorns then questioned why staff was recommending landscape screening on only the south side of the structure and not the other facades. Mr. Buck replied that the proposed structure is located in an M -2 industrial zoned area, which does not require landscaping however the south side was proposed for screening as it faces Witzel Avenue which has become more of a commercial area. All other sides of the proposed structure are adjacent to other industrial uses. Item -755 Dempsey CUP /Public Utility Tom Sonnleitner, representing the University, 800 Algoma Boulevard, stated that both the University and the City can be at the forefront of a movement that will eventually sweep across the country. These types of power plants are already utilized in both Europe and Asia. The plant will take dry organic material for fermentation which will be composted inside the building on a weekly basis. There will only be a few trucks accessing the site per week and the operation will be enclosed in the structure. It will establish a living, learning facility of renewable energy infrastructure. He further stated that the reason this site was chosen was because of its close proximity to the campus and the property was already owned by the University. Students and faculty will be running the facility and he felt this development was important to both the campus and the community. It will be the first installation of this type of facility in the United States. He also commented that the facility would not be processing sludge but would be dealing with dry product only and that concerns voiced regarding foul odors should not be an issue as any odors would be contained within the facility as no operations would be functioning outside the structure. The aesthetics of the structure would be made as pleasing as possible and considering the property separation between this site and the site located on Witzel Avenue, which may be sold to another entity, will be shielded from view from Witzel Avenue. They will make every effort to screen the development from this corridor and the electricity generated will be sold to the grid and the heat piped to various buildings. The development will be paid for over time and the University is receiving grants from the government for approximately $700,000 for this facility. Mr. Hinz inquired if the yard waste to be used for the facility would be picked up from the City's drop -off site, if companies and individuals would be bringing in waste from other areas, or if obtaining it from the City's site would be more economically feasible. Mr. Sonnleitner responded that they are in the process of working with the City on some type of agreement to obtain the waste material from the City. However, in winter months it may be necessary to also have arrangements to obtain waste material from farmers to keep the plant operational. He further commented that the site was not large enough to handle drop offs from outside individuals and other sources. Mr. McHugh questioned if there would be a limit on drop offs accepted at the site and if it would be limited to city residents only or if residents from the surrounding townships would be utilizing the site as well. Mr. Sonnleitner reiterated that the site would not be accepting drop offs from individuals but will be obtaining yard waste from the City's service garage and that they were still in the process of working out the contract with the City. Mr. McHugh commented that there are already issues with the odor coming from the current drop off site by the City garage and questioned how far we should go with this type of activity in this area. Mr. Thoms inquired if the proposed plant had some type of features that would prevent odors. Ryan Novak, Project Manager for Bioferm Energy Systems, 617 N. Segoe Road, Madison, explained the process of the bio filters used in this system which cleanse odors from the materials to virtually eliminate any smells from the operation. He further commented that the landscaping Item -755 Dempsey CUP /Public Utility around the facility would screen its visibility from Witzel Avenue and that the access drives would be paved. Ms. Lohry questioned if there was still an odor present, how would it be eliminated. Mr. Novak further explained the functions of the bio filters and how they handle the odors and also commented on the restrictions of the DNR that also must be followed for the development of this type of facility. Ms. Propp inquired if this was the first plant of this type in Wisconsin. Mr. Novak responded that it was the first plant in the United States although there are approximately 30 of these types of power plants already operating in Europe. Mr. Sonnleitner added that he has visited several of the sites personally. Mr. Buck asked if it was determined at a later date that the facility was omitting an offensive odor, could the filters be modified and the situation be improved. Mr. Novak responded affirmatively. Michael Lizotte, Sustainability Director for the University, stated that odors from the current city garage facility are creating issues and the movement of the material from this site to the energy plant should help to reduce the odors and actually be an improvement to the present situation. Mr. McHugh commented that he felt that disturbing the piles of compost will cause more issues with odors from the site. Mr. Lizotte stated that they would be changing out the compost on a weekly basis and hope to move the yard waste before it starts to create odors and that this proposal is part of a solution to the present issues. Ms. Propp stated that she felt this was an exciting concept and was utilizing proven technology and she was in favor of the proposal. Mr. Bowen commented that he did not have an issue with the aesthetics of the structure as it is a functional use in an M -2 area and it does not necessarily have to be attractive. Mr. Thoms agreed and stated that the project itself should be applauded. These facilities have already been operational in Europe and this facility will be utilized for both teaching as well as a functional use in the community. Ms. Lohry commented that she supports the efforts and goals of the University but does not approve of the site's location. She felt it was located too close to residential properties. Mr. Monte questioned what impact this would have since the Comprehensive Plan recommends commercial use for this area. Item -755 Dempsey CUP/Public Utility Mr. Buck replied that as this was an industrial zone, which allows commercial uses. Though the use is not distinctly commercial, it is not typical heavy industry as there is no outdoor storage, heavy traffic, etc. so was felt not to be in conflict with the Comprehensive Plan. Mr. Monte then questioned the adjustment to the southern lot line and how it would impact the commercial use on the lot located on Witzel Avenue. Mr. Buck responded that it should not negatively impact this property as it would still be large enough to be a developable commercial lot and the landscape buffering would shield the view of the industrial site to the north. Mr. Fojtik commented that based on the current zoning, this was an appropriate use in this area. He further commented that there were both pubic and private owned lands surrounding this site and the parcels have evolved into various uses that are both commercial and industrial in nature and he felt that the proposed power plant fits at this location. Mr. Hinz stated that he applauded the University for this development as it helps the City with a functional use for yard waste and is the first facility of this type in the country. He felt that not only would it serve a functional use but would attract people to the city to view the facility. Mr. McHugh commented that there was money appropriated in the budget to move the Street Department facilities to another location which would leave the facility with no immediate source for material for this project. He further commented that it should be located somewhere else that would be away from a main drag such as Witzel Avenue as it has the potential to impact the neighborhood with noise, odors, and traffic problems. Motion by Nollenberger to approve the conditional use permit for a public utility structure /power plant at 755 Dempsey Trail as requested with the following conditions: 1. Southern lot line is adjusted as depicted. 2. Landscaping incorporate screening to the south, as approved by the Department of Community Development. 3. Gravel areas of development area are restored to vegetative ground cover. 4. No outdoor storage of material, machinery or equipment. Seconded by Bowen. Motion carried 7 -2. Ayes- Bowen /Thoms /FojtiklHinz /Propp /Monte/ Nollenberger. Nays- McHugh/Lohry. Item -755 Dempsey CUP /Public Utility City of Oshkosh Application ❑ Planned Development Review O.fHKO,rH ❑ Conditional Use Permit Review ON THE WATER * *PLEASE TYPE OR PRINT USING BLACK INK ** SUBMIT TO: Dept. of Community Developmei 215 Church Ave., P.O. Box 1130 Oshkosh, Wisconsin 54903 -1130 PHONE: (920) 236 -5059 Z .Ld �10e, , ro ilv. 104 ��qc) Tb�IU{ i"luak r�r f7�x.+:m1 FS:�cl� APPLICANT INFORMATION Petitioner: &" -e"SI Sx5kw5 Date: R- 14 -01 Petitioner's Address: & ll N Sca AD&A City: MUAiso�l State: W -1 Zip: 53706' Telephone #: (Go? ) 1 -I 67 55 Fax: ( Other Contact # or Email: tlpVrp (O;, rfV1 e4e4 7 14 ,e0m Status of Petitioner (Please Check): ❑ Owner ❑ Representative ❑ Tenant ❑ Prospective Buyer K Nsip, fie +tJ#V- Petitioner's Signature (required): OWNER INFORMATION A 1 . 4 — Date: 17 -14-0 7 Owner(s): (,lnway of (J iston - Osln Iwsh d• rtc1cl%vtg Date: (Z- - 01 Owner(s) Address: G S S W&W-1 f6vk14 City C76h t�osk State: UJI Zip: 544OX Telephone #: ('t20) 47-q 310, Fax: ( JET?) 414 - O'ASI Other Contact # or Email: 4r✓ heft ®uwc; , k Ownership Status (Please Check): ❑ Individual ❑ Trust ❑ Partnership %Corporation Property Owner Consent: (required) By signature hereon, I/We acknowledge that City officials and/or employees may, in the performance of their functions, enter upon the property to inspect or gather other information necessary to process this application. I also understand that all meeting dates are tentative and may be postponed by the Planning Services Division for incomplete submissions or other administrative reasons. Property Owner's Signature: STEVIE .� -) At< "J� i SITE INFORMATION Date: 31V2 Address/Location of Proposed Project: - 7 3;L a, ?3q Id 4U l 1)vt Parcel No. Proposed Project Type: Rthtwwblt Entry Current Use of Property: CMPI naf u5CJ Zoning: Land Uses Surrounding Site: North: South: cde* "sk d• rtc1cl%vtg a r ey East: rde ;+ 5kc(44i r West: "Please note that a meeting notice will be mailed to all abutting property owners regarding your request. ➢ Application fees are due at time of submittal. Make check payable to City of Oshkosh. ➢ Please refer to the fee schedule for appropriate fee. FEE IS NON - REFUNDABLE For more information please the City's website at www.ci. oshkosh .wi.us /Community_Development/Pl g,htm Staff Date Rec'd �l c7 Briefly explain how the proposed conditional use/development plan will not have a negative effect on the issues below. 1. H ealth, safety, and general welfare of occupants of surrounding lands. tf+G Q�0.N l5 !(2Si�jtietl - JD •Ua6"M AL �t�I cf 4�x tor, L -im- 61 r�v�tcn� i✓R4�f� QtGI�II!•k 'er,.a.5 4.>^d He'+, ,t A rYdm paitura s 2. Pedestrian and vehicular circulation and safety. �r1 1 li��:C �cv'- `t,G1(4,1. in'I'D DG'I 0 '%�jt �R✓� i5 Cjt S�fM4-� 'rD L(��ITw elf th f '�tJW 1 �T ,1 1 u - �e. P�aN� �i`v!� -►ale. tltrYeN� Y'cd�u^� -y SySt� �►'l P��S�U+'1 4cde�.,t.�I <S htarlo'� 4-: i � �2. �'+tcr,'�tl"S� 3. Noise, air, water, or other forms of environmental pollution. Ile- (6-4 is dlrclif af%keJ -to rtdulL cnviPo: � Qd�lwi+�� 4. The demand for and availability of public services and facilities. Lt Jeh anj {Or• et-A % 5 t5�000 {Plin� � "" 6"k no i)nCO-+ t.. I& 1,>a( �i�b 5errve.s 'C4 6LM. - fit5. - Thc usMkA chcvu- i9 arv, itc Pwbl;c }o lour t 5. Character and future dev of the area. L 4� 6,4 f" %� ��''ti5k IY110 e'.V12V�7 j 141_ J r e 9(o6 I-arm-ji imp4cli SUBMITTAL REQUIREMENTS - Must accompany the application to be complete. A NARRATIVE of the proposed conditional use/Development Plan including: ❑ Existing and proposed use of the property ❑ Identification of all structures (including paving, signage, etc.) on the property and discussion of their relation to the project ❑ Projected number of residents, employees, and/or daily customers ❑ Proposed amount of dwelling units, floor area, landscape area, and parking area expressed in square feet and acreage to the nearest one - hundredth of an acre ❑ Effects on adjoining properties to include: noise, hours of operation, glare, odor, fumes, vibration, etc. ❑ Compatibility of the proposed use with adjacent and other properties in the area. ❑ Traffic generation (anticipated number of customers, deliveries, employee shift changes, etc.) ❑ Any other pertinent information to properly understand the intended use /plan and its relation to nearby properties and the community as a whole A A complete SITE PLAN and BUILDING ELEVATIONS must include: ❑ Two (2) full size ( minim um 24" x 36 ") scaled and dimensioned prints of site plan and building elevations ❑ Two (2) 8 '' /z" x 11 ( to 11" x 17" (maximum) reduction of the site plan and building elevations ❑ One compact disc or diskette with digital plans and drawings of the project in AutoCAD 2000 format with fonts and plot style table file (if plans have been prepared digitally) ❑ Title block that provides all contact information for the petitioner and/or owner and contact information of petitioner's engineers /surveyors /architects, or other design professionals used in the preparation of the plans ❑ The date of the original plan and revision dates, if applicable ❑ A north arrow and graphic scale. ❑ All property lines and existing and proposed right -of -way lines with dimensions clearly labeled ❑ All required setback and offset lines ❑ All existing and proposed buildings, structures, and paved areas, including building entrances, walks, drives, signs, decks, patios, fences, walls, etc. ❑ Location of all outdoor storage and refuse disposal areas and the design and materials used for screening ❑ Location and dimension of all on -site parking (and off -site parking provisions if they are to be employed), including a summary of the number of parking stalls provided per the requirements of Section 30 -36 City of Oshkosh Zoning Ordinance ❑ Location and dimension of all loading and service areas ❑ Location, height, design, illumination power and orientation of all exterior lighting on the property including a photometrics plan ❑ Location of all exterior mechanical equipment and utilities and elevations of proposed screening devices where applicable (i.e. visible from a public street or residential use or district). Mechanical equipment includes, but is not limited to; HVAC equipment, electrical transformers and boxes, exhaust flues, plumbing vents, gas regulators, generators, etc. 0 E N E R G Y S Y S T E M S VIESMANN Group Submittal Narrative for the University of Wisconsin - Oshkosh Renewable Energy Plant The University of Wisconsin- Oshkosh (UWO) has contracted with Bioferm Energy Systems ( Bioferm) in Madison, Wisconsin to build a 27,000 square foot renewable energy plant at 732 Witzel Avenue in Oshkosh, Wisconsin for the purpose of converting organic waste into energy. The site location is currently undeveloped and located just west of the current UWO Facilities Office. The site location represents a convenient industrial location, adjacent to the universities current recycling operation located on the south side of Witzel Avenue. Please see the conceptual site plan submitted with this narrative for identification of all structures including the orientation of the plant on the proposed site. The plant includes a flow- through entrance and exit that allows trucks to enter the plant, unload material, and exit the plant from the opposite end. With an estimated number of one (1) part-time (15 — 20 hours weekly) plant employee, four (4) parking spaces plus one (1) handicapped parking space have been included. At the entrance to the plant, visitors will be greeted by a sign that reads "University of Wisconsin- Oshkosh Renewable Energy Plant ". The plant, itself, includes a number of key, individual rooms including: fermenting chambers, combined heat and power room, a mixing aisle, waste storage, and an office. These key areas of the plant are necessary to convert organic waste into heat and /or energy via a dry fermentation process patented by Bioferm. The plant includes one -month of on -site storage of organic waste and a twenty -eight (28) day industrial process timeline that allows for approximately two (2), two -ton truck deliveries per day. A front loader is required to maneuver waste and will be operational for approximately eight (8) hours per week. As of December 21, 2009, the total impervious area for the construction of the plant, parking lot, and driveways is approximately 35,000 square feet (0.8 acres). The overall impact of the plant on the Oshkosh community is highly beneficial to the safety, health, and quality of life of the local residents. The plant represents a state -of- the -art technology that converts organic waste into energy and heat which will reduce local landfill accumulated quantities, provide heat and electricity to the local community at less expensive financial premiums, reduce methane emissions to the atmosphere, and minimize global warming. The plant's technology is coherent with the drive for a sustainable, green environment that the Oshkosh community may be proud of. The plant's hours of operation will be continuous and it will be operational 365 days out of the calendar year. Emissions of organic waste fumes from the plant are reduced by an organic Biofilter that forces the air through moist wood chips to remove the odor. Noise from delivery trucks entering and exiting the plant should be anticipated as well as front loader traffic when the mixing aisle doors of the plant are opened. The front loader will be indoors approximately ninety percent of the time. The site at 732 Witzel Avenue has been selected as the surrounding area currently provides an industrial and recycling operation, and the renewable energy plant will currently align with the area's defined recycling intention. No design or operational intent is above or beyond the current intention for this area. Construction of the facility is anticipated between the months of March and November of 2010. Traffic and parking on Witzel Avenue and Dempsey Trail will be affected by parking of construction employees, loading and unloading of 617 N. Segoe Road, PO Box 5408, Madison, WI 53705 Tel. 608.845.2193, Fax 608.845.0482 www.BlofermEnergy.com /0 B I F E R fYI EN E RGY SYS T E PA S VIESMANN Group construction materials and equipment, and construction of utilities located beneath roadways. The approximate maximum number of construction employees on -site during peak construction in the summer and fail of 2010 is approximately twenty (20) employees per day. Traffic generation, during operation of the facility, on the other hand, is much less than construction traffic generation and not scoped to be beyond or any different than the current recycling operation located on Witzel Avenue. Thank you for your time and consideration. Feel free to contact us for any additional information or questions. Steve Arndt Director of Facilities Management University of Wisconsin- Oshkosh 920 - 424 -3102 Ryan Novak Construction Manager Bioferm Energy Systems 608 - 467 -5648 617 N. Segoe Road, PO Box 5408, Madison, WI 53705 Tel. 608.845.2193, Fax 608.845.0482 www.BiofermEnergy.com It 13 CUP - RENEWABLE ENERGY PLANT 755 DEMPSEY TR PC: 02 -16 -10 CITY OF OSHKOSH PO BOX 1130 OSHKOSH WI 54903 1130 RE 233 N CAMPBELL /815 DEMPSEY UNIVERSITY OF WIS OSHKOSH ATTN STEVEN ARNDT 615 WITZEL AV OSHKOSH WI 54902 BOARD OF REGENTS UWO 800 ALGOMA BLVD OSHKOSH WI 54901 8601 RE 650 WITZEL AV BIOFERM ENERGY SYSTEMS 617 N SEGOE RD MADISON WI 53705 UW OSHKOSH FOUNDATION WITZEL LLC 842 ALGOMA BLVD OSHKOSH WI 54901 3551 RE 732 WITZEL AV AUTO AUTHORITY PROPERTIES 804 WITZEL AVE OSHKOSH WI 54902 14 f "S L ill R � Fk, DISCLAIMER This map is neither a legally recorded map nor a survey and it Is not Intended to be used as one. This drawing Is a compilation of records, data and information located in various city, county and state offices and other sources affecting the area shown and It is to be used for reference purposes only. The City of Oshkosh is not re- sponsible for any Inaccuracies herein contained. If discrepancies are found, please contact the City of Oshkosh. Created by - dff RENEWABLE ENERGY PLANT 755 DEMPSEY TR N A Scale: 1" = 200' fHK 1H ON THE WATER City of Oshkosh Department of Community Development 01/29110 1° a i �� � IICiI �1111�1 lip Be pt w � 6 w I i ' • It L 11111 I IIII _.,•» Or s oil if W- :Y!!lll r � ■. This map Is neither a legally recorded map nor a survey and it is not intended to be used as one. This drawing Is a compilation of records, data and information located in various city, county and state offices and other sources affecting the area shown and It is to be used for reference purposes only. The City of Oshkosh is not re- sponsible for any Inaccuracies herein contained. If discrepancies are found, please contact the City of Oshkosh. 755 DEMPSEY TR N Of HK H ow Txe waw City of Oshkosh Department of Scale: 1 200 Community Development 01/29110 Created by - dff DISCLAIMER RENEWABLE ENERGY PLANT